Loading...
2010, 12-23 Permit App 1004040 Pole BldgProject Number: 10004040 Inv: 1 Application Date: 12/23/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: NEW 28 X 30 POLE BLDG - STORAGE Contact: WAHLERT, MICHAEL H Address: 2416 N COLEMAN C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 981-5543 Group Name: Site Information: Project Name: Plat Key: Name: Range w District: Nort Parcel Number: 35121.6219 Block: SiteAddress: 2416 N COLEMAN RD Location:: CSV Lot: Owner: Name: WAHLERT, MICHAEL H Address: 2416 N COLEMAN SPOKANE VALLEY, WA 99212 Zoning: R-2 SF Res Suburban District Water District: 002 ORCHARD AVENUE Area: 9,547 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released B " Y� Originally Released: 12/21/2010 By: TMELBOU Septic Sys Review Released By: Originally Released: 12/17/2010 By: LHALSEY Landuse/Zoning/HE Conditions Released By: Within the Airport Hazard Overlay Originally Released: 12/23/2010 By: mpalaniuk Permits: Operator: jmm Printed By: jmm Print Date: 12/23/2010 / Project Number: 10004040 Inv: 1 Application Date: 12/23/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: OWNER Building Permit Firm: OWNER Phone: (000)000-0000 Item Description This Application: Description Gm Tvve Notes Sq Ft Valuation POLE BDLG U-1 VB PLAN 840 $15,960.00 REVIEW 1 SELECT FEE 1 AMOUNT Totals: 840 $15,960.00 Item Description Units Unit Desc RESIDENTIAL PERMIT FEE 1 SELECT ACCESSORY PLANS REVIEW 1 SELECT WSBCC SURCHARGE 1 SELECT RECORDING FEES 1 AMOUNT Notes: Total Project: Su Ft Valuation 840 $15,960.00 840 $15,960.00 Fee Amount $265.25 $82.06 $4.50 $63.00 Permit Total Fees: $414.81 7222 E UTAH AVE --PROPERTY MUST BE DIVIDED TO ADD THE RESIDENCE IN THE SHOP. THE EXISTING SHOP CAN BE EXPANDED TO A MAXIMUM OF 1,029 SF. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine Building Permit $414.81 $414.81 $66.31 $348.50 $414.81 $414.81 $66.31 $348.50 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 12/23/2010 / Permit Center or 11703 E Spral kane Spokane Val jUalley° cs CommunityDevel�pment _�gtv61� Permit -Se 3 PERMIT NUMBER: 99206 ` PERMIT FEE: /1;n0NrSM_nn17 New Construction ® Accessory Bldg Addition/Remodel ❑ Deck Other: ASSESSORS PARCEL No: 3 5'l a-1 - 6 Z 19 LEGAL DESCRIPTION: Building Owner: DIMENSIONS: Contractor: Name: Name: L MAIN FLOOR TO SQ. Address: S q )Q Address: FTG: N c ' City: S n krnIF Vali State: yVo Zip: ! City: State: Zip: Phone: So q�! Fax: 3 S Y3 �/l1- Q/ 77 Phone: Fax: ti0 0 F Contractor Lic No: Exp Date: Contact Person CONSTRUCTION TYPE: City Business Lic. No: Name: c vt Phone: 5 o V q2t $ 3 Describe the scope of work in detail: of Proposed Use: s l o r Cost of Project: $ 5 A 0,0 **************The fallowinn MTJST he cmmnlete: (write N/A if not HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: (S : t - 30 MAIN FLOOR TO SQ. 2 IND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: ' AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECKICOV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: ti0 0 F PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permftee verges, acknowledges and agrees by their signature that: 1) If this permit is for con dwelling islwill be served by potable water. 2) Ownership of this City of Spokane Valley Permit int signatory is the property owner or has permission to represent the property owner in this transactic in full compliance with the City of Spokane Valley Development Code. Referenced codes are ave' Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval local laws, codes or ordinances. 