Loading...
2007, 09-21 Permit 07002749 Transmittal, Emails re DrainageSpokanecm •••••IPValley Development Engineering 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Letter of Transmittal Date: September 21, 2007 To: Mr. Vasiliy Sichkar 1522 W. Shannon Spokane, WA 99205 From: Henry M. Allen Development Engineering RE: 2315 S Dusk Ct - 07002749 - Sichkar Lot Drainage Plan We are sending to you — ® Attached n Under separate cover via: the following: ITEM # COPIES DESCRIPTION 1 1 Email to Greg Miller 2 1 Email to Grant Cummings 3 4 These are sent for the purpose(s) checked below: ❑ For approval ❑ For your use ❑ As requested ❑ For review and comment ❑ Other Comments: ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Confidential Hi, These are copies of the emails I sent requesting additional investigation and also assistance from the Geotech Engineer (Mr. Cummings). Henry cc: Spokane Valley Building Department - Permit Center Spokane Valley Development Engineering — Project File Page 1 of 1 Henry Allen From: Henry Allen Sent: Thursday, September 13, 2007 11:25 AM To: 'Greg Miller' Cc: Mary Kate Martin; John Hohman; 'grant@cgeotech.com' Subject: Dusk Ct S 2315 - 07002749 - Sichkar Drainage: Hi Greg, Just to reiterate what we just discussed on the phone — 1) We met with Mr. Sichkar this morning and received permission to contact you. 2) Due to the specialized nature of the drainage design, we will be requesting that Mr. Cummings (the Geotech Engineer) also review the Drainage Plan and perform construction inspections. 3) Because the trench drain will be intercepting ground water flow that was probably originally seeping downhill past the detention basin and the drain will then reroute this additional flow into the detention pond, the increase in flow to the pond needs to be estimated and then the pond operation needs to be evaluated to determine if this groundwater will cause the pond not to function as designed and if the additional flow will increase the discharge leaving the pond. Though we did not discuss this on the phone but if the pond does not have capacity and/or the flow leaving the pond increases then modifications may need to be designed and constructed to mitigate the impact. Thank you, Henry M. Allen P.E. Development Engineer City of Spokane Valley 11707 E. Sprague Ave., Ste. 106 Spokane Valley, WA 99206 (509) 688-0174 (509) 921-1008 Fax hallenspokanevalley.org (Contents of this email and any reply are subject to public disclosure.) 9/13/2007 Page 1 of 1 Henry Allen From: Henry Allen Sent: Thursday, September 13, 2007 12:51 PM To: 'grant@cgeotech.com' Cc: Mary Kate Martin; John Hohman; 'Greg Miller' Subject: Dusk Ct S 2315 - 07002749 - Sichkar Drainage: Geotech Assistance Hi Mr. Cummings, I left you a voice message on your phone. We met with Mr. Sichkar this morning and received permission to contact you. We have concerns with the water conditions on his property and so are requesting the following: A) Due to the specialized nature of the drainage design we need you to — 1) Review the Drainage Plan submittals until they are approved, and, 2) To inspect the foundation construction including what has already been constructed and what has yet to be constructed to make sure it meets the recommendations you provided in a November 2, 2006 letter to Mr. Sichkar. Once you are satisfied with the construction, please send me a letter stating this. B) To assist the design Engineer in evaluating the amount of groundwater flow going to the pond prior to the installation of the trench (curtain) drain and after the installation of the drain. C) During a site visit we observed that there has been some grading of the site beyond which you may have observed during your site visit. The grading has exposed what appears to be at least 4 to 5 feet of clayey silt. Is this the decomposed granite you referred to? If not, please take another look at the soils to confirm that they still match your site observations including the type and thickness. Thank you for your assistance, Henry M. Allen P.E. Development Engineer City of Spokane Valley 11707 E. Sprague Ave., Ste. 106 Spokane Valley, WA 99206 (509) 688-0174 (509) 921-1008 Fax hallenspok_anevalley,org (Contents of this email and any reply are subject to public disclosure.) 9/13/2007