1995, 03-06 Permit App 95001054 Site PlanQualify
STEEL BUILDINGS, INC.
JOB .'NAME 3, .�1ti.,,o
PHONE # GrZZ -13o3s
ADDRESS • 9 312 3 i'a.-.4ze��
LEGAL /DESCRIPTION
"4-2/ �`J l%Z • I Z/
SITE PLAN
Show
NORTH
ZONING CRITERIA - SPOKANE
City
If closer than 3' to property line - need firewall
Out of rear 30' and closer than 5' - need waiver from neighbor
Can't cover more than 50% of rear 25'
Corner lot - building must be 20' from side property line
60' minimum setback from front property line
Less -than 6' from residence - need firewall
•
COUNTY
Maximum lot coverage Inc. septic system - 35%
5'.minimum s.ide yard setback (unless 70' or more back - then 3' minimu;n)
If closer than 3' to property line - need firewall
Minimum front setback - 25' from property line or 55' from center road:
(whichever is greater)
Minimum sidestreet setback - 15' from property line or 45' from ceantcr of
road (whichever is greater)
16' and over to ridge in height may change setback requirements
10' from septic/drainfield
Less than 6' from residence - need firewall
N 78 to
CLntkr Suite
Sp,iLani•. WaShtntton 99'_'J7
Offkc (509) 468.1006
FAX (5 )9) 468- 3 I o
CON rHAC rf�H IiCF•rE +QuA:ISd:.dtC7
(75,