Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2010, 03-04 Permit App 1000508 Garage
Project Number: 10000508 Inv: I Application Date: 3/4/2010 Page I of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: GARAGE ADDITION - ATTACHED TO HOUSE Contact: COZZA FRAMING INC Address: 708 E PACIFIC AVE C - S - Z: SPOKANE WA 99202 Setbacks: Front Left: Right: Rear: Phone: (509) 232-2468 Group Name: Site Information: Project Name: Plat Key: CONV Name: CONVERTED CNTY DATA District: Nort Parcel Number. 45171.1409 Block: Lot: SiteAddress: 10305 E DESMET AVE Owner: Name: FUHER M/BOYER A Address: 10305 E DESMET AVE Location:: CSV SPOKANE VALLEY, WA 99206-390 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: ❑ Area: 11,740 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 10 Review Information: Review Building Plan Review Originally Released: Landuse/Zoning/IIE Conditions See conditions Permits: Originally Released: Released By: 3/3/2010 By: tmelbourn Released By: 2/24/2010 By: kkendall Operator: jmm Printed By: JD Print Date: 3/4/2010 ProjectNumber: 10000508 Inv: 1 Application Date: 3/4/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Perms[ Contractor. COZZA FRAMING INC Firm: COZZA FRAMING INC Address: 708 E PACIFIC AVE Phone: (509) 232-2468 SPOKANE WA 99202 This Application: Total Project: Description Gm Tvve Notes Sci Ft Valuation Sa Ft Valuation GAR WOOD U-1 VB PLAN 1,631 $30,989.00 1,631 $30,989.00 REVIEW FEE Totals: 1,631 $30,989.00 1,631 $30,989.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $451.85 WSBCC SURCHARGE 1 SELECT $4.50 SF PINS RV W < 7999 SQ FT 1 SELECT $180.74 Permit Total Fees: $637.09 Notes: The garage addition (Permit # 10-000508) shall be restricted to personal residential use. Any business use or accessory dwelling unit shall be prohibited until completion of a change of use and building permit review. Pursuant to Title 19.40 of the SVMC all residential driveways are required to be of a hard surface (asphalt, concrete or grasscrete). All new driveways for addition are required to be paved. Payment Summary: Permit Tvce Fee Amount Invoice Amount Amount Paid Amount Owine Building Permit $637.09 $637.09 $164.58 $472.51 $637.09 $637.09 $164.58 $472.51 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator. jmm Printed By: JD Print Date: 3/4/2010 Permit Center B-3 PERMIT NUMBER:/cv5 11703 E Sprague!n. ei[aY1gA 9920 PERMIT FEE: Jn1Ri� ex rcnV uu_nnz� Community De lopment .I 2019 Residenti l Cons ❑ New Construction ❑ Accessory Bldg Permit A cea io Addition/Remodel ❑ Deck `] Other: SITE ADDRESS: I (7 3fi ✓iJ�F� ASSESSORS PARCEL NO: q 5 �—I ITII LEGAL DESCRIPTION Building Owner: DIMENSIONS: L Contractor: Name: — Name: Address: Address: City: tate: Zip: IMPERVIOUS SURFACE City: State: Zip: Phone: Fax: Phone: Fax: FINISHED BAS MENT Contractor Lic No: Exp Date: Contact Person City Business Lic. No: Name: 1 Phone: — PROPERTY: Describe the scope of work in detail: Proposed Use: Cost of Project: $ **************The following MUST be comDlete: (write N/A if not aDDlicable)********************** HEIGHT TO PEAK: r/ DIMENSIONS: L # OF STO IES: TOTAL ITABLE SPACE: — 1 MAIN FLOOR TO SQ. 2 FLOG SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: II"J�R /11 � 115O REA: / FINISHED BAS MENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: �Afl PROPERTY: # OF BED OOM CONSTRUC ION TYP : HEATURCE: SEWER OR SEPTIC? EJ SF—W V5 e— The permitee verges, acknowledges and agrees by their signature that: t) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: f�_�, DATE: Method of Payment: ❑ Cash ❑ Check ❑ Mastercard Bankcard #: Expires: Authorized Signature: REVISED Y IM7 Z%/l0 No D6(�WY ` I 4�t�RaA c G� ❑ VISA d T VIN#: '� RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. D SITE PLAN o Property lines and dimensions D Setbacks to property lines D Direction arrow pointing North and orientation to streets o Distance between buildings D Proposed/existing buildings (footprint and dimensions) D Right of way/easement location & sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes D Crawlspace ventilation D Supporting wood cripple walls or beams D Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: D Floor Joist direction, size and spacing D Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations D Exhaust fan locations D Deck or concrete patio sizes and locations 0 Roof Plan: o Engineered truss direction and spacing D Rafter and over frame direction, size and spacing D Wall Section Detail including: Roof ❑ Window and door location and sizes E3 Window well locations if applicable o Room usage labels D Smoke detector locations o Attic and crawl space access locations D Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location D Slope/ roofing material/ underlayment/ ice dam protection D Truss or rafter size, spacing & connection D Sheathing size and type D Attic insulation/ air space baffle/ ventilation Ceiling D Joist size and spacing o Size of ceiling gypsum wall board Wall D Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width D Earth to wood separation distance Footing D Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions D Floor Joist/ decking direction, size and spacing o Siding/ exterior house wrap/ anchor bolts D Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth D Horizontal & vertical reinforcement if any D Reinforcement if any o Active system with 6 mil vapor barrier D Footings/ post/ and beam size and locations 0 Stairway tread rise & run and nosing 0 Handrail / Guard height & spacing CIiYMkne ,,;oOValley For City Use Only PLUS Project Number 0 Project Address /©3OS /tom 11703 E Sprague Ave Suite B-3 1 Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised tlar t date. Your application review TARGET DATE is o�/� The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from. us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07 C 11 SITE PLAN AlSCALE: 135'-0" 15'-0" El LO EXISTING FENCE ,' EXISTING COVERED PATIO EXISTING GARAGE X101M N 20'-0" fl GRAVEL DRIVE EXISTING HOUSE Al PLANTER <! Al PROPERTY LINE 19'-6" EXISTING DRIVEWAY 4 NEW DRIVEWAY ADDITION SETBACK LINES EXISTING 19'-6" 15-0" DESMET 3 CO1 - I 00 M MWIMUM Al- ARCHITECTURAL SITE PLAN A2- FLOOR PLAN / FOUNDATION PLAN A3- ROOF / FRAMING PLAN A4- EXTERIOR ELEVATIONS A5- EXTERIOR ELEVATIONS A6- SECTION A7- DETAILS a- PERSPECTIVES -PLANNING DEPT PROVED 5t-0" BY DATE:- 0 C) CSV PLANNING DIVISION CONDITION Pursuant to Title 19.40 of the SVIVIC all residential driveways are required to be of a hard surface(asp halt, concrete or grasscrete). All new driveways for addition are required to be paved. CSV PLANNING bIVISION CONI)ITION The garage addition (Permit 10-0508) shall be restricted to personal residential use. Any business use or accessory dwelling unit shall be prohibited until completion of a change of use and building permit review. 4 RECEIVED CSV PERMIT CENTER FEB 2 2010 Su bmitta 1.1 A