Loading...
1995, 03-06 Permit App 95001054 Site PlanQualify STEEL BUILDINGS, INC. JOB .'NAME 3, .�1ti.,,o PHONE # GrZZ -13o3s ADDRESS • 9 312 3 i'a.-.4ze�� LEGAL /DESCRIPTION "4-2/ �`J l%Z • I Z/ SITE PLAN Show NORTH ZONING CRITERIA - SPOKANE City If closer than 3' to property line - need firewall Out of rear 30' and closer than 5' - need waiver from neighbor Can't cover more than 50% of rear 25' Corner lot - building must be 20' from side property line 60' minimum setback from front property line Less -than 6' from residence - need firewall • COUNTY Maximum lot coverage Inc. septic system - 35% 5'.minimum s.ide yard setback (unless 70' or more back - then 3' minimu;n) If closer than 3' to property line - need firewall Minimum front setback - 25' from property line or 55' from center road: (whichever is greater) Minimum sidestreet setback - 15' from property line or 45' from ceantcr of road (whichever is greater) 16' and over to ridge in height may change setback requirements 10' from septic/drainfield Less than 6' from residence - need firewall N 78 to CLntkr Suite Sp,iLani•. WaShtntton 99'_'J7 Offkc (509) 468.1006 FAX (5 )9) 468- 3 I o CON rHAC rf�H IiCF•rE +QuA:ISd:.dtC7 (75,