2010, 12-23 Permit App 1004040 Pole BldgProject Number: 10004040 Inv: 1 Application Date: 12/23/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: NEW 28 X 30 POLE BLDG - STORAGE Contact: WAHLERT, MICHAEL H
Address: 2416 N COLEMAN
C - S - Z: SPOKANE VALLEY, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 981-5543
Group Name:
Site Information: Project Name:
Plat Key: Name: Range w District: Nort
Parcel Number: 35121.6219 Block:
SiteAddress: 2416 N COLEMAN RD
Location:: CSV
Lot:
Owner: Name: WAHLERT, MICHAEL H
Address: 2416 N COLEMAN
SPOKANE VALLEY, WA 99212
Zoning: R-2 SF Res Suburban District
Water District: 002 ORCHARD AVENUE
Area: 9,547 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review Released B "
Y�
Originally Released: 12/21/2010 By: TMELBOU
Septic Sys Review Released By:
Originally Released: 12/17/2010 By: LHALSEY
Landuse/Zoning/HE Conditions Released By:
Within the Airport Hazard Overlay
Originally Released: 12/23/2010 By: mpalaniuk
Permits:
Operator: jmm Printed By: jmm Print Date: 12/23/2010 /
Project Number: 10004040 Inv: 1 Application Date: 12/23/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000)000-0000
Item Description
This
Application:
Description Gm Tvve Notes
Sq Ft
Valuation
POLE BDLG U-1 VB PLAN
840
$15,960.00
REVIEW
1
SELECT
FEE
1
AMOUNT
Totals:
840
$15,960.00
Item Description
Units
Unit Desc
RESIDENTIAL PERMIT FEE
1
SELECT
ACCESSORY PLANS REVIEW
1
SELECT
WSBCC SURCHARGE
1
SELECT
RECORDING FEES
1
AMOUNT
Notes:
Total Project:
Su Ft Valuation
840 $15,960.00
840 $15,960.00
Fee Amount
$265.25
$82.06
$4.50
$63.00
Permit Total Fees: $414.81
7222 E UTAH AVE --PROPERTY MUST BE DIVIDED TO ADD THE RESIDENCE IN THE SHOP.
THE EXISTING SHOP CAN BE EXPANDED TO A MAXIMUM OF 1,029 SF.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine
Building Permit $414.81 $414.81 $66.31 $348.50
$414.81 $414.81 $66.31 $348.50
Disclaimer.
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 12/23/2010 /
Permit Center
or 11703 E Spral
kane Spokane Val
jUalley° cs
CommunityDevel�pment _�gtv61�
Permit
-Se 3 PERMIT NUMBER:
99206 ` PERMIT FEE:
/1;n0NrSM_nn17
New Construction ® Accessory Bldg
Addition/Remodel ❑ Deck
Other:
ASSESSORS PARCEL No: 3 5'l a-1 - 6 Z 19 LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS:
Contractor:
Name:
Name:
L
MAIN FLOOR TO SQ.
Address: S q
)Q
Address:
FTG:
N c
'
City: S n krnIF
Vali State: yVo Zip: !
City: State: Zip:
Phone:
So q�!
Fax:
3 S Y3 �/l1- Q/ 77
Phone: Fax:
ti0 0 F
Contractor Lic No: Exp Date:
Contact Person
CONSTRUCTION TYPE:
City Business Lic. No:
Name: c
vt
Phone: 5 o V
q2t $ 3
Describe the scope of work in detail:
of
Proposed Use: s l o r
Cost of Project: $ 5 A 0,0
**************The fallowinn MTJST he cmmnlete: (write N/A if not
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
(S
: t - 30
MAIN FLOOR TO SQ.
2 IND FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
'
AREA:
FINISHED BASEMENT
GARAGE SQ. FTG:
DECKICOV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG:
ti0 0 F
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permftee verges, acknowledges and agrees by their signature that: 1) If this permit is for con
dwelling islwill be served by potable water. 2) Ownership of this City of Spokane Valley Permit int
signatory is the property owner or has permission to represent the property owner in this transactic
in full compliance with the City of Spokane Valley Development Code. Referenced codes are ave'
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitt(
this application can be processed.
SIGNATURE: 7u v y DATE: i) -
Method of Payment:
Q Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIII
Authorized Signature:
REVISED 211907
re
SPokan
jValley
For City Use Only
PLUS Project Number
Project Address -2(11(,2 /'1
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is / _)2
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
This for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07
DEPT. APPROVE Drl ye way
BY:
r 1
DATE:
fend
13 y`
S
-- 21'-
13
l--
I
lot"
30
S
PLAN MING DEPT. APPROVED
�>
BY: ��%a�
DATE:
W
t
pope,/ 35I� 6�Iy
L^1
.2
r�.
F67-
FsV
ECgIVED
PERMIT CENTER
DEC 15 2010
tProject�
3 7 — iName
— 21' —
S
u
s-
,VoriEc t5 NER6lnl Moi ow THRr7i ,5 Pftii e..ry ✓s
F IMAM D i,✓✓rNinJ 7ltE /li ¢yo2f /tRzhkA bJGecnY �
pf Tne WY OF MOKANe t!QGGEY, WA 1,vo is SOK76cr
Tp stn.c7ioNs ON NEi4Hr Rn'A ✓se jVleWA'rr
TV sdMC 0-110,o30 Al2Po2T AlMiU, pyepelgy
Vii: As If AMT 36 RML -Naeem Trnte Tt7
TIM &
1
16
/V Golgi
rr()n I4V
S
p o
jcou+t.
Valley
qy //
DEPT. APPROVE Drl ye way
BY:
r 1
DATE:
fend
13 y`
S
-- 21'-
13
l--
I
lot"
30
S
PLAN MING DEPT. APPROVED
�>
BY: ��%a�
DATE:
W
t
pope,/ 35I� 6�Iy
L^1
.2
r�.
F67-
FsV
ECgIVED
PERMIT CENTER
DEC 15 2010
tProject�
3 7 — iName
— 21' —
S
u
s-
,VoriEc t5 NER6lnl Moi ow THRr7i ,5 Pftii e..ry ✓s
F IMAM D i,✓✓rNinJ 7ltE /li ¢yo2f /tRzhkA bJGecnY �
pf Tne WY OF MOKANe t!QGGEY, WA 1,vo is SOK76cr
Tp stn.c7ioNs ON NEi4Hr Rn'A ✓se jVleWA'rr
TV sdMC 0-110,o30 Al2Po2T AlMiU, pyepelgy
Vii: As If AMT 36 RML -Naeem Trnte Tt7
TIM &
I.) IG Tl" .
l(.J ..e....I L� .P... r......z, .Es...... fC.. x. • .� 6vt� 1:n...J
t 'AC"OW'D4ML .
4."—ti1.i (�,Lr• l 1.5. .tom,
47,yMP--^.'
ci%.Tiric T=
FIRST ADDITION
1'a
TQ
Y
EDGERTON
5 POKAN E COUNTY, WASH.
i II
a
12
•
>
I
a•
O PO KANlLOGN�L. ENG. CO., Grva�xmnw
.a•
7
I
I
10
9
7
6
5
4
D
2
I
I
I'
YI
la
ZI
i>
AVENUE
D•
�Y
r�
YI
I�
ai
I
I
13 14
15
I6
17
18
19
20
o
I
I
I
I
I.) IG Tl" .
l(.J ..e....I L� .P... r......z, .Es...... fC.. x. • .� 6vt� 1:n...J
t 'AC"OW'D4ML .
4."—ti1.i (�,Lr• l 1.5. .tom,
47,yMP--^.'
ci%.Tiric T=
1'a
Y
i II
a
12
•
a°
a•
a
.a•
7
I.) IG Tl" .
l(.J ..e....I L� .P... r......z, .Es...... fC.. x. • .� 6vt� 1:n...J
t 'AC"OW'D4ML .
4."—ti1.i (�,Lr• l 1.5. .tom,
47,yMP--^.'
ci%.Tiric T=
Spokane
,,jValley
11707 E Sprague Ave Suite 106 * Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhat[@spokanevalley.org
Michael Wahlert December 21, 2010
2416 N Coleman Rd
Spokane Valley, WA 99212
Ref: Residential Permit Paving Waiver
Dear Mr Wahlert,
You are hereby granted a waiver from the paving requirements contained in Spokane
Valley Municipal Code Section 19.40.020 (B) which states, "All residential driveways
and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete,
paver blocks or other equivalent hard surface material."
This waiver is granted only for 2416 N Coleman Rd, Project No. 10004040, a 840 square
foot storage building.
This decision to waive the paving requirement was predicated on the following:
1. Your written statement regarding your anticipated use of the building as storage
and shop use with limited vehicular access.
You are required to notify the City of Spokane Valley if any of this condition changes.
This waiver may be revoked at any time should the conditions of use change such that the
City of Spokane Valley determines paving is warranted. At that time you will be
required to obtain the necessary approval and pave the driveway.
Kathy McClung
Community Development Director
Attachments: Paving Waiver Request
Proposed Site Plan
I/
T
t h e s h 0/1
P of for
(/ O/? l cif U Uf 161 111,,0,
f ort
s �y 'I
Gni,e 1901v WoriC
�orr\Ih�r
0/f �^pn OV
Spo ani 1/oP
fr 351�� _G1�y
/)- /k,/0
n