2013, 03-11 Permit SW-13000183 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000183 Permit Issued Date: 03/11/2013
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
GREEN HAVEN PH 3
CANYONRIVER LANDSCAPE & IRRIGATION INC
509-258-7699
Applicant:
Address:
Phone:
Email:
CANYONRIVER LANDSCAPE &
IRRIGATION INC
5435 CORKSCREW CANYON RD
TUMTUM, WA 99034
509-258-7699
SITE INFORMATION:
Site Address:
Parcel Number:
18602 E COWLEY AVE
55184.0806
Assessor's Description: CORBIN ADD GRNACRS W80FT OF 5176.5FT OF
N181.5FT OF LT 3 BLK 8 TAX EXEMPT
PURPOSES ONLY
Inspection Area: : (509)-477-3675
Owner: NACCARATO, JAY & SHARON
Address: PO BOX 309
GREENACRES, WA 99016
Phone:
Email:
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Zoning: Land Area: 14080 Square Feet
CONTRACTOR INFORMATION:
CANYOLI916CO, Exp. 07/16/2014
CANYONRIVER LANDSCAPE & IRRIGATION INC
5435 CORKSCREW CANYON RD
TUMTUM, WA 99034
509-258-7699
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 03/11/2013 11:36:43 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000183 Permit Issued Date: 03/11/2013
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/11/2013 11:36:43 Project Coordinator: Kathy Cummings