2006, 06-29 Permit App 06002546 Set MHProject Number: 06002546 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Date: 6/29/2006 Page 1 of 2
Permit Use: SET NEW MANUFACTURED HOME, SKYLINE
ON SEWER
Setbacks: Front
Site Information:
Plat Key:
Left: Right: Rear:
Contact: RICHARD MASON
Address: 15918 E CAMERON CT
C - S - Z: VERADALE, WA 99037
Phone: (509) 953-3923
Group Name:
Project Name:
Name: MISSION MEADOWS MHP MFG HOME PK 123 UNITS
District: East
Parcel Number: 55083.9601
Block:
SiteAddress: 19411 E COLYAR LN
Location:: CSV
Zoning: UR-7 Urban Residential-7
Water District:
Lot:
Owner: Name: HOMES, CLAYTON
Address: 15906 E SPRAGUE AVE
SPOKANE VALLEY, WA 99037
Hold: ❑
Area: 0 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: -
Review
Driveway/Approach
Released By:
Landuse/Zoning/HE Conditions
Released By: _
Sewer Review
Permits:
Released By:
Contractor: NORTHWEST MFG HOME
Address: PO BOX 3503
HAYDEN, ID 83835
Item Description
INSPECTION FEE
Manufactured Home
Firm: NORTHWEST MFG HOME SERVI
Phone: (208) 772-8469
Units Unit Desc
2 # SECTIONS
Fee Amount
$100.00
Permit Total Fees: $100.00
Operator: AMB Printed By: AMB Print Date: 6/29/2006
Project Number: 06002546 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
ALL PERMIT APPLICATIONS IN MISSION MEADOWS MHP MUST HAVE PLANNING
DIVISION REVIEW BY MICKI HARNOIS OR GREG MCCORRMICK
Permit Type
Manufactured Home
Fee Amount Invoice Amount Amount Paid Amount Owinc
$100.00 $100.00
$0.00 $100.00
$100.00 $100.00 $0.00 $100.00
Date: 6/29/2006 Page 2 of 2
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: AMB Printed By: AMB Print Date: 6/29/2006
Permit Center
*Oka'
to11707 11707 nE S r sue A L
0t LE Vn
.00,01;Va11e (S50o)68eV-0all
03e6y,FWr99)688-0070
Community Development www.spokanevalley.�drg JUN 28
Manufactured Home[3. 4-U
Permit Application OTHER
PERMIT NUMBER:L
PERMIT FEE:A vtO
SITE ADDRESS:
19/// 6/Qitahe
ASSESSORS PARCEL NO: 550 S3,_ o%(po/ LEGAL DESCRIPTION: /7755/oh /)%//
Building Owner:
JJ//
Name: .k,yi ry"' / ,7,ie,s
Address: / 5 1.)/6 cj„�C� ;/l /e
City:�j'nv llq,
/.•
1/��f4 tate: 4 Zip. 9g0.37
Phone:J'
ow)
v
/- 99, Fax: (7r T) eV - 9.30o
Contact Person'
erson
Name: /76y1 / So1i1
Phone: (5-66/) / 5-3 -3 2.:j
Contractor-
Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Contractor Lic No:
-fZl�
Exp Date:
-
/!a
27
City Business Lic. No:
No ✓1 h AI N-CL
A' 6Z
Describe the scope of work in detail: 5�7/ ffr�� �/i /j�ej , %
MANUFACTURED HOME
Width:
Length: .5to /
Year: ZGo&,
Pit Set: yes
Sewer:
Manufacture: s'l
Previous Address:
Proposed Use:
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
Method of Payment
0 Cash
Bankcard #:
Authorized Signature:
REVISED 8/23/2005
❑ Check
❑ Mastercard
Expires:
Date o/20/
❑ VISA
VIN#:
3
•ti
pm:
TRACT
Q)
f
Csucs-f'
f etyk_itei
1
N.
