2010, 02-25 Permit App 10000493 Pole BldgProject Number: 10000493 Inv: I Application Date: 2/25/2010 Pagel of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: 24 X 40 POLE BLDG
Setbacks: Front Left:
Contact: BUNKER STEEL BLDGS INC
Address: 1028 W ROSEWOOD AVE
C - S - Z: SPOKANE WA 99208
Right: Rear: Phone: (509) 468-8182
Group Name:
Site Information: Project Name:
'41t
Plat Key: 001838 Name: OPPORTUNITY TR # 01-354 District: Nort
Parcel Number: 45152.1408 Block: Lot:
SiteAddress: 12423 E DESMET AVE Owner: Name: POHLE, JAMES J & KERRIEK
Address: 12423 E DESMET AVE
Location:: CSV SPOKANE VALLEY, WA 99216-092
Zoning: R-3 SF Res District
Water District: 011 MODERN Hold: ❑
Area: 16,890 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 40
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Originally Released:
Land use/Zoning/HE Conditions
Originally Released:
Permits:
Released By:
2/25/2010 By: tmelhourn
Released By:
2/23/2010 By: cjjanssen
Operator. jmm Printed By: JD Print Date:
2/25/2010
Project Number: 10000493 Inv: I Application Date: 2/25/20I0 Page 2 of 2
TMS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor. BUNKER STEEL BUILDINGS
Address: 1028 W ROSEWOOD
SPOKANE, WA
Description Grp Type Notes
POLE BDLG U-1 VB PLAN
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes:
Pavment Summary:
Permit Type
Building Permit
Banding Perm}t
Firm: BUNKER STEEL BUILDINGS
Phone: (509)468-8182
This Application:
Sa Ft Valuation
960 $18,240.00
Totals:
960 $18,240.00
Units
Unit Desc
1
SELECT
1
SELECT
1
SELECT
Permit Total Fees:
Fee Amount Invoice Amount
$388.56 $388.56
$388.56 $388.56
Total Project:
Sa Ft Valuation
960 $18,240.00
960 $18,240.00
Fee Amount
$307.25
$76.81
$4.50
$388.56
Amount Paid
Amount Owine
$76.81
$311.75
$76.81
$311.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 2/25/2010
Permit Center
1170r88-0036
rague Ave S ' PERMIT NUMBER• (�
jUe Py PERMIT F
alley° (509) 9j 88ERwwwn MIT CCommunity Development
Residential Construn KOB as New C nstruction ❑ Accessory Bldg
Permit Application Proied# dition/Be odel ❑ Deck ❑ Other:
't�yT7fl -
l+�>3 ubmi
SITE ADDRESS: ob � S�k�r`a `r`'' � ki
ASSESSORS PARCEL NO: S 1 S Z . OY LEGAL DESCRIPTION
Building Owner:
Name: 1 M J t'w
Address: S,A (V" -E
City: State: /ip:
Phone: ':� Z _ 0 S-73 Fax:
Contact Person
Name: i^ 2R
Phone: q b $' 6 1
Describe the scope of work in detail:
�rec•t a e�'-1 �CLIV'x to
Proposed Use: DC ec GkirOLAP,
Contractor: �.nKeR
SIQeL i3�d S itrs
Name:
TOTAL HABITABLE SPACE:
Address:101g
2 FLOOR SQ. FTG:
City: Set)
State: uI zip:a�A1JJ
Phone: y6 S- `a 13..)
`y
Fax:
ntract r is o: SS f�F Exp Date:3 I//
City Business Lic. No:
FINISHED BASEMENT
Cost of Project: $ (6rQoo
**************The followiniz MUST be complete: (write N/A if not
HEIGHT TO PEAK: 'q
DIMENSIONS '
# OF STORIES: I
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
_
—
AREA:
FINISHED BASEMENT
GAR,&GQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG: I
U �
—
I P TY: Nv
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE: (_TSEWF.RZR
SEPTIC?
V
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additionalinfo9Lon may be required to be submitted, and subsequently approved before
this application can be processpQ �'�
SIGNATURE: Pte/ DATE:X -2
Method of P
❑ Cash
Bankcard #:
Authorized Signature:
❑ Check ❑ Mastercard ❑ VISA
Expires: VIN#:
Effective 10-28-07
Page I of 1
6e...1/.....�,�e..�Le�..,d1.., n.n/..NnnAn l!`nw........:«. Il-.�.L._........m......�...-.. m,._._m..:u:__m __:, _..:.. ....:. .:... .... .. .
For City Use Only
PLUS Project Number /0 CJS
SpCITYokane Project Address
Va11ey,,;00*®
11703 E Sprague Ave Suite B-3 * Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
c
Your application review TARGET DATE is /
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07
kap w+� �1i6
oe
I oo' +i
a� 10'+
PLANNING DEPT. APPROVED
-F-
X0
�wse
� h1�C N �
CSV F
2
iOct
o
�r-
u stat
S#�� ..