Loading...
2012, 05-07 Permit App APR-2012-0024 ApproachCommunity Development Department (Staff Use Only) Permit Center Spokane 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: Spokane Valley, WA 99206 jva11ey% Tel: (509) 688-0036 0 PERMIT FEE: Fax: (509)668-0033 7 oermitcenterca)sookanevalley.oro U12, . 002 APPROACH PERMIT APPLICATION k2, C PROJECT ADDRESS: , 4. WW START DATE: �?,p// ) _ ANTICIPATED COM12LETION DATE: /—i ,ar ,7_ BUILDING OWNER NAME: MAILING ADDRESS: PHONE: V)ii'l —7 � ) — CONTRACTOR NAME: MAILING ADDRESS: CITY: STATE: �,O A— ZIP: LICENSE No.: CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) residential Driveway ❑ Commercial/Industrial Driveway ❑ Existing Curb & Gutter ❑ Rural Road Section ❑ Culvert Installation ❑ Sidewalk Repair/ Construction ❑ Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced cqAes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is nota rmlt or approyarfor any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be required a submitted d ubsequently approved before this application can be processed. r Date: - , 11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permlt_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide _ ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) W1 Z DISTANCE FROM Commercial Approaches NEAREST PROPERTY LINE - 15' minimum MAY BE LEFT OR RIGHT SIDE) 47 Separation between Approaches (measured from centerline to centerline of each approach) FT FT (SEE TABLE) w al Throat Width Flatportion) 16' min. 30' max. APPROACH CURB Wing Width at curb line RETURN CURB � 'Ifs— ----I— ' WNO 0( EE TABLET WINp �IF CORf�R LOT, 5.0' DISTANCE FROM Minimum Distance from Crosswalk STREET NAME CURB RETURN S' Q FT (SEE TABLE) STREET WITH CURB w i DI STANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) MSEE TABLE) I ASPHALT 15'RADIUS RADIUS a� APPROACH RETURN EDGE OF TI -BOAT WIDTH FT ASPHALT (SEE TAB IF CORNER LOT, DISTANCE FROM STREET NAME RADIUS RETURN Q FT (SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width Flatportion) 16' min. 30' max. 30' min. 40' max. Wing Width at curb line 4 feet typical 4 feet typical Minimum Distance from Side Property Line r w 5.0' 5.0' Minimum Distance from Crosswalk 5' S' yj1 f 4 31 fz}-