2010, 11-04 Permit App 10003659 GarageProject Number: 10003659 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 30 X 36 X 10 POST FRAME GARAGE
Setbacks: Front Left: Right: Rear:
Site Information:
Plat Key: 005493 Name- SP-0904-93
Date: 11/4/2010 Page 1 of 2
--
Contact: SPOKANE POST FRAME
Address: 7001 E 2ND
C - S - Z: SPOKANE, WA 99212
Phone: (509) 926-0865
Group Name:
Project Name.
District: East
Parcel Number: 55073.1139 Block: Lot:
SiteAddress: 1906 N CORBIN LN
Location:: CSV
Zoning: R-3 SF Res District
Owner: Name: WARRICK, COLE & LAURIE
Address: 1906 N CORBIN LN
SPOKANE VALLEY, WA 99016
Water District: 134 CONSOLIDATED ID #19 Hold: E
Area: 23,238 Sq Ft Width: 140 Depth: 165 Right Of Way (ft): 40
Nbr of Bldgs• 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 11/4/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 11/3/2010 By: tschmidt
Permits: --- -
Operator: jmm Printed By: jmm Print Date: 11/4/2010
Project Number: 10003659 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Date: 11/4/2010 Page 2 of 2
Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME
Address: 7001 E 2ND AVE Phone: (509) 926-0865
SPOKANE, WA 99212
This Application: Total Project:
Description Grp Type Notes Su Ft Valuation Sri Ft Valuation
POLE BDLG U-1 VB PLAN 1,080 $20,520.00 1,080 $20,520.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 1,080 $20,520.00 1,080 $20,520.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$335.25
$83.81
$4.50
Permit Total Fees: $423.56
Pursuant to 19.40.020(b) All residential driveways and off street parking areas shall be paved w/
asphalt, portland cement, grasscrete or other approved hard surface material.
FLORA ESTATES -REFER TO ADE-19-06 FOR LOT WIDTH/FRONTAGE-MH
FLORA ESTATES -SEE FILE ADE-19-06 FOR LOT FRINTAGE/WIDTH-MH
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine
Building Permit $423.56 $423.56 $83.81 $339.75
$423.56 $423.56 $83.81 $339.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 11/4/2010
Permit Center-'
*lane �" —i t707 E Spiiigue A.ve, Suite 1{16
Spokane Vary, WA `99206
00 vd (509)6:$8=0036`FAX: (509)688-0037
J www.spokanevalIev.org
Community Development 3•
Residential Construe on
Permit Application`"
PERMIT NUMBER
PERMIT FEE:
New Construction [Accessory Bldg
Addition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS: c d JA icc_ l%- In0/6
ASSESSORS PARCEL NO:
5J i 3, LEGAL DESCRIPTION:
Building Owner:
Name: 1 i4f4 4 CD C c ('}- (2-a— -k
Address: t cl.nb
tr.' Cs=,,Le, a Lzw,A.
City: 5a. t�
0.4. State: (,.1 Zip:gc,LDv 4
Phone:
Fax:
Contact Person
Name: ,), VAi ni't .
Phone: 710-fig O
Describe the scope of work in detail:
Proposed Use: s7o(4-4 E - s Jt' '
Contractor:
r
Name: �::lP"% r`` T�_ 4_V3-
Address: �al 2#4./ ✓TiL1
City:5 a, k r-L Ntkil State: may`
Zip:
LL
Phone: di ZC Dy6 J - Fax: r..Z
161
Contra or` _Ij. is 2�Io � Exp Date:
.sPcb--�S'. - O�SWw
City. Business Lic. No:
Cost of Project:. $
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/S'
DIMENSIONS: ' i
30 X3 6)(t6
# OF STORIES: Cl...)
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"" FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
-
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FT :
1 O&O Cr—PROPERTY:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
# OF BEDROOMS:
CON RtX ON TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The perrnitee verifies, acknowledges and agrees by their siqhature that 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permitinure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature: -
REVISED 2/15/077
E Check
❑ Mastercard
Expires:
DATE: i 31 /
❑ VISA
VIN#:
Spokane
f� Ualley
For City Use Only
PLUS Project Number /0 �.'e 9
Project Address /c(3 la
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206.
