2011, 11-07 Permit App 11003495 Residence, GarageProject Number: 11003495 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW 1868 SQFT -1 STORY -1 DU W/ 3 CAR
ATTACHED GARAGE
Setbacks: Front
Site Information:
Plat Key:
Left: Right: Rear:
Name: Range
Date: 11/07/2011 Page 1 of 3
Contact: INVEST NORTHWEST INC
Address: 3508 E WESLEY
C - S - Z: SPOKANE, WA 99202
Phone: (509) 999-5864
Group Name:
Project Name:
District: Nort
Parcel Number: 45043.1519 Block:
SiteAddress: 11321 E COYOTE ROCK LN
Location:: CSV
Lot:
Owner: Name: INVEST NORTHWEST INC
Address: 3508 E WESLEY
SPOKANE, WA 99202
Zoning: MUC Mixed Use Center District
Water District: 026 IRVIN
Area: 50,094 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released: 11/07/2011 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Driveway/Approach
Originally Released: 11/03/2011 By: mharnois
Released By:
Sewer Review
Permits:
Released By:
Operator: MBB
Printed By: MT
Print Date: 11/07/2011
Project Number: 11003495
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Inv: 1
Contractor: INVEST NORTHWEST INC
Address: 13519 E BOONE
SPOKANE, WA 99202
Group: R-3
Group: U-1
Total Area
Building Height
Stories
Dwelling Units
Description
1&2 FAMILY
COV DECK
DECK OPEN
GAR WOOD
Type: VB
Type: VB
2655
14
1
1
Grp Type
R-3 VB
R-3 VB
R-3 VB
U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Building Permit
Date: 11/07/2011 Page 2 of 3
Firm: INVEST NORTHWEST INC
Phone: (509) 999-5864
Building Characteristics
This Application: Total Project:
Notes Sq Ft Valuation So Ft Valuation
MAIN 1,868 $188,574.60 1,868 $188,574.60
FLOOR
COVERED 393 $5,895.00 393 $5,895.00
OPEN 150 $2,250.00 150 $2,250.00
ATT 846 $16,074.00 846 $16,074.00
GARAGE
Contractor: INVEST NORTHWEST
Address: 13519 E BOONE
SPOKANE, WA 99202
Item Description
GAS WATER HEATER
GAS PIPING
VENTILATING FANS 1 DUCT
AIR HANDLER <=10,000 CFM
UNLISTED APP < 400k BTU
Totals: 3,257 $212,793.60 3,257 $212,793.60
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Mechanical Permit
Fee Amount
$1,626.55
$4.50
$650.62
$2,281.67
INC Firm: INVEST NORTHWEST INC
Phone: (509) 999-5864
Units Unit Desc
1 NUMBER OF
1 # OF UNITS
4 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Permit Total Fees:
Fee Amount
$11.00
$1.00
$44.00
$13.00
$52.00
$121.00
Operator: MBB
Printed By: MT
Print Date: 11/07/2011
Project Number: 11003495 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: INVEST NORTHWEST INC
Address: 13519 E BOONE
SPOKANE, WA 99202
Item Description
TOILETS/BIDETS
SINKS
SHOWERS
DISH WASHERS
GARBAGE DISPOSAL
CLOTHES WASHER
WATER HEATER -ELECTRIC
WATER PIPING - DWV
Plumbing Permit
Date: 11/07/2011
Page 3 of 3
Firm: INVEST NORTHWEST INC
Phone: (509) 999-5864
Units Unit Desc
2 NUMBER OF
3 NUMBER OF
2 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Permit Total Fees:
Fee Amount
$12.00
$18.00
$12.00
$6.00
$6.00
$6.00
$6.00
$6.00
NO BUILDING PERMITS ISSUED ON THIS SITE UNTIL FURTHER NOTICE-MH
Payment Summary:
Permit Type
Building Permit
Mechanical Permit
Plumbing Permit
Fee Amount Invoice Amount
$2,281.67 $2,281.67
$121.00 $121.00
$72.00 $72.00
Amount Paid
$637.18
$0.00
$0.00
$72.00
Amount Owing
$1,644.49
$121.00
$72.00
$2,474.67 $2,474.67 $637.18 $1,837.49
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: MBB
Printed By: MT
Print Date: 11/07/2011
j
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-2540
Fax: (509) 688-0037
oermitcenter(6sookanevallev.orq
(Staff Use Only)
PERMIT NUMBER: —34-95--
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION ❑ ADDITION/REMODEL
❑ DECK ❑ OTHER
SITE ADDRESS: // / (C� c, p j i Ri C le (�ye-
ASSESSORS PARCEL NO.: //5 (3. "--/9 LEGAL DESCRIPTION:
❑ ACCESSORY BUILDING
BUILDING OWNER NAME: T`'tcse-s i`- %.r7(4
NAME:
ADDRESS: 2 ojec,/e . (`
CITY: GA�
PHONE: 5'09 -979 6C/
CONTACT NAME:
STATE:
FAX: S O �f — S C/
ZIP:°r- (n
PHONE:
FAX: CELL:
CONTRACTOR NAME: tj L1lfS1 ./%/ r/4:=u1,11
MAILING ADDRESS: , 25-c c /t,
CITY:
PHONE:
STATE:
ZIP: 9 c7
FAX: $`OS S3 `/ - / 7 _ CELL: 9f Q
CONTRACTOR LICENSE NO.17;0(/Es ) /93z EXPIRES: -7/30/� CITY BUSINESS LICENSE NO.: GOCG/ q r$ 6
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
