2009, 06-02 Permit App 09001464 Pole BldgProject Number: 09001464 Inv: 1 Application Date: 6/2/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 30 X 30 POLE BLDG Contact: TOWN & COUNTRY
Address: 5918 E TRENT AVE
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 535-9016
Group Name:
Site Information: Project Name:
Plat Key: 000000 Name: Range District: Sout
Parcel Number. 45324.0118 Block:
SiteAddress: 4130 S CONIFER CT
Location:: CSV
Lot:
Owner: Name: OOS, ROBERT V & ROBIN R
Address: 4130 S CONIFER CRT
SPOKANE VALLEY, WA 99206-966
Zoning: UR -3.5 Urban Residential 3.5
Water District: Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:.:
Review
Building Plan Review
Originally Released:
Landuse/Zoning/HE Conditions
Permits:
Released By: ---
5/27/2009 By: tmelbourn
Released By --- — —
Originally Released: 6/1/2009 By: tschmidt
Operator: JD Printed By: JD Print Date: 6/2/2009
Project Number: 09001464 Inv: I Application Date: 6/2/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: TOWN & COUNTRY BLDG
Address: 3908 W DAIUN LN
CHENEY, WA 99004
Building Permit
Firm: TOWN & COUNTRY BLDG CONT
Phone: (509) 448-8483
Notes:
AS per SVMC 19.40.020 (B) "all residential driveways shall be paved [with an approved] hard surface
material." Condition must be met before final inspection.
Payment Summary: m0
Permit Tvoe Fee Amount Invoice Amount Amount Paid Amount Owina
Building Permit $371.06 $371.06 $73.31 $297.75
$371.06 $371.06 $73.31 $297.75
Disclaimer.-
Submittal
isclaimer.Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 6/2/2009
This Application:
Total Project:
Descriotion Grp Type
Notes
Sa Ft Valuation
Sa Ft
Valuation
POLE BDLG U-1 VB
900 $17,100.00
900
$17,100.00
Totals:
900 $17,100.00
900
$17,100.00
Item Description
Units
Unit Des c
Fee Amount
RESIDENTIAL PERMIT FEE
1
SELECT
$293.25
ACCESSORY PLANS REVIEW
1
SELECT
$73.31
WSBCC SURCHARGE
I
SELECT
$4.50
Permit Total Fees:
$371.06
Notes:
AS per SVMC 19.40.020 (B) "all residential driveways shall be paved [with an approved] hard surface
material." Condition must be met before final inspection.
Payment Summary: m0
Permit Tvoe Fee Amount Invoice Amount Amount Paid Amount Owina
Building Permit $371.06 $371.06 $73.31 $297.75
$371.06 $371.06 $73.31 $297.75
Disclaimer.-
Submittal
isclaimer.Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 6/2/2009
Permit Center
Sp &-e 11707 E Sprague Ave, Suite 106
jy�10;00 Spokane Valley, WA 99206
ey. (509)688-0036 FAX: (509)688-0037
J www.spokanevallev or°
Community Development
Residential Construction
Permit Application ❑
SITE ADDRESS:
FA
- - t �•r�M
1
New Construction
Addition/Remodel
Other:
ASSESSORS PARCEL NO: y5 3 Z 4, U ill G LEGAL DESCRIPTION:
❑ Accessory Bldg
❑ Deck
5. 1
Lescgoe me scope of work In dea l:Cost of Project: $ 11 9137—
to J I Lot moo' X 30' t t-6lzArtE
Proposed Use:
J
**************The Mowing MUST be coraTete: write NIA -if not a livable ************** *******
HEIGHT TO PEAK DIMENSIONS: # OF STORIES: TOTAL HA T BLE SPACE:
l7 = 3ox30k,1z I_ .�l.P
N/�
lI
Af%A–
N/R�
„ F N Nfr as -bums-HLt
AREA:
'V ,t1
[FTG:
SO.FINIFTG SHED BASEM T
GARAG®®.FIGO IL
DECK/COV. PATIO SO. FTG:
30% SLOPES ON
�G
# OF BED OMS:
A
CONSTRUCTION TYPE:
Posr FRAME
N
HEAT SOU CE:
All 4—
PROPERTY:
SEWER OR SEPTIC?
The permftee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the
dwelling ishvill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has fission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of a Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Cente . s City of Spok alley Permit is not a permit or approval for any violation of federal, state or
local laws, codes oro s. 6 tans r add' ' al information maybe required to be submitted, and subsequently approved before
this -application tie s
SIGNATURE: DATE:
Method of Payment
❑ Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
REVISED 2M5M7
For City Use Only
CI F1 OF PLUS Project Number (jci —i4 io�
Skpoane Project Address
�� (,(✓
Valley..;oO°
11703 E Sprague Ave Suite B-3 * Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 1 permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is CD 'I I I o a
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV 9107
ml
y6 3 O
PLANNING DEPT. PROVED
m ° a �,
BY -
DATE:
/
DATE: