HomeMy WebLinkAbout2014, 05-16 Permit SW-14000660 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000660
Permit Issued Date: 05/16/2014
Expiration Date: 05/16/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
BLOCK 3 GRANDVIEW ACRES
ARROW EXCAVATION, INC
208-773-5837
Applicant: ARROW EXCAVATION, INC
Address:
Phone:
Email:
1041 W ROMAN RD
POST FALLS, ID 83854
208-773-5837
SITE INFORMATION:
Site Address: 10823 E COYOTE ROCK LN
Parcel Number: 45043.1502
Assessor's Description: GRANDVIEW ACRES PTN BLK 3 DAF; BEG AT
NW COR OF SW1/4, TH S ALG W LN 1797.46FT
PT BEING S R/W LN OF SPOKANE
INTERNATIONAL RR SPUR, TH NELY ALG SD
SLY RPW LN 300FT TO POB, TH CONT NELY ALG
SD SLY RR
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Irvin Water District #6
ARROTTA, RANDY
PO BOX 245
SPOKANE VALLEY, WA 99037
Fire District: Spokane Valley Fire
Land Area: 33706 Square Feet
CONTRACTOR INFORMATION:
ARROWEI055DF, Exp. 07/20/2015
ARROW EXCAVATION, INC
1041 W ROMAN RD POST FALLS ID 83854
208-773-5837
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1
$125.00 $125.00
$125.00
CONDITIONS:
Possible Shoreline On Site
Possible FEMA Flood Zone
Possible Floodplain
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Date Printed: 05/16/2014 10:58:55 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000660 Permit Issued Date: 05/16/2014
Expiration Date: 05/16/2015
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/16/2014 10:58:55 Project Coordinator: Dawn Dampier