Loading...
2010, 11-04 Permit App 10003659 GarageProject Number: 10003659 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 30 X 36 X 10 POST FRAME GARAGE Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 005493 Name- SP-0904-93 Date: 11/4/2010 Page 1 of 2 -- Contact: SPOKANE POST FRAME Address: 7001 E 2ND C - S - Z: SPOKANE, WA 99212 Phone: (509) 926-0865 Group Name: Project Name. District: East Parcel Number: 55073.1139 Block: Lot: SiteAddress: 1906 N CORBIN LN Location:: CSV Zoning: R-3 SF Res District Owner: Name: WARRICK, COLE & LAURIE Address: 1906 N CORBIN LN SPOKANE VALLEY, WA 99016 Water District: 134 CONSOLIDATED ID #19 Hold: E Area: 23,238 Sq Ft Width: 140 Depth: 165 Right Of Way (ft): 40 Nbr of Bldgs• 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 11/4/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 11/3/2010 By: tschmidt Permits: --- - Operator: jmm Printed By: jmm Print Date: 11/4/2010 Project Number: 10003659 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Date: 11/4/2010 Page 2 of 2 Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME Address: 7001 E 2ND AVE Phone: (509) 926-0865 SPOKANE, WA 99212 This Application: Total Project: Description Grp Type Notes Su Ft Valuation Sri Ft Valuation POLE BDLG U-1 VB PLAN 1,080 $20,520.00 1,080 $20,520.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 1,080 $20,520.00 1,080 $20,520.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $335.25 $83.81 $4.50 Permit Total Fees: $423.56 Pursuant to 19.40.020(b) All residential driveways and off street parking areas shall be paved w/ asphalt, portland cement, grasscrete or other approved hard surface material. FLORA ESTATES -REFER TO ADE-19-06 FOR LOT WIDTH/FRONTAGE-MH FLORA ESTATES -SEE FILE ADE-19-06 FOR LOT FRINTAGE/WIDTH-MH Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine Building Permit $423.56 $423.56 $83.81 $339.75 $423.56 $423.56 $83.81 $339.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 11/4/2010 Permit Center-' *lane �" —i t707 E Spiiigue A.ve, Suite 1{16 Spokane Vary, WA `99206 00 vd (509)6:$8=0036`FAX: (509)688-0037 J www.spokanevalIev.org Community Development 3• Residential Construe on Permit Application`" PERMIT NUMBER PERMIT FEE: New Construction [Accessory Bldg Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: c d JA icc_ l%- In0/6 ASSESSORS PARCEL NO: 5J i 3, LEGAL DESCRIPTION: Building Owner: Name: 1 i4f4 4 CD C c ('}- (2-a— -k Address: t cl.nb tr.' Cs=,,Le, a Lzw,A. City: 5a. t� 0.4. State: (,.1 Zip:gc,LDv 4 Phone: Fax: Contact Person Name: ,), VAi ni't . Phone: 710-fig O Describe the scope of work in detail: Proposed Use: s7o(4-4 E - s Jt' ' Contractor: r Name: �::lP"% r`` T�_ 4_V3- Address: �al 2#4./ ✓TiL1 City:5 a, k r-L Ntkil State: may` Zip: LL Phone: di ZC Dy6 J - Fax: r..Z 161 Contra or` _Ij. is 2�Io � Exp Date: .sPcb--�S'. - O�SWw City. Business Lic. No: Cost of Project:. $ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: /S' DIMENSIONS: ' i 30 X3 6)(t6 # OF STORIES: Cl...) TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: - IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FT : 1 O&O Cr—PROPERTY: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON # OF BEDROOMS: CON RtX ON TYPE: HEAT SOURCE: SEWER OR SEPTIC? The perrnitee verifies, acknowledges and agrees by their siqhature that 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permitinure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: - REVISED 2/15/077 E Check ❑ Mastercard Expires: DATE: i 31 / ❑ VISA VIN#: Spokane f� Ualley For City Use Only PLUS Project Number /0 �.'e 9 Project Address /c(3 la 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206. 