2014, 03-07 Permit App BLD-2014-0411 Residence, GarageSpokane
Valley.
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-2540
Fax: (509) 688-0037
per mitcelter sookanevailev.or°
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION 0 ADDITION/REMODELO
0 DECK
SITE ADDRESS: 110Z$ 6 D 5 1/w
ASSESSORS PARCEL NO.: /of S 3&o%3 LEGAL DESCRI
BUILDING OWNER NAME: 1CL(•''i&t4(ti,'iut Lt..p A " - .,
NAME:
. iw V16,01 arA .4 ivlC-
ADDRESS: -PO • 30
CITY: ,SiJo 1 444,44
PHONE:1,j-649 - (tf 3-7U
CONTACT NAME: P ettii'� �GW 1�4G�►y
'PHONE: - tc.t 3 ?
STATE:
[ ACCESSORY BUILDING
FAx("SU-i I Gt z / - �lCGC� j
ON:
P1AR 0720ik
(. \/ ;MIT CENTER
SUB
I f F l
CELL: ()O) 1fL% - 1,77
Fax: TT,t- 2c(_("iti;5;
CONTRACTOR NAME: i\Jt 1w - 1a,k/A
MAILING ADDRESS: PO �� l �{ (J t )
;j
(-SQL I ei 3 - /Y
CITY:
PHONE: CONTRACTOR LICENSE NO.: A K iG }-! 141Gl 4 J i� K EXPIRES: �j-- i 3 - (y' CITY BUSINESS LICENSE NO.: I i ZLU D-rae, 4, 41 etc
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
STATE: (AJ)4
FAX{6U6/1 2 -76, l
cELL: 5 4 7
CELL:
ZIP: `I1Z,
664-) ;t f - 15 7(
****YOU MUST COMPLETE THE FOLLOWING****
MARK N A IF NOT APPLICABLE
Height to Peak:1 ,2„
Main Floor SQ FT:
Garage SQ FT:
3°Pr SQFT
Dimensions: WO ' x58
Upper Floor SQ FT:
/OM
Deck/Covered Patio SQ
FT: --tg sa
No. of Stories: Total Habitable
Rn richer Space: t Z5g,SQ Fr
Unfinished Basement SQ
FT: iYA
Impervious Surface
Area: 3(. c2 262 f
No. of Bedrooms: 3
Construction Type: Pet.)
TOTAL COST OF PROJECT: $
Finished Basement SQ
FT: AV
30% S opes on
Property:
Heat Source: b2CaA are Sewer or Septic: Seer
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/willDISCLAIMER
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
a permit or approval for any violation of federal, state or local laws, codes or
iSokane nformation ire ggttto be submitted and subsequently approved before this application can be proces ed antes. 6) Plans or additional
may bired
Date: `31-3 1I L(
Signatur
Updated 1-11-11
http: //www.spoka nevalley.org/filestorage/124/938/210/948/ 1496/2743/Res_Permit.doc
Page 1 of 1
Target Date sheet
SpaTblane
Valleyo
For City Use Only
PLUS Project
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Ca11 staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD-003 V-7/ 06-21-11 Page 1 of 1
SPow Co1Nn'
(/SGCportalPROD/Public/Home) Sign Up (/SGCportaIPROD/Register/RegisterUser) or Log In (/SI
Map (/SGCportalPROD/Maps/Map/Index?_mapFilter=Jur%3dco-SpokaneCounty-wa%7cTyr
3dW3sia2V5IjoiSWQiLCJvcCI61jOiLCJ2YWwiOiJkN2NhNDU0YS1 hMjc1 LTQwNDEtODFjMS1 hl1
Contact(mailto:bphelp@spokanecounty.org?subject=[Permit %23SW-14000145])
SW-14000145 Sewer
Address:
17025 E
DESCHUTES LN
SPOKANE VALLEY,
WA 99016
Parcel #: 45124.0606
Project:
SEWER CONNECTION
Status:
Sewer
permit
has been
issued.
