19-035.03 Michael Terrell: Browns Park 2019 Improvements CONTRACT AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF SPOKANE VALLEY AND MICHAEL TERRELL LANDSCAPE ARCHITECTURE, PLLC Spokane Valley Contract#19-035.03 For good and valuable consideration,the legal sufficiency of which is hereby acknowledged, City and the Consultant mutually agree as follows: 1.Purpose:This Amendment is for the Contract for Browns Park 2019 Construction Improvements Project by and between the Parties, executed by the Parties on February 11, 2019, and which terminates on May 15,2020. Said contract shall be referred to as the"Original Contract"and its terms are hereby incorporated by reference. Total compensation under the Original Contract is not to exceed$59,623.50. 2.Original Contract Provisions:The Parties agree to continue to abide by those terms and conditions of the Original Contract and any amendments thereto which are not specifically modified by this Amendment. 3.Amendment Provisions: This Amendment is subject to the following amended provisions,which are as follows. All such amended provisions are hereby incorporated by reference herein and shall control over any conflicting provisions of the Original Contract,including any previous amendments thereto. -Contract Term is extended until May 31,2020. -Additional services added due to delay in contract. Please see attached. 4. Compensation Amendment History: This is Amendment #3 of the Original Contract. The history of amendments to the compensation on the Original Contract and all amendments is as follows: Date Compensation Original Contract Amount 02/22/19 $59,623.50 Amendment#1 04/25/19 $ 2,200.00 Amendment#2 12/11/19 $ 0.00 Amendment#3 03/24/20 $ 9,385.00 Total Amended Compensation $71,208.50 The parties have executed this Amendment to the Original Contract this day oft, 2020. CITY OF SPOKANE VALLEY: CONSULTANT: + _ TERRELL LANDSC. PAf't ' TURE PLLC 00fIt /zap' r Mark Calhoun By:Michael D. Terrell City Manager Its: Principal AT S . APPROVED TO FORM: gristine Bainbridge, City Clerk Offic the City orney 1 Al MEMO To:City of Spokane Parks and Recreation Attention: Mike Stone From:Mike Terrell Date:3/23/2020 Project:Browns Park Phase V Construction Project No: 14-002H Re:Additional Services Fee Request CC: File Mr. Stone, We have reviewed the level of effort and changes to the scope of services for Browns Park Phase V Construction, Construction Administration Services. Due to the failure of ERRG to adequately staff and manage the construction of this project, MTLA has been required to prepare for and attend additional meetings, site visits with the contractor to document lack of progress toward completing the project per the contract documents and scheduled Substantial Completion date of November 1, 2019. To date the project is not Substantially Complete and the contractor continues to dispute the conditions of the contract with the City of Spokane Valley. In addition to additional Construction Administration responsibilities, MTLA has had to provide additional documentation to the City of Spokane Valley and attend additional meetings with city staff as part of the continuing failure by ERRG to complete the project on time. On March 5, 2020 a meeting was held on site between the City of Spokane Valley (Mike Stone), ERRG (Ryan Boorman and Spencer Slominski), MTLA (Mike Terrell) and Senske representatives. The meeting identified a number of critical issues and tasks that remain to be completed before the project could be designated complete. ERRG indicated that it was possible that they work would not be completed until May. As of this date, the project is still not Substantially Complete and ERRG has not resumed construction per the contract documents. In order for MTLA to continue to represent the City of Spokane Valley during the contractor's completion of the project, we are requesting the following additional services fees to compensate for the additional efforts caused by the contractor's failure to perform. I request the following additional scope of work and fee to complete the project. ERRG's past performance and continuing dispute with the City of Spokane Valley make estimating the remaining construction administration fee difficult at best. Proposed Additional Services Scope of Work Represent the City of Spokane Valley during the completion of construction for the Browns Park Phase V Construction. Including: Michael Terrell ■ Landscape Architecture , PLLC 1 4 2 1 N . M e a d o w w o o d L a n e , Suite 1 5 0 0 Liberty L a k e , WA 9 9 0 1 9 ( 5 0 9 ) 9 2 2 - 7 4 4 9 w w w , m t - I a . c o m Member American Society of Landscape Architects March 23,2020 1. Preparing for and attending meetings related to the ongoing dispute with ERRG and the City of Spokane Valley regarding ERRG's failure to perform in accordance with the contract documents. 