Loading...
2014, 03-07 Permit App BLD-2014-0411 Residence, GarageSpokane Valley. Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-2540 Fax: (509) 688-0037 per mitcelter sookanevailev.or° (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION 0 ADDITION/REMODELO 0 DECK SITE ADDRESS: 110Z$ 6 D 5 1/w ASSESSORS PARCEL NO.: /of S 3&o%3 LEGAL DESCRI BUILDING OWNER NAME: 1CL(•''i&t4(ti,'iut Lt..p A " - ., NAME: . iw V16,01 arA .4 ivlC- ADDRESS: -PO • 30 CITY: ,SiJo 1 444,44 PHONE:1,j-649 - (tf 3-7U CONTACT NAME: P ettii'� �GW 1�4G�►y 'PHONE: - tc.t 3 ? STATE: [ ACCESSORY BUILDING FAx("SU-i I Gt z / - �lCGC� j ON: P1AR 0720ik (. \/ ;MIT CENTER SUB I f F l CELL: ()O) 1fL% - 1,77 Fax: TT,t- 2c(_("iti;5; CONTRACTOR NAME: i\Jt 1w - 1a,k/A MAILING ADDRESS: PO �� l �{ (J t ) ;j (-SQL I ei 3 - /Y CITY: PHONE: CONTRACTOR LICENSE NO.: A K iG }-! 141Gl 4 J i� K EXPIRES: �j-- i 3 - (y' CITY BUSINESS LICENSE NO.: I i ZLU D-rae, 4, 41 etc DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: STATE: (AJ)4 FAX{6U6/1 2 -76, l cELL: 5 4 7 CELL: ZIP: `I1Z, 664-) ;t f - 15 7( ****YOU MUST COMPLETE THE FOLLOWING**** MARK N A IF NOT APPLICABLE Height to Peak:1 ,2„ Main Floor SQ FT: Garage SQ FT: 3°Pr SQFT Dimensions: WO ' x58 Upper Floor SQ FT: /OM Deck/Covered Patio SQ FT: --tg sa No. of Stories: Total Habitable Rn richer Space: t Z5g,SQ Fr Unfinished Basement SQ FT: iYA Impervious Surface Area: 3(. c2 262 f No. of Bedrooms: 3 Construction Type: Pet.) TOTAL COST OF PROJECT: $ Finished Basement SQ FT: AV 30% S opes on Property: Heat Source: b2CaA are Sewer or Septic: Seer The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/willDISCLAIMER be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of a permit or approval for any violation of federal, state or local laws, codes or iSokane nformation ire ggttto be submitted and subsequently approved before this application can be proces ed antes. 6) Plans or additional may bired Date: `31-3 1I L( Signatur Updated 1-11-11 http: //www.spoka nevalley.org/filestorage/124/938/210/948/ 1496/2743/Res_Permit.doc Page 1 of 1 Target Date sheet SpaTblane Valleyo For City Use Only PLUS Project Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Ca11 staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD-003 V-7/ 06-21-11 Page 1 of 1 SPow Co1Nn' (/SGCportalPROD/Public/Home) Sign Up (/SGCportaIPROD/Register/RegisterUser) or Log In (/SI Map (/SGCportalPROD/Maps/Map/Index?_mapFilter=Jur%3dco-SpokaneCounty-wa%7cTyr 3dW3sia2V5IjoiSWQiLCJvcCI61jOiLCJ2YWwiOiJkN2NhNDU0YS1 hMjc1 LTQwNDEtODFjMS1 hl1 Contact(mailto:bphelp@spokanecounty.org?subject=[Permit %23SW-14000145]) SW-14000145 Sewer Address: 17025 E DESCHUTES LN SPOKANE VALLEY, WA 99016 Parcel #: 45124.0606 Project: SEWER CONNECTION Status: Sewer permit has been issued. Submitted:3/12/2014 Approved:3/12/2014 Issued:3/13/2014 Closed:3/13/2014 Expires:3/13/2015 Inspections: Required:0 Complete:0 Contacts TO PRINT A STATUS REPORT FOR THIS PROJECT, FIRST HAVE YOUR PROJECT NUMBE THE COUNTY LOGO, SCROLL TO THE BOTTOM OF THE SCREEN, CLICK REPORTS, CHC STATUS' REPORT, AND ENTER THE PROJECT NUMBER. (IF THE REPORT DOESN'T DISF 'COMPATIBILITY