2009, 08-26 Permit App 09002531 Residence, Sewer Project Number: 09002531 Inv: 1 Application Date: 8/26/2009 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW SFR-SEWER Contact: MARKHAM HOMES INC
Address: PO BOX 610
C-S-Z: LIBERTY LAKE,WA 99019
Setbacks:Front Left: Right: Rear: Phone: (509)927-1437
Group Name:
Site Information: Project Name:
Plat Key: Name: SHP-20-03 District: Nort
Parcel Number: 35121.0216 Block: Lot:
SiteAddress: 7320 E EUCLID AVE Owner:Name: GENSHORCK,DONNA PATRICE
Address: 1016 S HARMONY RD
Location::CSV SPOKANE VALLEY,WA 99016
Zoning: R-2 SF Res Suburban District
Water District: 002 ORCHARD AVENUE Hold: ❑
Area: 9,515 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: masw, v a; ;,-z.: r ,
Review
Building Plan Review Released By:
Originally Released: 8/17/2009 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 8/26/2009 By: CJJANSSE
Sewer Review Released By:
Permits: o 4
Operator: jmm Printed By: jmm Print Date: 8/26/2009
Project Number: 09002531 Inv: 1 • Application Date: 8/26/2009 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: MARKHAM HOMES INC Firm: MARKHAM HOMES INC
Address: 2510 N.PINES,SUITE 203 Phone: (509)927-1437
SPOKANE,WA 99206
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB 1,334 $129,171.22 1,334 $129,171.22
COV DECK R-3 VB 58 $870.00 58 $870.00
GARAGE U-1 VB 709 $13,471.00 709 $13,471.00
Totals: 2,101 $143,512.22 2,101 $143,512.22
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $1,240.15
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $496.06
Permit Total Fees: $1,740.71
Mechanical Permit
Contractor: MARKHAM HOMES INC Firm: MARKHAM HOMES INC
Address: 2510 N.PINES,SUITE 203 Phone: (509)927-1437
SPOKANE,WA 99206
Item Description Units Unit Desc Fee Amount
DUCT WORK SYSTEM 4 NUMBER OF $44.00
GAS WATER HEATER 1 NUMBER OF $11.00
GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00
GAS PIPING 3 #OF UNITS $3.00
HEAT PUMP OR A/C 0-3 TONS 1 NUMBER OF $13.00
CLOTHES DRYER 1 NUMBER OF $10.00
RANGE 1 NUMBER OF $10.00
GAS LOG OR GAS INSERT 1 NUMBER OF $11.00
HOOD-TYPE II 2 NUMBER OF $22.00
Permit Total Fees: $137.00
Operator: jmm Printed By: jmm Print Date: 8/26/2009
Project Number: 09002531 Inv: 1 Application Date: 8/26/2009 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Plumbing Permit
Contractor: MARKHAM HOMES INC Firm: MARKHAM HOMES INC
Address: 2510 N.PINES,SUITE 203 Phone: (509)927-1437
SPOKANE,WA 99206
Item Description Units Unit Desc Fee Amount
TOILETS/BIDETS 3 NUMBER OF $18.00
SINKS 4 NUMBER OF $24.00
SHOWERS 1 NUMBER OF $6.00
TUBS 2 NUMBER OF $12.00
DISH WASHERS 1 NUMBER OF $6.00
GARBAGE DISPOSAL 1 NUMBER OF $6.00
CLOTHES WASHER 1 NUMBER OF $6.00
FLOOR DRAINS 1 NUMBER OF $6.00
MISCELLANEOUS FIXTURES 1 NUMBER OF $6.00
Permit Total Fees: $90.00
7222 E UTAH AVE--PROPERTY MUST BE DIVIDED TO ADD THE RESIDENCE IN THE SHOP.
THE EXISTING SHOP CAN BE EXPANDED TO A MAXIMUM OF 1,029 SF.
Payment Summary: . 2. , .,.;;,£ ,. ..s. : .-
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $1,740.71 $1,740.71 $473.66 $1,267.05
Mechanical Permit $137.00 $137.00 $0.00 $137.00
Plumbing Permit $90.00 $90.00 $0.00 $90.00
$1,967.71 $1,967.71 $473.66 $1,494.05
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 8/26/2009
sokane (Staff Use Only)
PERMIT NUMBER:
Valley k PERMIT FEE:
CITY OF SPOKANE VALLEY RECEIVED BY
Community Development Department CITY OF SPOKANE VALLEY
Permit Center
11703 East Sprague Avenue, Suite B-3 AUG 2009
Spokane Valley, WA 99206
Tel: (509) 688 0036 P IT CENTER
Fax: (509) 688-0037 BY•
permitcenter@spokanevalley.orq
RESIDENTIAL CONSTRUCT ON PERMIT APPLICATION
El NEW CONSTRUCTION Q ADDITION/REMODEL (❑ ACCESSORY BUILDING
Ej DECK ❑ OTHER
SITE ADDRESS: 7320 E EUCLID AVE, SPOKANE VALLEY WA 99212
ASSESSORS PARCEL NO.: 35121.0216 LEGAL DESCRIPTION: ORCHARD AVENUE ADDITION
BUILDING OWNER NAME: SAME AS CONTRACTOR
NAME:
ADDRESS:
CITY: STATE: ZIP:
PHONE: FAX: CELL:
CONTACT NAME:
PHONE: FAX: CELL:
CONTRACTOR NAME: MARKHAM HOMES INC.