64
61
R7 ltrQ
. • 1 f
2'tesff
1/' „ or
teN c
' • will I flcL4UINtmENTS (font
Pier
Spacing
Under
Main
I -Beams
(Ft.)
v
6
v
8
9
10
WI. Per Foot
See Note S
NOTES:
20' WIDE HOMES
Pier Load
(Lbs)
20 PSF
Roof
Zone
1810
2270
2720
3170
3630
4080
4540
lial
Pier Load
(Lbs)
30 PSF
Roof
Zone
2060
2580
3100
3610
4130
4640
5160
TABLE 2
PIER LOADING UNDER MAIN I -BEAMS
DOUBLE -WIDE HOMES
Pier Load
(Lbs)
40 PSF
Roof
Zone
2170
2710
3260
3800
4340
4880
5420
24' WIDE HOMES
Pier Load
(Lbs)
20 PSF
Roof
Zone
2100
2630
3150
3680
4200
4730
5250
Pier Load
(Lbs)
30 PSF
Roof
Zone
2390
2980
3580
4180
4770
5370
5970
Pier Load
(Lbs)
40 PSF
Roof
Zone
2560
3190
3830
4470
5110
5750
6380
Ilia
26' & 28' WIDE HOMES
Pier Load
(Lbs)
20 PSF
Roof
Zone
2360
2950
3540
4130
4720
5310
5900
590
Pier Load
(Lbs)
30 PSF
Roof
Zone
2630
3350
4020
4690
5360
6030
6700
670
Pier Load
(Lbs)
40 PSF
Roof
Zone
2940
3670
4410
5140
5880
6610
7340
734
32'
Pier Lc
(Lbs
20 PS
Roof
Zone
2680
3350
4020
4690
5360
II
6700
6700
670
1. See Table 4 for minimum footing sizes based on pier loads and allowable soil bearing capacities. The foc
loads are minimum required for the applicable conditions. The footing shall not be smaller than the pier it
square inches.
2. The maximum spacing of supports is not to exceed 10 feet.
3. Where it is impractical to maintain spacing, such as in the axle area, the average of the distance to each
may be used to determine support requirements. For example: if the distances to the adjacent supports W
the average spacing would be 7'-0".
I 6'-0"
3. I 8' 0"
Pier A
Pier B
The average spacing for pier B would be (6 + 8) / 2 = 7 ft.,
4. Concentrated Toads at marriage line (see Table 3).
5. The last line in the above Table is the weight per foot each
is carrying to determine the required capacity of that pier.
14
Pier C
therefore, pier B would be designed for 7 ft. pier:
main I-beam is carrying. Multiply this number by
b I ANDARD TIE -DOWN DETAILS
•••O`PEV TtC�G,,•.,,, z
• `�
,.. ,�ip�STpR� 9G . H TABLE 6
7f `_ "•••��1�w oW F
: a
i * ( 19600312 e m LU
= K� 34.0, wx
. "J. . STATE OF h i
w
SEE NOTE u1
STRAP ANGLE STRAP ANGL
ANCHOR TO BE RATED FOR 36841 OF WORKING STRESS, TOTAL BOTH
STRAPS. '
(INSTALLED PER ANCHOR MANUFACTURER'S INSTRUCTIONS SEE NOTE 3)
SINGLE -WIDE
F
STRAP ANGLE
INSTALL Sl
6'-8
5,-4„
4'-0"
FOR E
SING
SEE TABLE F
STRAP AN(
STRAP ANGLE
ANCHOR TO BE RATED FOR 3684# OF WORKING STRESS, TOTAL FOR BOTH
STRAPS.
(INSTALLED PER ANCHOR MANUFACTURER'S INSTRUCTIONS SEE NOTE 3)
DOURD LE -WIDE
USE 24'WIDE RESULTS FOR 12' HALF OF 22' WIDE DOUBLE WIDES
SEE N
WIND ZONE 11
WIDTH MIN. & MAX. WIND ZOI
ELEVATION MIN. & MAX. MIN. & MAX.
