Loading...
2012, 11-19 Permit SW-12002561 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW-12002561 Permit Issued Date: 11/19/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: WATER RECOVERY SERVICES INC Project Name: EDGERTON Applicant: WATER RECOVERY SERVICES INC Permit Type: SEWER Address: 2309 S CHERRY LN SPOKANE, WA 99223 Phone: 509-953-1015 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: 2407 N COLEMAN RD 35121.9027 12 25 43 N1/2 OF S155FT OF W128FT OF E148FT OF S1/2 OF SE1/ 4 OF SW1/4 OF NE1/4 Owner: Address: Phone: Email: LAWLER, MEGAN P 5719 N HAYE RD NEWMAN LAKE, WA 99025 Water District: Orchard Fire District: Spokane Valley Fire Avenue Irrigation District #6 Zoning: Land Area: 0.23 Acre(s) CONTRACTOR INFORMATION: General Contractor WATERRS947RR WATER RECOVERY SERVICES INC 2309 S CHERRY LN SPOKANE, WA 99223 509-953-1015 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 11/19/2012 11:18:32 Printed by: IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002561 11/19/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/19/2012 11:18:32 Printed by: I IS APPPOOL\SmartGovProdApp