2012, 05-23 Permit SW-12001412 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
` Permit Issued Date:
Application Number: SW -12001412 05/23/2012
Expiration Date:
Project Description: SEWER CONNECTION
Primary Contact:
ERVIN, DESIREE T & ERIC T
Project Name: GREEN HAVEN PHASE 2
Applicant:
ERVIN, DESIREE T & ERIC T
Permit Type: SEWER
Address:
17711 E COWLEY AVE
N LN OF COWLEY AVE TH N ALG NLY LN OF SD
GREENACRES, WA 99016
Inspection Area:
Phone:
Email:
SITE INFORMATION:
Site Address: 17711 E COWLEY AVE
Parcel Number: 55183.0651
Subdivision:
CORBIN ADDITION
Assessor's Description:
CORBIN ADD TO GREENACRES PTN OF LT 15
BILK 17 DAF; BEG AT NW COR TH E165.10' TH
S308.90' TO TRUE POB TH W80' TH S162.26' TO
N LN OF COWLEY AVE TH N ALG NLY LN OF SD
AVE 83.99' TO A PT 165.10'E OF W LN
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning:
Owner Acting As Builder
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN, UK 00000
DETAILS:
Owner: ERVIN, DESIREE T & ERIC T
Address: 17711 E COWLEY AVE
GREENACRES, WA 99016
Phone:
Email:
Fire District: Fire District 1
Land Area: 0.2736 acres / 11920 sqft
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
----------------------------------------------------
Date Printed: 05/23/2012 15:17:47 Printed by: IIS APPPOOLIASP.NET V4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001412 05/23/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 6:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
-----------------------------------------------
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO TWE— EWER—AN D MAYBE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWERSTUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
----------------------------------------------------
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/23/2012 15:17:47 Printed by: IIS APPPOOLWSP.NET v4.0