12 14"TO IO DIAGONAL STRAP ANGLE ELEVATION DIA
14 14' TO 25" 25° TO 40° 14" TO 26"
12' SHED ROOF 25.2"T720.5TO 40°
14'SHED ROOF 23.4"TO 38.4" 41°TO 50° 25.2"TO 38.4"
16 16" TO 36" 36° TO 50° 23.4" TO 38.4"
18' 16 TO 36" 20.5° TO 40° 15.5"TO 38"
20' OR 22' • 20' 12"TO 15" 20.5° TO 40° 19" TO 47"
24' 12" TO 15" 34° TO 40° 12" TO 16"
28 24.5° TO 40° 12"TO 23.5"
32' 12" TO 23.5" 23° TO 40°
16'SHED ROOF 12"TO33" 16.6°TO39.3° 12"TO25.5"
21"TO27.5" 25.9°TO32.4°. 211 TO275"
NOTES:
1) FOR STRAP MATERIAL SPECIFICATION, CONNECTION TO FRAME I -BEAM & OTHER SETUP INFORMATION. REFER TO SF('MAN
MANUAL
2) FOR ANCHORING SYSTEMS, THE INSTRUCTIONS SHALL INDICATE A) THE MINIMUM ANCHOR CAPACITY REQUIRED; B)
CERTIFIED BY PROFESSIONAL ENGINEER, ARCHITECT OR A NATIONALLY RECOGNIZED TESTING LABORATORY AS TO 1
BASED ON THE MAXIMUM ANGLE OF DIAGONAL TIE AND/OR VERTICAL TIE LOADING AND ANGLE OF ANCHOR INSTALL,;
IN WHICH THE ANCHOR IS TO BE INSTALLED; C) GROUND ANCHORS SHOULD BE EMBEDDED BELOW THE FROST LINE F
INCHES ABOVE THE WATER TABLE; D) GROUND ANCHORS SHOULD BE INSTALLED TO THEIR FULL DEPTH, AND STABILIi
BE INSTALLED TO PROVIDE ADDED RESISTANCE TO OVERTURNING OR SLIDING FORCES; E) ANCHORING EQUIPMENT
BY A PROFESSIONAL ENGINEER OR ARCHITECT TO RESIST THESE SPECIFIED FORCES IN ACCORDANCE WITH TESTING
STANDARD SPECIFICATION FOR STRAPPING, FLAT STEEL AND SEALS.
3) ANCHORS RATED 0 3150# OF WORKING STRESS TOTAL FOR BOTH STRAPS, MAY BE USED IF STRAP & ANCHOR SPACIN
@ WIND ZONE II AND 4'-6" 0 WIND ZONE III, STRAPS AND ANCHORS MAY BE INSTALLED 4'-0" O.C. ON SHED ROOF SINGI
ANCHORS RATED 0 3150#.
4) TCENTERLINE STRAPS HE A-B CHANCE STRAP SEAL DEVICE DEPICTED BY FIG. 5-12 MAY BE USED AS DIRECTED FOR ATTACHING THE REQUIE
5) STANDARD TIE DOWN DETAILSO ANCHORS.OUND
ARE NOT APPLICABLE TO 5/12 ROOF PITCH DOUBLEWIDES 0 WIND ZONE II & III.
30
SKYI
fUNDATION AND SUPPORT REQUIREMENTS (Continued)
TABLE 3
PIER LOADING UNDER CENTERLINE BEAMS
vvvtvi.a.- v v it/
G nv1VIG0
Span
Between
Columns
(Ft.)