y'kw � s (-
****YOU MUST COMPLETE THE FOLLOWING****
MARK N /A IF NOT APPLICAB
Height to Peak: // •
Dimensions:�� k� ,
No. of Stories: /
Total Habitable/ �6 Space: /
Main Floor SQ FT: b!�
/Pe o
Upper Floor S4�FT:
f - \ =
Unfinished Basement SQ
FT: - -- -
Finished Basement SQ
FT: ----
Garage SQ FT:
cam�Q
✓ Deck/ vered Patio SQ
FT: ��
Impervious Surface
Area:
30% Slopes on
Property: co
No. of Bedrooms: ,-� `Cons on Type:
Heat Source: , ,,c9 pirGo2
Sewer or Septic: PuX i^
TOTAL COST OF PROJECT: $
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date: /D
Updated 1-11-11 Page 1 of 1
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Building Permit - Residential 11-
11-11.doc
Community Development
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcenter@spokanevallev.org
Mechanical Permit Application
PERMIT NUMBER:
PERMIT FEE:
❑ Commercial
esidential
SITE ADDRESS: // 3 / tp O r� ,aK le Z6
Building Owner
Name: Lid?S% .}fie
Address:
Phone:_5-- c/_ / 7 S�
City:
Fax: s- r/ - 7
J
State:
Zip:
Contractor
Name: 7/U//i57 i d 7 I Gtae5 7 -G
Address:
License No:
Contact/Project Manager:
Phone:
Fax:
City: /lc e
4iho bey:: ?4 �", City Busin ss Lic: _ hi,/ 9 s
State: W—
Zip: 9
Name:
Phone:
I /
#UNITS
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER
0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
z
GAS PIPING SYSTEM (each outlet)
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 hp-100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 - 15 hp — 100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 — 30 hp - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 hp —1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 50 hp — over 1,750,000 BTU
AIR HANDLER (DOES NOT include ducting)
Each unit up to 10,000 cfm, including ducts
/
AIR HANDLER (DOES NOT include ducting)
Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
G/
VENTILATION AND EXHAUST
Each ventilation system
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
INCINERATORS
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
APPLIANCES
Range, Clothes Washer
UNLISTED APPLIANCES
Under 400,000 BTU
/
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Type I
HOOD
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM — FREE STANDING
❑CASH ❑ CHECK ❑ VISA ❑ MC
CARD*
EXPIRES:
SIGNATURE
VIN:
P:1Community Development102 Administration103 Forms - Official Versions\Permit Center\Mechanical Permit Application 04-03-09 dg.doc
STiolane
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcenter@spokanevallev.org
Community Development
Plumbing Permit Application
PERMIT NUMBER:
PERMIT FEE:
❑ Commercial Dsidential
SITE ADDRESS: / 3 c / �/ C(9 7 Q 7 $ Poc-4
Building Owner
Name: z`.,,i , � ; z.f. 7.iejo r `,Gs (.t,S r� 2:4,- _ Phone: 5 U LI ._,,, i �T Fax: j Cif — / > 5 3-
Address: City: State: Zip:
Contractor
Name: , TjC) U 1rS T ®< 46 G„).„7 A �0C-Phone: s L, / 7S-L Fax: S 3 Gf --- / ? S-c)-
...."4/
Address: ri �e�5`�.? pijezle, Le-- City: Sec() ,.&truer State: 4r„1 .'I Zip: M �,
, �.
License No: t City Busirfess Lic:
Contact/Project Manager:
Name: �f .j ,...., `-;c Ae �r-� Phone: i i - r = .4 el
!
`-,
# OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
URINALS
TUBS
SHOWERS (per trap)
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Meat
DISHWASHER
j
CLOTHES WASHER
%
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN
Area, Case, Coil, Trench, Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING/DRAIN-IN WASTE
Installation, Alterations, Repair, Reversals
WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
1
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ❑ CHECK ❑ VISA ❑ MC EXPIRES:
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT: http://www.spokanevallev.orq/ under the quick links for Forms, Master Fee Schedule.
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Plumbing Permit Application 04-03-09 dg.doc
Target Date sheet
jam.
For City Use Only
PLUS Project - -
Project Address
1 L Z \ Z
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD-003 V-7/ 06-21-11 Page 1 of 1
FP LIS�
L
C
r
L"J
14,
41
GOS.91 . P►p
p/i/
/9,
)/31. / E coTE /2ec