Loading...
2012, 10-25 Permit SW12002442 SewerSPOKANE COUNTY BUILDING AND PLANNING PERPAIT Permit issued Date: Application Number: SW -12002442 10/25/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: GREENBLUFF CONSTRUCTION CO Project Name: GREEN HAVEN Applicant: GREENBLUFF CONSTRUCTION CO Permit Type: SEWER Address: 5510 E GREENBLUFF RD 908 N HOWARD ST STE 101 COLBERT, WA 99005 Phone: 509-238-6390 Email: SITE INFORMATION: Site Address: 17814 E COWLEY AVE Owner: MONK, CRAIG Parcel Number: 55183.0901 Address: 908 N HOWARD ST STE 101 SPOKANE, WA 99201 - Subdivision: CORBIN ADDITION Phone: Assessors Description: CORBIN ADD GRNACRS W121FT EXC N5FT L1 Email: B18 Inspection Area: Water District: Fire District: Spokane Valley Fire Consolidated Irrigation District #19 Zoning: CONTRACTOR INFORMATION: General Contractor GREENC'888JZ GREENBLUFF CONSTRUCTION CO 5510 E GREENBLUFF RD COLBERT, WA 99005 509-238-6390 Land Area: 35695 Square Feet Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 10125/2012 10:33:47 Printed by: IIS APPPOOLIASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002442 10/25/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/25/2012 10:33:47 Printed by: IIS APPPOOLVWSP.NET V4.0