Loading...
2013, 05-16 Permit SW-13000723 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000723 Permit Issued Date: 05/16/2013 Expiration Date: 05/16/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION GREEN HAVEN PH II LAUER EXCAVATION & CONST 509-981-7954 Applicant: LAUER EXCAVATION & CONST Address: Phone: Email: PO BOX 11581 SPOKANE VALLEY, WA 99211 509-981-7954 SITE INFORMATION: Site Address: Parcel Number: 18108 E COWLEY AVE 55184.1504 Assessor's Description: CORBIN ADD GRNACRS PT OF L13 B15 PTN OF L13 NLY OF PRO D NLY LN OF L23 EXC NLY 5FT &EXC BEG AT NELY COR TH WLY 70FT TH S LY PAR TO ELY LN TO PROD NLY LN OF L23 TH E ALG SD LN TO ELY LN TH NLY TO POB Inspection Area: : (509)-477-3675 Zoning: Owner: Address: Phone: Email: Water District: Consolidated Irrigation District #19 BROWN, DANIEL R 18108 E COWLEY AVE SPOKANE VALLEY, WA 99016-9390 Fire District: Spokane Valley Fire Land Area: 22125 Square Feet CONTRACTOR INFORMATION: LAUEREC931DA, Exp. 03/01/2015 LAUER EXCAVATION & CONST PO BOX 11581 SPOKANE VALLEY, WA 99211 509-981-7954 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/16/2013 11:07:02 Project Coordinator: Dawn Dumpier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000723 Permit Issued Date: 05/16/2013 Expiration Date: 05/16/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/16/201311:07:02 Project Coordinator: Dawn Dompier