Loading...
2014, 08-19 Permit SW-14001210 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001210 Permit Issued Date: 08/19/2014 Expiration Date: 08/19/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION GREEN HAVEN PH 3 CHRIS FOLSOM CONSTRUCTION 509-979-3942 Applicant: Address: Phone: Email: CHRIS FOLSOM CONSTRUCTION 1722 S BOLIVAR RD VERADALE, WA 99037 509-979-3942 SITE INFORMATION: Site Address: Parcel Number: 18305 E COWLEY AVE 55184.1109 Owner: Address: Phone: Assessor's Description: CORBIN ADD GRNACRS PRT OF B11 BEG ON WL Email: OF B11 263.3FT S OF NWCOR OF L6 TH E PAR WITH NL 200FT TH S PAR TO WL TO SLY L N SD B TH WLY ALG SLY LN &NLY ALG WL TO POB EXC SLY 5FT Inspection Area: : (509)-477-3675 Water District: Consolidated Irrigation District #19 Zoning: HOWE FAMILY TRUST 1217 N OBERLIN RD SPOKANE, WA 99206-3958 Fire District: Spokane Valley Fire Land Area: 28748 Square Feet CONTRACTOR INFORMATION: CHRISFC877LC, Exp. 06/03/2015 CHRIS FOLSOM CONSTRUCTION 1722 S BOLIVAR RD VERADALE, WA 99037 509-979-3942 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 08/19/2014 08:11:09 Project Coordinator: Vickie Meniott SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001210 Permit Issued Date: 08/19/2014 Expiration Date: 08/19/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/19/2014 08:11:09 Project Coordinator: Vickie Merriott