Loading...
2009, 06-02 Permit App 09001464 Pole BldgProject Number: 09001464 Inv: 1 Application Date: 6/2/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 30 X 30 POLE BLDG Contact: TOWN & COUNTRY Address: 5918 E TRENT AVE C - S - Z: SPOKANE, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 535-9016 Group Name: Site Information: Project Name: Plat Key: 000000 Name: Range District: Sout Parcel Number. 45324.0118 Block: SiteAddress: 4130 S CONIFER CT Location:: CSV Lot: Owner: Name: OOS, ROBERT V & ROBIN R Address: 4130 S CONIFER CRT SPOKANE VALLEY, WA 99206-966 Zoning: UR -3.5 Urban Residential 3.5 Water District: Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information:.: Review Building Plan Review Originally Released: Landuse/Zoning/HE Conditions Permits: Released By: --- 5/27/2009 By: tmelbourn Released By --- — — Originally Released: 6/1/2009 By: tschmidt Operator: JD Printed By: JD Print Date: 6/2/2009 Project Number: 09001464 Inv: I Application Date: 6/2/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: TOWN & COUNTRY BLDG Address: 3908 W DAIUN LN CHENEY, WA 99004 Building Permit Firm: TOWN & COUNTRY BLDG CONT Phone: (509) 448-8483 Notes: AS per SVMC 19.40.020 (B) "all residential driveways shall be paved [with an approved] hard surface material." Condition must be met before final inspection. Payment Summary: m0 Permit Tvoe Fee Amount Invoice Amount Amount Paid Amount Owina Building Permit $371.06 $371.06 $73.31 $297.75 $371.06 $371.06 $73.31 $297.75 Disclaimer.- Submittal isclaimer.Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 6/2/2009 This Application: Total Project: Descriotion Grp Type Notes Sa Ft Valuation Sa Ft Valuation POLE BDLG U-1 VB 900 $17,100.00 900 $17,100.00 Totals: 900 $17,100.00 900 $17,100.00 Item Description Units Unit Des c Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $293.25 ACCESSORY PLANS REVIEW 1 SELECT $73.31 WSBCC SURCHARGE I SELECT $4.50 Permit Total Fees: $371.06 Notes: AS per SVMC 19.40.020 (B) "all residential driveways shall be paved [with an approved] hard surface material." Condition must be met before final inspection. Payment Summary: m0 Permit Tvoe Fee Amount Invoice Amount Amount Paid Amount Owina Building Permit $371.06 $371.06 $73.31 $297.75 $371.06 $371.06 $73.31 $297.75 Disclaimer.- Submittal isclaimer.Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 6/2/2009 Permit Center Sp &-e 11707 E Sprague Ave, Suite 106 jy�10;00 Spokane Valley, WA 99206 ey. (509)688-0036 FAX: (509)688-0037 J www.spokanevallev or° Community Development Residential Construction Permit Application ❑ SITE ADDRESS: FA - - t �•r�M 1 New Construction Addition/Remodel Other: ASSESSORS PARCEL NO: y5 3 Z 4, U ill G LEGAL DESCRIPTION: ❑ Accessory Bldg ❑ Deck 5. 1 Lescgoe me scope of work In dea l:Cost of Project: $ 11 9137— to J I Lot moo' X 30' t t-6lzArtE Proposed Use: J **************The Mowing MUST be coraTete: write NIA -if not a livable ************** ******* HEIGHT TO PEAK DIMENSIONS: # OF STORIES: TOTAL HA T BLE SPACE: l7 = 3ox30k,1z I_ .�l.P N/� lI Af%A– N/R� „ F N Nfr as -bums-HLt AREA: 'V ,t1 [FTG: SO.FINIFTG SHED BASEM T GARAG®®.FIGO IL DECK/COV. PATIO SO. FTG: 30% SLOPES ON �G # OF BED OMS: A CONSTRUCTION TYPE: Posr FRAME N HEAT SOU CE: All 4— PROPERTY: SEWER OR SEPTIC? The permftee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the dwelling ishvill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has fission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of a Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Cente . s City of Spok alley Permit is not a permit or approval for any violation of federal, state or local laws, codes oro s. 6 tans r add' ' al information maybe required to be submitted, and subsequently approved before this -application tie s SIGNATURE: DATE: Method of Payment ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 2M5M7 For City Use Only CI F1 OF PLUS Project Number (jci —i4 io� Skpoane Project Address �� (,(✓ Valley..;oO° 11703 E Sprague Ave Suite B-3 * Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 1 permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is CD 'I I I o a The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV 9107 ml y6 3 O PLANNING DEPT. PROVED m ° a �, BY - DATE: / DATE: