Loading...
2013, 06-04 Permit SW13000906 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000906 Project Description: SEWER CONNECTION Project Name: GREENHAVEN PH 2 Primary Contact: BLANKINSHIP, JOSHUA R & LISA A Phone: Site Address: Parcel Number: 17624 E COWLEY AVE 55183.0947 Permit Issued Date: 06/04/2013 Expiration Date: 06/04/2014 Applicant: BLANKINSHIP, JOSHUA R & LISA A Address: 17624 E COWLEY AVE GREENACRES, WA 99016 Phone: Email: Owner: BLANKINSHIP, JOSHUA R & LISA A Address: 17624 E COWLEY AVE GREENACRES, WA 99016 Phone: Assessor's Description: CORBIN ADDITION TO GREENACRES PTN LT 3 Email: BLK 18 DAF; BEG AT MOST NLY COR LT 3, TH SWLY ALG NLY LN 122FT, TH SELY PARA WITH WLY LN LT 3 TO SLY LN LT 3, TH NELY ALG SLY LT TO MOST ELY COR, TH NWLY ALG Inspection Area: :(509)-477-3675 Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: 35990 Square Feet Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Inside Public Transit Benefit Area $26.32 $125.00 Total Fee: $151.32 ------------------------------- Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. ---------------------------------------------------- SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. ---------------------------------------------------- INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. ---------------------------------------------------- SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. Date Printed: 06/04/2013 13:44:17 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000906 Permit Issued Date: 06/04/2013 Expiration Date: 06/04/2014 THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/04/2013 13:44:17 Project Coordinator: Kathy Cummings