2012, 04-20 Permit SW1200168 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001168 04/20/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: `COURCHAINE CONSTRUCTION
Applicant: 'COURCHAINE CONSTRUCTION
Permit Type: SEWER Address: 19818 E SPRAGUE AVE
GREENACRES, WA 99016
Phone: 509-924-5485
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
4042 S CONIFER CRT
45324.0123
PONDEROSA ADDITION
Assessor's Description: PONDEROSA ADDITION L23 B1
Inspection Area:
Zoning:
General Contractor
COURCC'181 R7
'COURCHAINE CONSTRUCTION
19818 E SPRAGUE AVE
GREENACRES, WA 99016
509-924-5485
DETAILS:
Owner: HEATON, MICHAEL R & JILL C
Address: 4042 S CONIFER CRT
SPOKANE, WA 99206-9664
Phone:
Email:
Water District: Spokane Fire District: Fire District 1
County Water District #3
Land Area: 0.4 acres / 17424 sgft
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Inside Public Transit Benefit Area
$25.94
$125.00
Total Fee: $150.94
--------------------------------------------------
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 04/20/2012 09:21:30 Printed by: IIS APPPOOLIASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001168 04/20/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DfwINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
----------------------------------------------------
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
—
-----—-----------------------------—--------------
—
THEINSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/20/2012 09:21:30 Printed by: IIS APPPOOLVASP.NET v4.0