2012, 05-07 Permit App APR-2012-0024 ApproachCommunity Development Department (Staff Use Only)
Permit Center
Spokane 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
Spokane Valley, WA 99206
jva11ey% Tel: (509) 688-0036 0 PERMIT FEE:
Fax: (509)668-0033 7
oermitcenterca)sookanevalley.oro U12, . 002
APPROACH PERMIT APPLICATION k2, C
PROJECT ADDRESS: , 4. WW
START DATE: �?,p// ) _ ANTICIPATED COM12LETION DATE: /—i ,ar ,7_
BUILDING OWNER NAME:
MAILING ADDRESS:
PHONE: V)ii'l —7 � ) —
CONTRACTOR NAME:
MAILING ADDRESS:
CITY: STATE: �,O A— ZIP:
LICENSE No.:
CITY BUSINESS LICENSE NO.:
PROJECT DESCRIPTION (Please Provide Site Sketch)
residential Driveway ❑ Commercial/Industrial Driveway
❑ Existing Curb & Gutter ❑ Rural Road Section
❑ Culvert Installation ❑ Sidewalk Repair/ Construction
❑ Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of
Spokane Valley Development code. Referenced cqAes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is nota rmlt or approyarfor any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required a submitted d ubsequently approved before this application can be processed.
r
Date: - ,
11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permlt_1-11-11.doc
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
_ ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
❑ Other (please describe below)
W1
Z
DISTANCE FROM
Commercial Approaches
NEAREST PROPERTY LINE -
15' minimum
MAY BE LEFT OR RIGHT SIDE) 47
Separation between Approaches (measured
from centerline to centerline of each
approach)
FT
FT (SEE TABLE)
w
al
Throat Width Flatportion)
16' min. 30' max.
APPROACH CURB
Wing Width at curb line
RETURN
CURB
� 'Ifs— ----I—
' WNO 0( EE TABLET WINp �IF CORf�R LOT,
5.0'
DISTANCE FROM
Minimum Distance from Crosswalk
STREET NAME CURB RETURN
S'
Q FT (SEE TABLE)
STREET WITH CURB
w i
DI STANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
MSEE TABLE)
I ASPHALT 15'RADIUS RADIUS
a�
APPROACH RETURN
EDGE OF
TI -BOAT WIDTH FT
ASPHALT
(SEE TAB IF CORNER LOT,
DISTANCE FROM
STREET NAME RADIUS RETURN
Q FT (SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width Flatportion)
16' min. 30' max.
30' min. 40' max.
Wing Width at curb line
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
r w
5.0'
5.0'
Minimum Distance from Crosswalk
5'
S'
yj1
f
4
31 fz}-