2012, 10-25 Permit SW12002442 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERPAIT
Permit issued Date:
Application Number: SW -12002442 10/25/2012
Expiration Date:
Project Description: SEWER CONNECTION
Primary Contact:
GREENBLUFF CONSTRUCTION CO
Project Name: GREEN HAVEN
Applicant:
GREENBLUFF CONSTRUCTION CO
Permit Type: SEWER
Address:
5510 E GREENBLUFF RD
908 N HOWARD ST STE 101
COLBERT, WA 99005
Phone:
509-238-6390
Email:
SITE INFORMATION:
Site Address:
17814 E COWLEY AVE
Owner:
MONK, CRAIG
Parcel Number:
55183.0901
Address:
908 N HOWARD ST STE 101
SPOKANE, WA 99201 -
Subdivision:
CORBIN ADDITION
Phone:
Assessors Description:
CORBIN ADD GRNACRS W121FT EXC N5FT L1
Email:
B18
Inspection Area:
Water District:
Fire District: Spokane Valley Fire
Consolidated Irrigation
District #19
Zoning:
CONTRACTOR INFORMATION:
General Contractor
GREENC'888JZ
GREENBLUFF CONSTRUCTION CO
5510 E GREENBLUFF RD
COLBERT, WA 99005
509-238-6390
Land Area: 35695 Square Feet
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 10125/2012 10:33:47 Printed by: IIS APPPOOLIASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002442 10/25/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/25/2012 10:33:47 Printed by: IIS APPPOOLVWSP.NET V4.0