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. i Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV9/07 /406' co- 11-ttifs 11� U 1�c1� tom- Sfeira0'e' �Q Ours IyluSdt. ecu2, (014LS-4o .Uc-C apJ ek 0 ocitlite_ Ceti_ pirctye_ 1-c=, Oe*.pc e_A(siry hc444-k., 6COVVAR), hat .11/3(4.)-.5 czAk buil( t.01-11-5 (CD eth64,4 GIG` cA__.du/ I LAAA/Li-e akt[GCL 1°1t (� 1� r�v; � IAn se0KANE POST FRAME, INC.. . `:. -�` =' ,: tX:iviLCC• Engineered Pole Buildings i ROLFE WILL (O.I4I� Sales Manager- Owner=—n��"�f�J. shops garages storage buildings cabins kits -cost plus 7001 E 2nd Ave Spokane. WA 99211 509-92,6-0865 • Fax 509-924-5161 or 1466-926-0865 Visit us at www.spokanepostframe.com • L t c g01i0 LEGAL SC# 'T 10N PLANNING DEPT. APPRCYr Site Plan DATE: /1/i7/lc' Show Nor Show streets/alley Show septic/sewer/dratnfleld Show existing buildings Show proposed building Show setbacks - front, rear, sides. Show lot size ZONING CRITERIA — SPOKANE c;tx i • . c loser than 5' to property line - need firewall and parapet C,t of rear 30' and closer than 5' - need waiver from neighbor Can't cover more than 50% of rear 25' Corner lot - building must be 20' from property line 50' minimum setback from front property line less than 8' from residence - need ffrewall t ! ximum square footage - 10% of lot area (t iust be less than 3,000 3a. ft.) .ty not subdivide lot so that building Is more than 10% of residual ' 7t area Sauntx If closer than 5' to property line - need flrewall l0- from septic/dratnfleld Less than 6' from residence - need firewall CELg & SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE 8 )0K AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIt'1UM BUILDING S ZE ALSO CHANGES WITH DIFFERENT ZONING. 5 minimum side yard setback 5' minimum rear yard setback Minimum front and side street setback - 25' from.property line or 55 from center of road - whichever is greater • 4. • RECEIVED CSV PERMIT.QENTER NOV 1 7 2010 Project�l"��— Narne ---�/ --_— Submitt al #P. _ _------ SPOKANE POST FRAME, INC. Engineered Pole Buildings shops gaga storage buildings cabins kits -cost plus 7001 E. 2nd Ave Spokane. WA 99212- ROLFE WILL Sales Manager - Owner 509-926-0865 • Fax 509-9245161 or 1=866-926-0865 Visit us at www.spokanepostframe.com Site Plan PLANNING DEPT.APPROVED BY. t Iorth Show streetsialley Show septtcfsewer/drainfield Show existing buildings Show proposed building Show setbacks - front, rear, sides. Show lot size • 'mot s AppnEss 9ola�--1�1,4ef, LEGAL O€sCt tP iot4 L SO7 Pursuant to SVMC 192140.020(b) All residential driveways and off street parking areas shall be paved w/asphalt, portland cement, grasscrete, paver blocks or other equivalent hard surface material. ZONING CRITERIA — SPOKANE closer than 5' to property line - need firewall and parapet C ;t of rear 30' and closer than 5' - need waiver from neighbor Can't cover more than 502 of rear 25' Corner lot -, building must be 20' from property line 50' minimum setback from front property line t ess than 8' from residence - need f lrewail ii)xlmum square footage - 102 of lot area (Must be Tess than 3,000 so. ft.) r .,y not subdivide lot so that building Is more than 102 of residual area t,.ounty • If closer than 5' to property line - need flrewalI ID' from septic/dralnfleld Less than 6' from residence - need flrewalt QFNERAI SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE B)0K AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING S ZE ALSO CHANGES WITH DIFFERENT ZONING. 5 minimum side yard setback 5 minimum rear yard setback Minimum front and side street setback - 25' from.prgperty line or 55 from center of road - whichever is greater csg- T--