2. Preparing for and attending site construction meetings. Including but not limited to Substantial Completion and Final Completion. Preparation of Substantial Completion and Final Completion Punchlists and review of closeout submittals. Summary. Our Contract with the City (Contract No. 19-035.00) includes: Current Contract Total Fee: $59,623.50 Additional Services Tasks: 1. Meetings and support for dispute with ERRG: $3,250.00 2. Additional Meetings, Site Observation and Reports: $5,850.00 Subtotal: $9,100.00 Expenses: $285.00 Total: $9,385.00 This additional fee request is a direct result of the failure of ERRG to properly staff and complete this project on time. The actions of the Contractor have been and continue to be out of MTLA's control and the failure of ERRG to complete the project on time are their sole responsibility and are not a result of any actions by MTLA. Please let me know if you have any questions or concerns. Excluded Services: The following services are excluded but may be provided if requested by the City of Spokane Valley. 1. Review and site construction administration related to replacement of section of asphalt trail that was installed at ERRG's risk when geotechnical testing noted that the base rock did not meet specifications. Additional Geotechnical testing and reporting for the replacement of the trail section are likely to be required. We understand that the City has determined that they will not require ERRG to replace that section of the trail. Since -_; - is ael D. Terrell, ASLA Principal • Page 2 MEMO To:City of Spokane Parks and Recreation Attention:Mike Stone From:Mike Terrell Date:4/13/2020 Project:Browns Park Phase V Construction Project No: 14-002H Re:Additional Services Fee Request CC:File Mr.Stone, We have reviewed the level of effort and changes to the scope of services for Browns Park Phase V Construction,Construction Administration Services.Due to the failure of ERRG to adequately staff and manage the construction of this project, MTLA has been required to prepare for and attend additional meetings,site visits with the contractor to document lack of progress toward completing the project per the contract documents and scheduled Substantial Completion date of November 1, 2019. To date the project is not Substantially Complete and the contractor continues to dispute the conditions of the contract with the City of Spokane Valley.In addition to additional Construction Administration responsibilities,MTLA has had to provide additional documentation to the City of Spokane Valley and attend additional meetings with city staff as part of the continuing failure by ERRG to complete the project on time. On March 5,2020 a meeting was held on site between the City of Spokane Valley(Mike Stone), ERRG (Ryan Boorman and Spencer Slominski), MTLA(Mike Terrell)and Senske representatives.The meeting identified a number of critical issues and tasks that remain to be completed before the project could be designated complete. ERRG indicated that it was possible that they work would not be completed until May. As of this date,the project is still not Substantially Complete and ERRG has not resumed construction per the contract documents. In order for MTLA to continue to represent the City of Spokane Valley during the contractor's completion of the project,we are requesting the following additional services fees to compensate for the additional efforts caused by the contractor's failure to perform.I request the following additional scope of work and fee to complete the project. ERRG's past performance and continuing dispute with the City of Spokane Valley make estimating the remaining construction administration fee difficult at best. Proposed Additional Services Scope of Work Represent the City of Spokane Valley during the completion of construction for the Browns Park Phase V Construction.Including: 1. Preparing for and attending meetings related to the ongoing dispute with ERRG and the City of Spokane Valley regarding ERRG's failure to perform in accordance with the contract documents. 