2014, 08-19 Permit SW-14001210 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001210
Permit Issued Date: 08/19/2014
Expiration Date: 08/19/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
GREEN HAVEN PH 3
CHRIS FOLSOM CONSTRUCTION
509-979-3942
Applicant:
Address:
Phone:
Email:
CHRIS FOLSOM CONSTRUCTION
1722 S BOLIVAR RD
VERADALE, WA 99037
509-979-3942
SITE INFORMATION:
Site Address:
Parcel Number:
18305 E COWLEY AVE
55184.1109
Owner:
Address:
Phone:
Assessor's Description: CORBIN ADD GRNACRS PRT OF B11 BEG ON WL Email:
OF B11 263.3FT S OF NWCOR OF L6 TH E PAR
WITH NL 200FT TH S PAR TO WL TO SLY L N SD
B TH WLY ALG SLY LN &NLY ALG WL TO POB
EXC SLY 5FT
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation
District #19
Zoning:
HOWE FAMILY TRUST
1217 N OBERLIN RD
SPOKANE, WA 99206-3958
Fire District: Spokane Valley Fire
Land Area: 28748 Square Feet
CONTRACTOR INFORMATION:
CHRISFC877LC, Exp. 06/03/2015
CHRIS FOLSOM CONSTRUCTION
1722 S BOLIVAR RD VERADALE, WA 99037
509-979-3942
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 08/19/2014 08:11:09 Project Coordinator: Vickie Meniott
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001210 Permit Issued Date: 08/19/2014
Expiration Date: 08/19/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/19/2014 08:11:09 Project Coordinator: Vickie Merriott