2012, 07-03 Permit SW-12001667 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12001667
Permit Issued Date:
07/03/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: J L HAWKINS EXCAVATING
Project Name: GREENHAVEN 2 Applicant: J L HAWKINS EXCAVATING
Permit Type: SEWER Address: 9722 E NORA AVE
SPOKANE, WA 99206-0000
Phone: 509-924-9025
Email:
SITE INFORMATION:
Site Address: 17620 E COWLEY AVE Owner:
Parcel Number: 55183.0937 Address:
Subdivision: CORBIN ADDITION Phone:
Assessor's Description: CORBIN ADD TO GREENACRES WLY 1/2 OF WLY Email:
1/2 OF LT 3 BLK 1 8 EXC NLY 5'
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 21240 Square Feet
MEIDLING, MICHAEL/MCLANE,
THERESA M
PO BOX 369
GREENACRES, WA 99016
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
JLHAWE*222LE
J L HAWKINS EXCAVATING
9722 E NORA AVE
SPOKANE, WA 99206-0000
509-924-9025
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 07/03/2012 10:51:49
Printed by: I IS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001667 07/03/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/03/2012 10:51:49
Printed by: IIS APPPOOLWSP.NET v4.0