2006, 06-13 Permit 06002286 Bldg Plan•
41.
)
CONCRETE TO COMPLY TO IRC TABLE 404.1.1 1)
FOUNDATION WALLS - 3000 # PSI
SLABS, GARAGES, CARPORTS
& PORCHES - 3500 # PSI
ALL FOOTINGS MUST BE CONTINUOUS
Under Floor Ventilation
1 Sq Ft per every 150 Sq Ft of under
floor space area. 1 ventilating opening shall
be within 3 feet of each comer. Openings
shall be covered with approved material.
Under floor accessible
.by18"x24"
Under floor
Clearance 18"
Radon Mitigation System Required
If Vents Subject to Closure
6 mil Vapor Barrier Required
•
(.1
2 — t' 319 t.� d
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
REVIEWED FOR ;ODE COMPLIANCE
SPOKANE VALLEY B- 4LDIN DIVISION
T t3 Jot.
i
A)
AAAt/1 /4vwse
s.
N FP 0 patt-it-il—r--otz. %,./.! 0 !-(2it -LA � flD01Sh/,
fAv-t-Ry A tc P N Poo F oar AKA.(u /40)11,4,
5 gy 5.P bF3cA:IL9(KGs
±0-11 2-,u'lt. 5 (� b 3 2
7
PLANNING DEPT. APPROVED
DATE: (ii lc;
Lv(L-L,1- LIA 912PE- (VlS-'
Cke 2 e 5, 1vA- 9 jd(6