Loading...
2013, 03-20 Permit SW-13000258 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000258 Permit Issued Date: 03/20/2013 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION SHELLEY ACRES ADD MILLER, STEPHEN J & MICHELE A 509-879-7746 Applicant: MILLER, STEPHEN J & MICHELE A Address: Phone: Email: 1018 S COURTNEY LN SPOKANE VALLEY, WA 99037 509-879-7746 SITE INFORMATION: Site Address: 1018 S COURTNEY LN Parcel Number: 45244.1006 Assessor's Description: SHELLEY ACRES ADDITION LT6 BLK1 Inspection Area: : (509)-477-3675 Zoning: Owner: Address: Phone: Email: Water District: Vera Irrigation District #15 MILLER, STEPHEN J & MICHELE A 1018 S COURTNEY LN SPOKANE VALLEY, WA 99037 509-879-7746 Fire District: Spokane Valley Fire Land Area: 1.01 Acre(s) CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Erodible Soils within Parcel Possible Stream On Site CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 03/20/2013 12:44:54 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000258 Permit Issued Date: 03/20/2013 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/20/2013 12:44:54 Project Coordinator: Kathy Cummings