Submitted:3/12/2014
Approved:3/12/2014
Issued:3/13/2014
Closed:3/13/2014
Expires:3/13/2015
Inspections:
Required:0
Complete:0
Contacts
TO PRINT A STATUS REPORT FOR THIS PROJECT, FIRST HAVE YOUR PROJECT NUMBE
THE COUNTY LOGO, SCROLL TO THE BOTTOM OF THE SCREEN, CLICK REPORTS, CHC
STATUS' REPORT, AND ENTER THE PROJECT NUMBER. (IF THE REPORT DOESN'T DISF
'COMPATIBILITY VIEW SETTINGS ARE TURNED ON. YOU CAN TURN IT OFF BY CLICKIN(
'COMPATIBILITY VIEW SETTINGS' > AND UNCHECK ALL BOXES. NOW YOUR REPORT Wi
Contractors
APPLICANT: MARKHAM HOMES INC
OWNER: KDGRA LLC
Project #
GENERAL: MARKHAM -TOMES INCH E C E j V E D
License #: NARKHHI971n 1 3 2014ti""
CSV PERMIT CENTER
SUB # Fri REV. #
I
Parcels
Parcel Owner
45124.0606 (/SGCportaIPROD/Parcels/ParcelDetail/Index/a05e98c8-2323-4912- KDGRA
acc3-a27d00738389) LLC
Submittals
Submittal Required Received
Application Form No 3/12/2014
Approval Steps
Below you will find the status of the project application. Each of these steps need to be complete
be finalized and either a permit issued, or the project can be approved. Please contact us for cia
the Description includes "Migrated from PLUS". 1) "In Queue" means the application has been r
the review steps have been identified. 2) When one of the steps are "In Review", that means a r
the paperwork and has begun their review. 3) "Revisions Requested" means the agency has ide
application that need to be received before they can finalize their review. 4) Once a step has bet
that agency has finished their review and no further action is required on the applicant's part.
Step
Utilities Sewer
Status Date
Complete 3/12/21
Fixtures
Fixture Quantity Per Unit
Sewer Connections 1 $125.00
Fees
Fee
Utilities Permit
Processing - Utilities
Total:
Conditions
SEWER FERMI I S. ARE VALID FOR ONE (1) YEAR FROM I HE DA I E OF ISSUANCE. FOR
CALL THE Ul IES DEPT AT (509) 477-3604 FROM £ 5:00 MONDAY-FRIDAY PRIOR T
DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAI
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTEC
BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCA
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION
HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SH[
TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHE
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIV
EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPC
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DE
INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY.
11 25 De5d) / te-(s
PLANNING DEPT. APPROVED
BY.
DATE:
N
SDI 7
6'-10"
3-
O
0
1-
41.
1
LOT = () 000 sQ
CRAWL SF
1 50 FT
150
E VENTS
R EVERY
FT OF G.5.
L
L
r
— J
SLAB ON GRADE CRAWL SPACE
-,4" SLAB OVER 6
MIL VAPOR BARRIER
-,4" CO113PACT
GRAVEL BASE
-,VENT SLAB
FOR RADON
(pw7
5J
-, 18" MIN BTM OF
JOISTS TO GRADE
-, 6 MIL VAPOR BARRIER
•, ALL WOOD IN CONTACT WPITI
CONC TO BE PRESSURE TREATED
-, INSULATE TO MIN R-:30 @ JOISTS
-, PROVIDE RADON MITIGATION
2'k4" WD STUD BEARING FALL
OVER 12"X6" CONT. FTC. TYP.
PROVIDE 18",Q4" MIN OPENING
AT EACH WALL
6' FDN WALL
17W CONT. FTG.--
L
J
L
L
U_NF(CAVATED
FOlt(3ARAG}E
-1 4" CONC. SLAB; GRADE
-, 6 MIL POLY Ve 'OR BARRIER
UNDER SLAB ON OE_kDE
-, SLOPE SLAB TOWARD
OVI:RI]EAD DOORS
HOLD DOWN FND MALL FOR
SLAB OVER GARAGE DOORS
.7L L
UTILITY EASEMENT
PRIVATE ROAD
DESHU'rES LANE
1
0�1
—J
J
N
'9
Project iat,P4101
RECEIVED
MAR 0 7 2014
CSV PERMIT CENTER
SUB#j fl REV.#
l
>
Markham
Homes
Inc
LOT: 6
BLOCK: 3
OEV: 2/27/14
� J�
t�A
01
S . .
U o
ky
MARKHAM HOMES INC.
P.O. BOX 610 LIBERTY LAKE WA. 99019
TELEPHONE (509) 927-1437
PAGE ESCRIPTION
Marketing Plan