6) Plans or additional information may be required to be submitt( this application can be processed. SIGNATURE: 7u v y DATE: i) - Method of Payment: Q Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIII Authorized Signature: REVISED 211907 re SPokan jValley For City Use Only PLUS Project Number Project Address -2(11(,2 /'1 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is / _)2 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. This for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07 DEPT. APPROVE Drl ye way BY: r 1 DATE: fend 13 y` S -- 21'- 13 l-- I lot" 30 S PLAN MING DEPT. APPROVED �> BY: ��%a� DATE: W t pope,/ 35I� 6�Iy L^1 .2 r�. F67- FsV ECgIVED PERMIT CENTER DEC 15 2010 tProject� 3 7 — iName — 21' — S u s- ,VoriEc t5 NER6lnl Moi ow THRr7i ,5 Pftii e..ry ✓s F IMAM D i,✓✓rNinJ 7ltE /li ¢yo2f /tRzhkA bJGecnY � pf Tne WY OF MOKANe t!QGGEY, WA 1,vo is SOK76cr Tp stn.c7ioNs ON NEi4Hr Rn'A ✓se jVleWA'rr TV sdMC 0-110,o30 Al2Po2T AlMiU, pyepelgy Vii: As If AMT 36 RML -Naeem Trnte Tt7 TIM & 1 16 /V Golgi rr()n I4V S p o jcou+t. Valley qy // DEPT. APPROVE Drl ye way BY: r 1 DATE: fend 13 y` S -- 21'- 13 l-- I lot" 30 S PLAN MING DEPT. APPROVED �> BY: ��%a� DATE: W t pope,/ 35I� 6�Iy L^1 .2 r�. F67- FsV ECgIVED PERMIT CENTER DEC 15 2010 tProject� 3 7 — iName — 21' — S u s- ,VoriEc t5 NER6lnl Moi ow THRr7i ,5 Pftii e..ry ✓s F IMAM D i,✓✓rNinJ 7ltE /li ¢yo2f /tRzhkA bJGecnY � pf Tne WY OF MOKANe t!QGGEY, WA 1,vo is SOK76cr Tp stn.c7ioNs ON NEi4Hr Rn'A ✓se jVleWA'rr TV sdMC 0-110,o30 Al2Po2T AlMiU, pyepelgy Vii: As If AMT 36 RML -Naeem Trnte Tt7 TIM & I.) IG Tl" . l(.J ..e....I L� .P... r......z, .Es...... fC.. x. • .� 6vt� 1:n...J t 'AC"OW'D4ML . 4."—ti1.i (�,Lr• l 1.5. .tom, 47,yMP--^.' ci%.Tiric T= FIRST ADDITION 1'a TQ Y EDGERTON 5 POKAN E COUNTY, WASH. i II a 12 • > I a• O PO KANlLOGN�L. ENG. CO., Grva�xmnw .a• 7 I I 10 9 7 6 5 4 D 2 I I I' YI la ZI i> AVENUE D• �Y r� YI I� ai I I 13 14 15 I6 17 18 19 20 o I I I I I.) IG Tl" . l(.J ..e....I L� .P... r......z, .Es...... fC.. x. • .� 6vt� 1:n...J t 'AC"OW'D4ML . 4."—ti1.i (�,Lr• l 1.5. .tom, 47,yMP--^.' ci%.Tiric T= 1'a Y i II a 12 • a° a• a .a• 7 I.) IG Tl" . l(.J ..e....I L� .P... r......z, .Es...... fC.. x. • .� 6vt� 1:n...J t 'AC"OW'D4ML . 4."—ti1.i (�,Lr• l 1.5. .tom, 47,yMP--^.' ci%.Tiric T= Spokane ,,jValley 11707 E Sprague Ave Suite 106 * Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhat[@spokanevalley.org Michael Wahlert December 21, 2010 2416 N Coleman Rd Spokane Valley, WA 99212 Ref: Residential Permit Paving Waiver Dear Mr Wahlert, You are hereby granted a waiver from the paving requirements contained in Spokane Valley Municipal Code Section 19.40.020 (B) which states, "All residential driveways and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material." This waiver is granted only for 2416 N Coleman Rd, Project No. 10004040, a 840 square foot storage building. This decision to waive the paving requirement was predicated on the following: 1. Your written statement regarding your anticipated use of the building as storage and shop use with limited vehicular access. You are required to notify the City of Spokane Valley if any of this condition changes. This waiver may be revoked at any time should the conditions of use change such that the City of Spokane Valley determines paving is warranted. At that time you will be required to obtain the necessary approval and pave the driveway. Kathy McClung Community Development Director Attachments: Paving Waiver Request Proposed Site Plan I/ T t h e s h 0/1 P of for (/ O/? l cif U Uf 161 111,,0, f ort s �y 'I Gni,e 1901v WoriC �orr\Ih�r 0/f �^pn OV Spo ani 1/oP fr 351�� _G1�y /)- /k,/0 n