Loading...
2012, 05-23 Permit SW-12001412 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT ` Permit Issued Date: Application Number: SW -12001412 05/23/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: ERVIN, DESIREE T & ERIC T Project Name: GREEN HAVEN PHASE 2 Applicant: ERVIN, DESIREE T & ERIC T Permit Type: SEWER Address: 17711 E COWLEY AVE N LN OF COWLEY AVE TH N ALG NLY LN OF SD GREENACRES, WA 99016 Inspection Area: Phone: Email: SITE INFORMATION: Site Address: 17711 E COWLEY AVE Parcel Number: 55183.0651 Subdivision: CORBIN ADDITION Assessor's Description: CORBIN ADD TO GREENACRES PTN OF LT 15 BILK 17 DAF; BEG AT NW COR TH E165.10' TH S308.90' TO TRUE POB TH W80' TH S162.26' TO N LN OF COWLEY AVE TH N ALG NLY LN OF SD AVE 83.99' TO A PT 165.10'E OF W LN Inspection Area: Water District: Consolidated Irrigation District #19 Zoning: Owner Acting As Builder OWNER OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 DETAILS: Owner: ERVIN, DESIREE T & ERIC T Address: 17711 E COWLEY AVE GREENACRES, WA 99016 Phone: Email: Fire District: Fire District 1 Land Area: 0.2736 acres / 11920 sqft Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. ---------------------------------------------------- Date Printed: 05/23/2012 15:17:47 Printed by: IIS APPPOOLIASP.NET V4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001412 05/23/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 6:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. ----------------------------------------------- INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO TWE— EWER—AN D MAYBE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWERSTUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. ---------------------------------------------------- THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/23/2012 15:17:47 Printed by: IIS APPPOOLWSP.NET v4.0