Loading...
2008, 04-07 Permit App 08001084 Pole BldgSpokane .0•0Valley- Community Development Residential Construction Permit Application Permit Center 11703 E Sp- Sze Ave, Suite B-3 Spokane Va y, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spoka-nevalley.org I PERMIT NUMBER: G /oJ'`f PERMIT FEE: New Construction Accessory Bldg Addition/Remodel n Deck Other: SITE ADDRESS: [_ j0(a 1 r r%)0-J1P\ CA ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: Address: (3O & 4 „ (16. wt.. Lh City-k/.y10 �J0 (( State:( Zip9 0// Phone: a l Z ef, 70 r Fax: Contact Person Name: DO ►1 c9--�E' Phone: c g tl .� q Describe the scope of work in detail: Contractor: Name: 0 ri l e N l f+ aL —Or Address: LI I (06 e- f (� aer 4 I) -Or . (1. City: ( Cloe State: Zip: c Phone: r'l� �a °� i Fax: 7 43 L/q Cf / Contract N : xp Date: _ 14i 1� s c iu(k 8, v e , City Business Lic. No: e � So S,� �v Pete. < <<( ,' /15 Proposed Use: S I o S l r e Cost of Project: $ �1.®.ce **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: ` , i ( DIMENSIONS: 0x O f # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 15 Oa 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: G,.ARAGE SQ. FTG: '' o K DECK/COV. PATIO SQ. F1'G: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can beprocessed. C ,J SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 0 Check DATE: 3 -z7 -06 ❑ Mastercard ❑ VISA Expires: VIN#: Spokane 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 • Valley® Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. Show the height of any proposed buildings or accessory structures. Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. Floor framing details: Joist type, size, spacing and installation details. Roof framing plan and details Furnace and hot water heater location All header locations: type, size and connections Foundation plan Insulation information Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One -hour separation detail: between house and garage BUILDING PERMIT APPLICATION WORKSHEET City of Spokane Valley Community Development Department Building Division 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Phone: (509) 688-0036; Fax: (509) 688-0037 REQUIRED SITE INFORMATION Street Address: 1.1 0 ' 11.0 r Cm Assessor's Tax Parcel Number(s): Legal Description: PERMIT DESCRIPTION: Building Permit n Change in Use I Relocation Tenant Improvement Grading Fire Safety 'Dodd 'IR Manufactured Home Other OWNER/APPLICANT INFORMATION Owner: ,[ C ) obi Phone: 97 7 t``s`e` 7o Fax: Address: r O (o r CiState Contractor: V A l I e Phone: c/6 jj( Fax: S°C) et ?Z S 7-0L=(C( Address. �(y cv e - Al Qc�.r_ r t X f)x- , wTheI,(k-'iA- City 1 State 0 Zip Code 741 Zip Code I1 Applicant: Phone: Fax: Address: City Architect: 2Ke Phone: 1-1443 (dIere Fax:g-(Co5" Address: 29t3 z.GIF Cnu - � crre Gig Zz_2 State Zip Code Cty WA State Contractor License #: VAu_ c (O( GCS Contact: State Zip Code PERMIT/BUILDING INFORMATION HEIGHT TO PEAK: s DIMENSIONS: fro * 1f # OF STORIES: MAIN FLOOR TO SQ. FTG: ( SOO y"". FLOOR SQ. FTG: -UNFIN BASEMENT SQ. FTG: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: OCCUPANCY GROUP: CONSTRUCTION TYPE: 1 HEAT SOURCE: r. I # OF BEDROOMS: TOTAL HABITABLE SPACE: IMPERVIOUS SURFACE AREA: COST OF PROJECT: Zot(f 30% SLOPES ON PROPERTY: C SEWER OR ON?SITE SEPTIC SYSTEM? i MANUFACTURED HOME Width: Manufacturer: Length: Year: Pit Set: RELOCATION Previous Address: Proposed Use: FIRE SAFETY Fire Sprinkler: Tent: # of Heads: Fire Alarm: Paint Booth: Fireworks Display: Blasting: Date/Time: Valuation: Above/Underground Storage Tank Size: WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE Plans Examiner: Address: Phone: Fax: City Inspector: Phone: Address: State Fax: Zip City State Zip SPECIAL INSPECTIONS J ❑ BOLTING Firm Name: CONCRETE REINFORCEMENT Phone: Inspector(s): Fax: Li WELDING DISCLAIMER The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the_dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner.' 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. Ownership of resulting development rights granted by any issued permit inure to the property owner. Print Name Signature Method of Payment: (Faxed permit applications will only be accepted with major bankcard) ❑ Cash ❑ Check ❑ Mastercard ❑ VISA ❑ Other Bankcard #: Expires: VIN#: Authorized Signature: Spokane Valley® For City Use Only PLUS Project Number C)c-KC `-' Project Address r 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. t z Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proiect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE —APPLICANT PINK— BUILDING FILE REV 9/07 (r 6„ L. ti£a,63' (07 1. �o A) C R L S -5� 5 415' r PLANNING DEPT. APPROVED { BY. DATE' & 3, / o,