See notes
20' WIDE
HOMES
24' WIDE HOMES
26' & 28' WIDE HOMES
32' WIDE (-
Pier Load
(Lbs)
20 PSF
Roof
Zone
Pier Load
(Lbs)
30 PSF
Roof
Zone
Pier Load
(Lbs)
40 PSF
Roof
Zone
Pier Load
(Lbs)
20 PSF
Roof
Zone
Pier Load
(Lbs)
30 PSF
Roof
Zone
Pier Load
Pier Load
(Lbs)
20 PSF
Roof
Zone
Pier Load
(Lbs)
30 PSF
Roof
Zone
Pier Load
Pier Load
(Lbs)
20 PSF
Roof
Zone
Pier Lo
(Lbs
30 PS
Root
ZonE
(Lbs)
40 PSF
Roof
Zone
(Lbs)
40 PSF
Roof
Zone
6
900
1200
1500
1080
1440
1800
1260
1680
2100
1350
180Q
3000
10
1500
2000
2500
1800
2400
3000
2100
2800
3500
2250
12
1800
2400
3000
2160
2880
3600
2520
3360
4200
2700
3600
14
2100
2800
3500
2520
3360
4320
2940
3920
4900
3150
4200
16
2400
3200
4000
2880
3840
4800
3360
4480
5600
3600
4800
18
2700
3600
4500
3240
4320
5400
3780
5040
6300
4050
5400
20
3000
4000
5000
3600
4800
6000
4200
5600
7000
4500
6000
24
3600
4800
6000
4320
5760
7200
5040
6720
8400
5400
7200
1) Where a column is located between two openings, sum the loads for each opening to obtain the required pier load.
2) See table 4 for minimum footing sizes based on pier loads and allowable soil bearing capacities.
3) The concentrated load consist of roof load only.
4) Pier locations at the marriage wall are marked with paint or metal indicator straps.
5) Piers used side by side to obtain the required load are permissible.
PIER LOADING AND INSTALLATION UNDER SIDEWALL DOORS AND WINE
Floor joists
4x4 bock, 4" longer
than joist spacing.
Installed such that it
Spans joists on either
side of door jamb.
.Unit sidewall
Typical door or window
opening -Width varies
- see table below.
Typical Pier
Pier installed when
joist s not nder
door jamb.
Pler i stalled when
jol t is u der
doorjamb.
See note 6: •
Unit sidewall
SECT10N A -A'
Floor joists
Typical Pier
48"
OPENING
78.5" MAX. OPENING
v
108" MAX. OPENING
121" MAX. 0
Nominal
Unit
Width
(Ft.)
Pier Load
(Lbs)
20 PSF
Roof
Zone
Pier Load
(Lbs)
30 PSF
Roof
Zone
Pier Load
(Lbs)
40 PSF
Roof
Zone
Pier Load
(Lbs)
20 PSF
Roof
Zone
Pier Load
(Lbs)
30 PSF
Roof
Zone
Pier Load
(Lbs)
40 PSF
Roof
Zone
Pier Load
(Lbs)
20 PSF
Roof
Zone
Pier Load
(Lbs)
30 PSF
Roof
Zone
Pier Load
(Lbs)
40 PSF
Roof
Zone
Pier Load
(Lbs)
20 PSF
Roof
Zone
Pier Loa
(Lbs)
30 PSF
Roof
Zone
12
500
640
790
810
1050
1280
1110
1440
1760
1250
1610
14
550
710
870
890
1160
1430
1230
1600
1960
1370
1780
16
600
780
960
980
1270
1570
1340
1750
2260
1500
1960
18
650
840
1040
1050
1380
1700
1450
1890
2340
1620
2120
20
440
570
690
720
920
1130
990
1270
1550
1100
1420
24
500
640
790
810
1050
1280
1110
1440
1760
1250
1610
26
520
680
830
860
1110
1360
1180
1520
1870
1320
1710
28
540
700
860
880
1140
1400
1210
1570
1930
1350
1750
32
590
760
940
950
1240
1530
1310
1710
2110
1470
1910
1) Piers are required at all entry doors and window openings greater than four feet.
2) Piers are also required at bay windows where the sidewall opening is greater than four feet.
3) Piers are not required at door and window openings located along endwalls.
4) Piers are not required at some door and window locations if the floor has been reinforced at the factory. Contact the division that built your
determine if this is applicable to your home.
5) See table 4 for minimum footing sizes based on pier loads and allowable soil bearing capacities.
6) Maximum pier setback is 6". If pier load (from table 3A) is 1240 lbs. or less, and nominal unit width is 12', 14', 20', 24', 26', or 28', then sett
max. If pier load (from table 3A) is 1930 lbs. or less, and nominal unit width is 16', 18', or 32', then setback may be 10" max.
�„
7) For piers between multiple ooeninns rn c. thlne.1u fn. ..-.,-k ._ _-..,_ .. . ..