MAILING ADDRESS: P.O. Box 610
CITY: LIBERTY LAKE STATE: WA ZIP: 99019
PHONE: (509) 927-1437 FAX: (509)927-2816 CELL: (509)217-7840
CONTRACTOR LICENSE No.: MARKHH1971 DK EXPIRES: 3/12/2011 CITY BUSINESS LICENSE NO.: 602 277 533
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
NEW SINGLE FAMILY RESIDENCE
PROPOSED USE:
NEW SINGLE FAMILY RESIDENCE
Effective October 28, 2007 Page 1 of 2
F:\Tracking\Customs\7320 Euclid\7320 Euclid Residential Construction Permit App.l.doc
9 =v 3/
•
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: Dimensions: No. of Stories: Total Habitable
15'6-3/4" 59'x 47' 1 Space: 12&TSF/,j'341
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement Finished Basement
1-231 d 3 N/A SQ FT: N/A SQ FT: N/A
Garage SQ FT: Dec Covered Patio Impervious Surface 30% Slopes on
SQ F A!/A Area: 2038 SF Property: NONE
No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic:
2 STICK FRAME GAS SEWER
TOTAL COST OF PROJECT: $130,000.00
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be su it ed and subsequently approved before this application can be processed.
Signature Date: AUGUST 14, 2009
Method of payment: ❑ Cash ❑ Check ❑ Visa ❑ Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
F:\Tracking\Customs\7320 Euclid\7320 Euclid Residential Construction Permit App.l.doc
Permit Center
11703 E Sprague Ave,Suite B-3
riQil Spokane Valley,WA 99206 PERMIT NUMBER:
4.000Valley" (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
Community Development permitcenter(u,spokanevalley.org
Mechanical Permit Application n Commercial ® Residential
SITE ADDRESS: _7320 E Euclid Ave,Spokane Valley WA 99212
Building Owner
Name:Same as Contractor Phone: Fax:
Address: City: State: Zip:
Contractor
Name:Markham Homes Inc. Phone:(509)927-1437 Fax:(509)927-2816
Address:P.O.Box 610 City:Liberty Lake State:WA Zip:99019
License No:MARKHHI97I DK City Business Lic:602 277 533
Contact/Project Manager:
Name:Al Foubert Phone:(509)927-1437
#UNITS
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU 1
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER 0-3 TON 1
AIR CONDITIONER Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER 1
GAS PIPING SYSTEM(each outlet) 3
GAS LOG,FIREPLACE,&GAS INSERT 1
APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT
REPAIRS OR ADDITIONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST Each fan connected to a singe duct 4
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation or relocation of commercial
APPLIANCES Range,Clothes Washer 3
UNLISTED APPLIANCES Under 400,000 BTU
UNLISTED APPLIANCES Over 400,000 BTU
HOOD
Type I
HOOD 2
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM—FREE STANDING
EXPIRES: VIN:
❑CASH ❑CHECK 0 VISA 0 MC
CARD* SIGNATURE
F:\Tracking\Customs\7320 Euclid MechanicalPermitApplication040309.doc
Permit Center
CIT1okane 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
�J� Spokane Valley,WA 99206
40,00Valley (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
permitcenter@spokanevalley.org
Community Development
Plumbing Permit Application Commercial ® Residential
SITE ADDRESS: _ 7320 E Euclid Ave,Spokane Valley WA 99212
Building Owner
Name:Same as Contractor Phone: Fax:
Address: City: State: Zip:
Contractor
Name:Markham Homes Inc. Phone:(509)927-1437 Fax:(509)927-1437
Address:P.O.Box 610 City:Liberty Lake State:WA Zip:99019
License No:MAKRHHI971DK City Business Lic:602 277 533
Contact/Project Manager:
Name:Al Foubert Phone:509-927-1437
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS 3
URINALS
TUBS
2
SHOWERS(per trap) 1
Lav/Basins,Bar,Floor,Kitchen,Laundry, Utility,Janitor,Photo,X-ray,Food,
SINKS Prep/Culinary Meat 4
DISHWASHER 1
CLOTHES WASHER 1
GARBAGE DISPOSAL 1
WATER SOFTNER
FLOOR DRAIN Area,Case,Coil,Trench,Condensate 1
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN,DRINKING
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler 1
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER If Gas,See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION Water piping,drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ❑CHECK ❑VISA 0 MC EXPIRES:
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT: http://www.spokanevalley.org/under the quick links for Forms, Master Fee Schedule.
F:\Tracking\Customs\7320 Euclid\7320 Euclid PlumbingPermitApplication040309.doc
For City Use Only
CITYSiOkane
400
al le
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
7320-E EUCLID AVE
LOT 2, BLOCK I
August 13, 2009
EUCLID AVE
0
z
U/
X
W
LOT
5'
PLANNING DEPT. APPROVED
BY.>l
DATE:Ia)
85.5'
10' UTILO SETBACK
ALDER
7320 E
EUCLID
LOT
N
N
2
21' 6"
GARAGE I U
m
w
LLJ
ry
0
85.5'
� W
Q
>
ry
N
I n
►0
N
85.5'