Loading...
2008, 07-02 Permit App 08002283 Pit Set Project Number: 08002283 Inv: 1 Application Date: 7/2/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: PIT SET 26 X 52 2008 VALLEY QUALITY HOME Contact: POWERS,TODD&CHRISTINA M Address: 19310 E DOVE CIR C-S-Z: SPOKANE VALLEY,WA 99016 Setbacks: Front Left: Right: Rear: Phone: (509)928-2751 Group Name: Site Information: Project Name: Plat Key: 001407 Name: LABERRY MOBILE PARK ADD District East Parcel Number: 55173.2539 Block: Lot: SiteAddress: 19310 E DOVE CIR Owner:Name: POWERS,TODD&CHRISTINA M Address: 19310 E DOVE CIR Location::CSV SPOKANE VALLEY,WA 99016 Zoning: RMH Water District: Hold: ❑ Area: 11,700 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 7/2/2008 By: JLMain Septic Sys Review Released By: Originally Released: 7/1/2008 By: BGAULKE Landuse/Zoning/HE Conditions Released By: _ Originally Released: 6/17/2008 By: mpalaniuk Permits: ,, :_ �:,r ;,.. .. .. Operator: jmm Printed By: jmm Print Date: 7/2/2008 Project Number: 08002283 Inv: 1 Application Date: 7/2/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Manufactured Home Contractor: BARNES ENTERPRISES INC Finn: BARNES ENTERPRISES INC Address: PO BOX 141617 Phone: (509)921-9068 SPOKANE WA 99214 Item Description Units Unit Desc Fee Amount INSPECTION FEE 2 #SECTIONS $100.00 Permit Total Fees: $100.00 Notes: Okay for 3 bedrooms only. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Manufactured Home $100.00 $100.00 $0.00 $100.00 $100.00 $100.00 $0.00 $100.00 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 7/2/2008 Permit Center rq—I��E® BY cnror 11703 E Sprague Ave, Suite B-3 ',:C PERMIT NUMBER: ' Spokane ; F SPOKANE VALLEY Spokane Valley, WA 99206 PERMIT FEE: ,;0o*Va11ey- (509)688-0036 FAX: (509)688-0037 jUAi .L 2008 w�ww�okanevalley.orc 1`1 Community Development P IT CENTER Manufactured Home Permit Application ❑ OTHER SITE ADDRESS: ! 93i�✓e— /'Gleam �� !/� ��� ASSESSORS PARCEL NO: /7,-, C,53� ' LEGAL DESCRIPTION: Contractor: Name: Address: jy did City: State: Zip:y� Phone: , Fax: Contractor Lic No: Exp Date: City Business Lic. No: Building Owner: Name: Address: City: O State: Zip: Phone: �g Fax: Contact Person Name: j p �10 0�' Phone: 5'09 955 S�7�iZ Describe the scope of work in detail: MANUFACTURED HOME Width:' Length: Year: goal I Pit Set: ye'e' Septic/Sewer: Manufacture: u�11Jtl Previous Address: 7/23 6 S W �- dll !•t/A, 9.F016'�' zero P e y Proposed Use: j ;� �; /X The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signatures Date -���, �C���-- Method of Payment: ❑ Cash Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 8/23/2005 Project Nurhber: 08002283 Inv: I Application Date: 6/13/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information:u.:�..�u:.:; Permit Use: PIT SET 26 X52 2008 VALLEY QUALITY HOME Contact. POWERS, TODD & CHRISTINA M Address: 19310 E DOVE CIR C - S - Z: SPOKANE VALLEY, WA 99016 Setbacks: Front Left: Right: Rear: Phone: (509) 928-2751 Group Name: Project Name Site information: Plat Key: 001407 Name: LABERRY MOBILE PARK ADD District: East Parcel Number: 55173.2539 Block: Lot: SiteAddress: 19310 E DOVE CIR Owner: Name: POWERS, TODD & CHRISTINA M Address: 19310 E DOVE CIR SPOKANE VALLEY, WA 99016 Location:: CSV Zoning: RMH Water District: Hold: ❑ Area: 11,700 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information: Review By: Building Plan Review Released Landuse/Zoning/HE Conditions Released By: Permits:_ ... .., en���: _., k.. - - Manufactured Home — - Contractor: BARNES ENTERPRISES INC Firm: BARNES ENTERPRISES INC Address: PO BOX 141617 Phone: (509) 921-9068 SPOKANE WA 99214 Item Description INSPECTION FEE Units Unit Desc 2 # SECTIONS Permit Total Fees: Fee Amount $100.00 $100.00 Operator: jmm Printed By: jmm Print Date: 6/13/2008 For City Use Only - - CITY PLUS Project Number Project Address pôiine Val l e ° 11703E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 400 OF 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenterCspokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is L,7, \ The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax,email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 -u 0 m o `'7-7' Q D CS) c r CID i N m m co '.J A N c UO -i 0 3 m x m m 70 c n m r , 715'41�c —Y, 4.1 0,5 y Z U /C, - PLANNING DEPT. APPROVED BY:%��urz DATE: 00ile- AW/ev WX 41/ 0 ql L 9i'-41WQ6 12:52PM by cdemuth a. lib V A - T -F V -PY C.AX7 A T T ; 7-n C C 7A WA-Intit a �� le r , WATER LINES s CESSPOOLS * PATROL GRADING s BASEMENT RIGGING a SEPTIC TANKS !.AP.?D ilj, . AND BLACK MPT PLANNING DEPT. APPROVED DATE: &117/2-eng