Loading...
2008, 06-09 Permit App 08002057 Storage Room AdditionProject Number: 08002057 Inv: I Application Date: 6/6/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: ADD STORAGE ROOM Contact: RACUS, MICHAEL S & CHRISTINE A Address: 3013 N COLEMAN C - S - Z: SPOKANE, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 893-0707 Group Name: Site Information: Project Name: Plat Key: 001866 Name: ORCHARD AVE ADD TR 1-228 District: Nort Parcel Number: 35121.1502 Block: SiteAddress: 3013 N COLEMAN RD Location:: CSV Zoning: UR -3.5 Urban Residential 3.5 Water District: Area: 16,117 Sq Ft Width: 85 Nbr of Bldgs: 1 Nbr of Dwellings: I Review Information: Review Building Plan Review Originally Released: Landuse/Zoning/HE Conditions Originally Released: Permits: Lot: Owner: Name: RACUS, MICHAEL S & CHRISTIN Address: 3013 N COLEMAN SPOKANE, WA 99212 Hold: ❑ Depth: 195 Right Of Way (ft): 0 [Released By: _ � I 6/5/2008 By: tmelbourn Released By 6/5/2008 By: tschmidt Operator: JD Printed By: jmm Print Date: 6/6/2008 Project Number: 08002057 Inv: I Application Date: 6/6/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: OWNER Descriotion Gr Twe Notes RES ADD R-3 VB Item Descriotion RESIDENTIAL PERMIT FEE WSBCSURCHARGE SF PLNS RV W < 7999 SQ FT Notes: Payment Summary::,: Pennit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $375.85 $375.85 $0.00 $375.85 $375.85 $375.85 $0.00 $375.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/6/2008 Building Permit Firm: OWNER Phone: (000)000-0000 This Application: Total Project: SQ Ft Valuation So Ft Valuation 168 $15,958.32 168 $15,958.32 Totals: 168 $15,958.32 168 $15,958.32 Units Unit Desc Fee Amount 1 SELECT $265.25 1 SELECT $4.50 1 SELECT $106.10 Permit Total Fees: $375.85 Fee Amount Invoice Amount Amount Paid Amount Owing $375.85 $375.85 $0.00 $375.85 $375.85 $375.85 $0.00 $375.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/6/2008 WCu Walley Community Development Permit Uenter 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 WWW. sookanevalley.org PERMIT NUMBER: PERMIT FEE: Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application gAddition/Remodel ❑ Deck 2 ❑ Other: SITE ADDRESS: 3O 13 A/- C O LCMn n/ /Z,D. 5 POKANL VA LLE 7 , UTA iqw: ASSESSORS PARCEL NO: 35 I Z i . i 5 O 7_ LEGAL DESCRIPTION: U R4HA SEE CXJ4Et Contractor: Name:. Phone: Contractor Lic No: Contact Person City Business Lic. No: Name: MlkE RReus _ Phone: 50a. T9 0. 42 5 3 Describe the scope of work in detail: Cost of Project Fax: Exp Date: $ 3,.2%5 AMI-tl0/4 OF STQIZA ,6 ROOM To EXISTI t.l6 L ku NOrzy Room Proposed Use: 5 N3 **************The followinll MUST be complete: (write N/A if not applicable)********************** HEIGHT TO Z:DIMENSIONS- 1 # OF STORIES: I TOTAL HABITABLE SPACE: I X 4 MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: Ito 2)' poft /,] I X NJA AREA: FINISHED BASEME T GARAGE SQ. FTC: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON • ` SQ. FTG: N Q JV A N A PROPERTY: !v A # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? WOOD Ex1STIM&I C -)AS F A 5awez The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be �processed. SIGNATURE: DATE: e od of Payment: Cash ❑ Check Bankcard #: Authorized Signature: REVISED 2115/07 ❑ Mastercard ❑ VISA Expires: VIN#: 11703 E Sprague Ave Suite B-34 Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 ❑X Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. MX Show the height of any proposed buildings or accessory structures. FX Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. pX Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. MX Floor framing details: Joist type, size, spacing and installation details MX Roof framing plan and details [X Furnace and hot water heater location ❑X All header locations: type, size and connections MX Foundation plan MX Insulation information ❑X Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage Spokane jValley� For City Use Only PLUS Project Number Z OS 1 Project Address ?01 �5 l dt6t-1L 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 1 permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is t The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for aDDroval or Dermit issuance. Tins for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9107 ,1 .;i / `'r,E • - ' CW S 3®I-5 m. CaclolvAll. Olin \JA; t.6 °1 / WA 01612 12 Sol, 5qo , �2-53 15 e9 �- 35fZ1v15OZ CX1S'tING, MOM SIZ- � //5.Z 3F �� ffW Sint IDV,SF Plzopo5c D N5CA �� 1 f--,2` ----> 4le,4 11' 4" 4 z" PAIfAAA,) Of) Li I (; 41 PLANNING DEPT. APPROVED BY: DATE: Ex15'11Ml Htmr .-AI,., . ._Ii /1 I 5-