2. Preparing for and attending site construction meetings. Including but not limited to Substantial Completion and Final Completion. Preparation of Substantial Completion and Final Completion Punchlists and review of closeout submittals. Summary. Our Contract with the City(Contract No.19-035.00)includes: Current Contract Total Fee: $59,623.50 Additional Services Tasks:$4,869.35 Michael Terrell ■ Landscape Architecture , PLLC 1 4 2 1 N . M e a d o w w o o d Lane , Suite 1 5 0 0 Liberty L a k e , WA 9 9 0 1 9 ( 5 0 9 ) 9 2 2 - 7 4 4 9 w w w . m t - l a . c o m Member American Society of Landscape Architects April 13,2020 1. Additional meetings and support for dispute with ERRG: $3,250.00 2. Additional Meetings,Site Observation and Reports to date: $1,619.35 See attached detail. Subtotal: $4,869.35 3. Additional Fee Requested to Complete Construction Administration: $4,312.33 (hourly not to exceed). Hours are estimated based on previous meetings for this and other similar projects. Six Construction Meetings on Site(6x$447.72=$2,686.33) $2,686.33 (Includes Meeting Prep,Meeting and Meeting Notes Preparation Principal LA:2.1 hours @$120=$252.00 LA:1.25 Hours @$72=$96.12 Designer:.75 hours @$54=$99.60 Substantial Completion,Final Completion and Backcheck $1,152.00 per the specifications. Three Meetings/Site Visits:3x$384.00=$1,152.00) Principal LA:2.1 hours @$120=$252.00 LA:1.25 Hours @$72=$96.12 Designer:.75 hours @$54=$99.60 Closeout Review:0&Manual,As-Builts,Etc.:$474.00 $474.00 Principal LA:1.25 hours @$120=$252.00 LA:1.5 Hours @$72=$96.12 Designer:4 hours @$54=$99.60 Subtotal: $4,312.33 Subtotal: $9,181.68 Expenses: $285.00 Total: $9,466.68 This additional fee request is a direct result of the failure of ERRG to properly staff and complete this project on time.The actions of the Contractor have been and continue to be out of MTLA's control and the failure of ERRG to complete the project on time are their sole responsibility and are not a result of any actions by MTLA. Please let me know if you have any questions or concerns. Excluded Services:The following services are excluded but may be provided if requested by the City of Spokane Valley. 1. Review and site construction administration related to replacement of section of asphalt trail that was installed at ERRG's risk when geotechnical testing noted that the base rock did not meet specifications. Additional Geotechnical testing and reporting for the replacement of the trail section are likely to be required.We understand that the City has determined that they will not require ERRG to replace that section of the trail. Sincerel MI .e •.T- rell,ASLA Principal • Page 2 April 13,2020 Additional Services Detail The following information is provided to document the additional services provided during construction administration that were above and beyond the those detailed in our contract and scope of services. MT-LA Hourly Rates(2019): Principal Landscape Architect/Michael Terrell: $120.00 Landscape Architect/Jeff Stiltz: $72.00 Landscape Designer/Staci Heathman: $54.00 The contract construction schedule was anticipated to be: • June 4,2019:Notice to Proceed • August 19,2019:Site available for contractor to commence construction • November 1,2019:Substantial Completion. Original Scope of Work A. Site Meetings/Visits:Maximum of 5.Original Construction Schedule B. MT-LA Attended meetings on the following dates at the request of the city during construction.The hours reflect meeting preparation,meeting attendance and meeting notes preparation.This does not include hours associated with RFI responses, Change Order reviews and responses and submittal review. 1. July 24,2019:Pre-Construction Meeting,Meeting Notes Prepared • Mike Terrell:1:15 hours • Jeff Stiltz:3:29 hours 2. August 2, 2019: Electrical Pre-Construction Meeting, Meeting Notes Prepared: Electrical consultant attended. 