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
i Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV9/07
/406'
co- 11-ttifs
11� U 1�c1� tom- Sfeira0'e'
�Q Ours IyluSdt. ecu2,
(014LS-4o .Uc-C apJ
ek 0 ocitlite_ Ceti_ pirctye_ 1-c=, Oe*.pc e_A(siry hc444-k.,
6COVVAR), hat .11/3(4.)-.5 czAk
buil(
t.01-11-5
(CD eth64,4
GIG` cA__.du/
I
LAAA/Li-e akt[GCL
1°1t (� 1� r�v; � IAn
se0KANE POST FRAME, INC.. . `:. -�` =' ,: tX:iviLCC•
Engineered Pole Buildings i
ROLFE WILL (O.I4I�
Sales Manager- Owner=—n��"�f�J.
shops
garages
storage buildings
cabins
kits -cost plus
7001 E 2nd Ave
Spokane. WA 99211
509-92,6-0865 • Fax 509-924-5161
or 1466-926-0865
Visit us at
www.spokanepostframe.com
• L t c g01i0
LEGAL SC# 'T 10N
PLANNING DEPT. APPRCYr
Site Plan
DATE: /1/i7/lc'
Show
Nor
Show streets/alley
Show septic/sewer/dratnfleld
Show existing buildings
Show proposed building
Show setbacks - front, rear, sides.
Show lot size
ZONING CRITERIA — SPOKANE
c;tx
i • . c loser than 5' to property line - need firewall and parapet
C,t of rear 30' and closer than 5' - need waiver from neighbor
Can't cover more than 50% of rear 25'
Corner lot - building must be 20' from property line
50' minimum setback from front property line
less than 8' from residence - need ffrewall
t ! ximum square footage - 10% of lot area (t iust be less than 3,000 3a. ft.)
.ty not subdivide lot so that building Is more than 10% of residual ' 7t area
Sauntx
If closer than 5' to property line - need flrewall
l0- from septic/dratnfleld
Less than 6' from residence - need firewall
CELg & SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE 8 )0K
AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIt'1UM BUILDING S ZE
ALSO CHANGES WITH DIFFERENT ZONING.
5 minimum side yard setback
5' minimum rear yard setback
Minimum front and side street setback - 25' from.property line or 55 from
center of road - whichever is greater •
4.
• RECEIVED
CSV PERMIT.QENTER
NOV 1 7 2010
Project�l"��—
Narne ---�/ --_—
Submitt al #P.
_ _------
SPOKANE POST FRAME, INC.
Engineered Pole Buildings
shops
gaga
storage buildings
cabins
kits -cost plus
7001 E. 2nd Ave
Spokane. WA 99212-
ROLFE WILL
Sales Manager - Owner
509-926-0865 • Fax 509-9245161
or 1=866-926-0865
Visit us at
www.spokanepostframe.com
Site Plan
PLANNING DEPT.APPROVED
BY.
t Iorth
Show streetsialley
Show septtcfsewer/drainfield
Show existing buildings
Show proposed building
Show setbacks - front, rear, sides.
Show lot size
•
'mot s
AppnEss
9ola�--1�1,4ef,
LEGAL O€sCt tP iot4
L SO7
Pursuant to SVMC 192140.020(b)
All residential driveways and off street parking
areas shall be paved w/asphalt, portland cement,
grasscrete, paver blocks or other equivalent hard
surface material.
ZONING CRITERIA — SPOKANE
closer than 5' to property line - need firewall and parapet
C ;t of rear 30' and closer than 5' - need waiver from neighbor
Can't cover more than 502 of rear 25'
Corner lot -, building must be 20' from property line
50' minimum setback from front property line
t ess than 8' from residence - need f lrewail
ii)xlmum square footage - 102 of lot area (Must be Tess than 3,000 so. ft.)
r .,y not subdivide lot so that building Is more than 102 of residual area
t,.ounty •
If closer than 5' to property line - need flrewalI
ID' from septic/dralnfleld
Less than 6' from residence - need flrewalt
QFNERAI SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE B)0K
AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING S ZE
ALSO CHANGES WITH DIFFERENT ZONING.
5 minimum side yard setback
5 minimum rear yard setback
Minimum front and side street setback - 25' from.prgperty line or 55 from
center of road - whichever is greater
csg-
T--