VIEW SETTINGS ARE TURNED ON. YOU CAN TURN IT OFF BY CLICKIN( 'COMPATIBILITY VIEW SETTINGS' > AND UNCHECK ALL BOXES. NOW YOUR REPORT Wi Contractors APPLICANT: MARKHAM HOMES INC OWNER: KDGRA LLC Project # GENERAL: MARKHAM -TOMES INCH E C E j V E D License #: NARKHHI971n 1 3 2014ti"" CSV PERMIT CENTER SUB # Fri REV. # I Parcels Parcel Owner 45124.0606 (/SGCportaIPROD/Parcels/ParcelDetail/Index/a05e98c8-2323-4912- KDGRA acc3-a27d00738389) LLC Submittals Submittal Required Received Application Form No 3/12/2014 Approval Steps Below you will find the status of the project application. Each of these steps need to be complete be finalized and either a permit issued, or the project can be approved. Please contact us for cia the Description includes "Migrated from PLUS". 1) "In Queue" means the application has been r the review steps have been identified. 2) When one of the steps are "In Review", that means a r the paperwork and has begun their review. 3) "Revisions Requested" means the agency has ide application that need to be received before they can finalize their review. 4) Once a step has bet that agency has finished their review and no further action is required on the applicant's part. Step Utilities Sewer Status Date Complete 3/12/21 Fixtures Fixture Quantity Per Unit Sewer Connections 1 $125.00 Fees Fee Utilities Permit Processing - Utilities Total: Conditions SEWER FERMI I S. ARE VALID FOR ONE (1) YEAR FROM I HE DA I E OF ISSUANCE. FOR CALL THE Ul IES DEPT AT (509) 477-3604 FROM £ 5:00 MONDAY-FRIDAY PRIOR T DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAI APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTEC BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCA ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SH[ TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHE BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIV EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPC REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DE INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. 11 25 De5d) / te-(s PLANNING DEPT. APPROVED BY. DATE: N SDI 7 6'-10" 3- O 0 1- 41. 1 LOT = () 000 sQ CRAWL SF 1 50 FT 150 E VENTS R EVERY FT OF G.5. L L r — J SLAB ON GRADE CRAWL SPACE -,4" SLAB OVER 6 MIL VAPOR BARRIER -,4" CO113PACT GRAVEL BASE -,VENT SLAB FOR RADON (pw7 5J -, 18" MIN BTM OF JOISTS TO GRADE -, 6 MIL VAPOR BARRIER •, ALL WOOD IN CONTACT WPITI CONC TO BE PRESSURE TREATED -, INSULATE TO MIN R-:30 @ JOISTS -, PROVIDE RADON MITIGATION 2'k4" WD STUD BEARING FALL OVER 12"X6" CONT. FTC. TYP. PROVIDE 18",Q4" MIN OPENING AT EACH WALL 6' FDN WALL 17W CONT. FTG.-- L J L L U_NF(CAVATED FOlt(3ARAG}E -1 4" CONC. SLAB; GRADE -, 6 MIL POLY Ve 'OR BARRIER UNDER SLAB ON OE_kDE -, SLOPE SLAB TOWARD OVI:RI]EAD DOORS HOLD DOWN FND MALL FOR SLAB OVER GARAGE DOORS .7L L UTILITY EASEMENT PRIVATE ROAD DESHU'rES LANE 1 0�1 —J J N '9 Project iat,P4101 RECEIVED MAR 0 7 2014 CSV PERMIT CENTER SUB#j fl REV.# l > Markham Homes Inc LOT: 6 BLOCK: 3 OEV: 2/27/14 � J� t�A 01 S . . U o ky MARKHAM HOMES INC. P.O. BOX 610 LIBERTY LAKE WA. 99019 TELEPHONE (509) 927-1437 PAGE ESCRIPTION Marketing Plan