3. August 16,2019:CXT Building Meeting with staff • Jeff Stiltz:2:14 hours 4. August 29,2019:Site Meeting,Meeting Notes Prepared • Mike Terrell:1:50 hours • Jeff Stiltz:1:23 hours 5. September 12,2019:Site Meeting,Meeting Notes Prepared • Jeff Stiltz:1:30 hours 6. September 26,2019:Site Meeting,Meeting Notes Prepared • Mike Terrell:2:00 hours • Jeff Stiltz:1:30 hours/1:26 Hours notes prep. 7. October 2,2019:Site visit to review status of fence for contractors proposed change order. Meeting Notes Prepared • Mike Terrell: 1:52 hours 8. October 10,2019:Site Meeting,Meeting Notes Prepared • Mike Terrell:1:30 hours 9. October 17,2019:Construction Schedule Meeting with Contractor at CenterPlace,Meeting Notes Prepared • Mike Terrell:1:00 hour/1:26 hour/:39 min/:46 min/:45 min • Jeff Stiltz::25 min/1:23 hours 10. October 24,2019:Site Meeting Notes Prepared • Jeff Stiltz:2:00 hours/2:13 hours • Page 3 April 13,2020 11. November 1, 2019: Site Observation to document status of non-completion on contract date of Substantial Completion.Report Prepared • Jeff Stiltz:55 min 12. November 5,2019:Site meeting with contractor and Mike Stone,Meeting Notes Prepared • Mike Terrell:2:15 hours/2:04 hours meeting report 13. November 7,2019:Site Meeting,Paving,Meeting Notes Prepared • Mike Terrell:1:15 hours/2:00 hours/1:00 hours/:45 min • Jeff Stiltz:52 min 14. November 21,2019:Site Meeting,Meeting Notes Prepared • Jeff Stiltz:3:30 hours 15. November 25,2019:Site Meeting with contractor regarding suspension of work for season. Meeting Notes Prepared • Mike Terrell:2:00 hours/:30 min/1:29 hours 16. December 17, 2019: Meeting with City of Spokane Valley staff and legal regarding ERRG performance. • Mike Terrell:2:43 hours meeting prep/1:30 hours meeting • Mike Terrell:Site visit meeting with ERRG,:30 min 17. January 7,2020:Site visit to document status • Jeff Stiltz:2:30 hours 18. February 10,2020:Meeting the City of Spokane Valley Staff and ERRG. • Mike Terrell:4:00 hours 19. March 5,2020:Site Meeting with ERRG and City Staff to review status of site. • Mike Terrell:4:30 meeting prep and meeting on site. Summary of Hours Expended to Date: Employee Hours Rate Total • Principal Landscape Architect: 39:54 hours 120 $4,788.00 Landscape Architect: 25:17 hours 72 $1,820.40 Total: $6,608.40 Average Cost per Meeting($6,608.40/19)= $347.81 5 Contracted Meetings(5 x$347.81) $1739.05 Fee associated with 14 additional meetings(14 x$347.81)= $4,869.35 Summary of Additional Hours Anticipated for Construction Administration Number of Meetings MTLA attended nineteen meetings, fourteen more than were included in our contract. We have completed all the other required The contractor did not complete the project per their contract Substantial Completion date of November 1,2019.As of 4/10/2020 the contractor has not completed the project and based on past performance additional site meetings and reviews will be required. • Page 4 DATE(MM/DDIYYYY) S iZiDgb CERTIFICATE OF LIABILITY INSURANCE DATE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. • IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATIONIS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER CONTACT NAME: 443-6112 USAA INSURANCE AGENCY INC/PHS FAX 888 PHONE (888)242-1430 (NC,No):( ) 65812846 (NC,No,Ext): The Hartford Business Service Center E-MAIL 3600 Wiseman Blvd ADDRESS: San Antonio,TX 78251 INSURER(S)AFFORDING COVERAGE NAIC# INSURER A: Hartford Casualty Insurance Company 29424 INSURED MICHAEL TERRELL-LANDSCAPE ARCHITECTURE,PLLC INSURER B: 5312 S CHAPMAN RD INSURER C: GREENACRES WA 99016-8832 INSURER D INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVPOLE BEENEFF REDUCED EXP PAID CLAIMS. LIMITS INSR ADDL SUER POLICY NUMBER (NIMIDD/YYYY) IMMIDD/Y YYY) TYPE OF INSURANCE INSR WVD LTR EACH OCCURRENCE $2,000,000 COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $300,000 CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) X General Liability MED EXP(Any one person) $10,000 X65 SBA PU5843 01/13/2020 01/13/2021 PERSONAL&ADV INJURY $2,000,000 A GENERAL AGGREGATE $4,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO- I X I LOC PRODUCTS-COMP/OP AGG $4,000,000 JECT OTHER: COMBINED SINGLE LIMIT $2,000,000 AUTOMOBILE LIABILITY (Ea accident) BODILY INJURY(Per person) • ANY AUTO A ALL OWNED SCHEDULED 65 SBA PU5843 01/13/2020 01/13/2021 BODILY INJURY(Per accident) TOS AUTOS AU PROPERTY DAMAGE HIRED X NON-OWNED (Per accident) X AUTOS AUTOS EACH OCCURRENCE UMBRELLA LIAB OCCUR EXCESS LIAB CLAIMS- AGGREGATE MADE DEDI 'RETENTION$ PER WORKERS COMPENSATION I STATUTE I I ERH AND EMPLOYERS'LIABILITY E.L.EACH ACCIDENT ANY YIN PROPRIETOR/PARTNER/EXECUTIVE — NI A E.L DISEASE-EA EMPLOYEE OFFICER/MEMBER EXCLUDED? (Mandatory In NH) E.L DISEASE-POLICY LIMIT If yes,describe under DESCRIPTION OF OPERATIONS below Each Claim Limit $5,000 A EMPLOYMENT PRACTICES 65 SBA PU5843 01/13/2020 01/13/2021 LIABILITY Aggregate Limit $5,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) Those usual to the Insured's Operations.Certificate holder is an additional insured per the Business Liability Coverage Form SS0008 attached to this policy. CERTIFICATE HOLDER CANCELLATION City of Spokane valley SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED 2BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED Spokane ne Valley D WAry 992166e IN ACCORDANCE WITH THE POLICY PROVISIONS. Spokane AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION.All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD ACORO� LIABILITY INSURANCE DATE(MM/DD/YYYY) CERTIFICATE O F 12/30/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER.AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAME:CONrACT Karen Bronson CorRisk Solutions IF,X (M.N., 312-637-8755 (uc,rb,Eaa 180 N Stetson Ave Suite 4500 EWO. kbronson@corrisksolutions.com Chicago, IL 60601 AOq�� INSURER(S)AFFORDING COVERAGE NAIC# INSURER A: New Hampshire Insurance Company 23841 INSURED INSURER B: Michael Terrell - Landscape Architecture, PLLC INSURERC: 5312 South Chapman Road Greenacres, WA 99016 INSURERD: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADM_ SUER POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSRD WVD (MM/DDIYYYY) (MM/DD/YYYY) GENERAL LIABILITY EACH OCCURANCE COMMERCIAL GENERAL LIABILITY PR S(RENTED PREMISES(Ea occurance) CLAIMS MADE I I OCCUR MED EXP(Any one person) DOES NOT APPLY PERSONAL&AND INJURY GENERAL AGGREGATE GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG —1 POLICY I]PROJECT n LOC AUTOMOBILE LIABILITY eOMbINLU SINULL LIMI I(La accident) ANY AUTO BODILY INJURY(Per person) — ALL OWNED —SCHEDULED DOES NOT APPLY BODILY INJURY(Per accident) —AUTOS —,AUTOS HIRED AUTOS NON-OWNED PROPERTY DAMAGE(Per Al(V IC accident) UMBRELLA LIAB OCCUR EACH OCCURANCE EXCESS LIAB CLAIMS MADE DOES NOT APPLY AGGREGATE DED RETENTION$ WORKERS COMPENSATION WC STATU- OTHER AND EMPLOYERS'LIABILITY TORY LIMITS ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT OFFICE/MEMBER EXCLUDED? Y/N N/A DOES NOT APPLY t.L UIStSAt-LA (Mandatory In NH) ❑ EMPLOYEE If yes,describe under DESCRIPTION OF OPERATIONS below EL DISEASE-POLICY LIMIT A Professional Liability064991268- 01/16/20 01/16/21 Per occurrence. $2,000,000 04 Annual Aggregate: $2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES(Attach ACCORD 101,Additional Remarks Schedule,if more space is required) Landscape Architecture Consulting CERTIFICATE HOLDER CANCELLATION City of Spokane Valley Parks and Recreation SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE Department THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Attention: Mike Stone 2426 N. Discovery Place AUTHORIZED REPRESENTATIVE Spokane Valley, WA 99216 ACORD 25(2010/05) 01988-2010 ACORD CORPORATION.AlIrIghts reserved. The ACORD name and logo are registered marks of ACORD Waligtort Owaarwt Labor&Industries-(h_ps://Ini.wa,gov), MICHAEL TERRELL LANDSCAPE ARCHITECTURE PLLC Owner or tradesperson MICHAEL TERRELL 5312 S CHAPMAN RD Doing business as GREENACRES,WA 99016-8832 MICHAEL TERRELL LANDSCAPE WA UBI No. Governing persons 603 368 643 MICHAEL D TERRELL KARA L TERRELL; Certifications & Endorsements OMWBE Certifications No active certifications exist for this business. Apprentice Training Agent fro active Washington registered apprentices exist for this business.Washington allows the use of apprentices registered with Oregon or Montana.Contact the Oregon Bureau of Labor&Industries or Montana Department of Labor &Industry to verify if this business has apprentices. Workers' Comp Do you know if the business has employees?If so,verify the business is up-to-date on workers'comp premiums. L&I Account ID Account is current. 072,594-02 Doing business as MICHAEL TERRELL LANDSCAPE Estimated workers reported Quarter 4 of Year 2019"1 to 3 Workers" L&I account contact T2/CRYSTAL RALKEY(360)902-4635-Email:KECR235@lni.wa.gov Public Works Requirements Verify the contractor is eligible to perform work on public works projects. Required Training—Effective July 1,2019 Needs fo complete training. Contractor Strikes No strikes have been issued against this contractor. Contractors not allowed to bid No debarments have Seen issued against this contractor. Workplace Safety & Health Check for any past safety and health violations found on jobsites this business was responsible for. No inspections during the previous 6 year period.