Loading...
2009, 06-30 Permit App 09001940 ApproachProject Number: 09001940 Inv: I Application Date: 6/30/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: RES APPROACH Contact: CRESTON CONSTRUCTION Address: P.O. BOX 9 C - S - Z: COLBERT WA 99005 Setbacks: Front Left: Right: Rear: Phone: (509) 238-2565 Group Name: Site Information: Project Name: Plat Key: 005776 Name: SP -1027-95 District: Nort Parcel Number: 45183.0717 Bin c: Lot: SiteAddress: 321 N DICK RD Owner: Name: NYE, LINDA A ess: 321 N DICK RD Location:: CSV SPOKANE, WA 99212-2865 Zoning: R-3 ss et Water District: Area: 15,046 Sq Ft W' . 1: Nbr of Bldgs: 1 Nbr of 1 Review Information. . K1\ Review Driveway/Approach Permits: Approach ,+Hold: ❑ 121 Right Of Way (ft): 40 Released By: Contractor: CRESTON CONSTRUCTION INC Firm: CRESTON CONSTRUCTION INC Address: PO BOX 9 Phone: (509) 230-6230 COLBERT, WA 99005 Item Description Units Unit Desc Fee Amount APPROACH -CONST IN ROW 1 NUMBER OF $50.00 Permit Total Fees: $50.00 Operator: JD Printed By: JD Print Date: 6/30/2009 Project Number: 09001940 Inv: I Application Date: 6/30/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine Approach $50.00 $50.00 $0.00 $50.00 $50.00 $50.00 $0.00 $50.00 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 6/30/2009 tm Permit Center PERMIT NUMBER: �y� 11703 E Sprague Ave, Suite B-3 011Li`ll%ee Spokane Valley, WA 99206 PERMIT FEE: �Qileyo (509)688-0036 FAX: (509)688-0037 www.si)okanevalley.org Community Development Approach Permit Application PROJECT ADDRESS 301 I &) b ;c I4 START DATE A td' I �T%,. ANTICIPATED COMPLETION DATE /}�J ' i Building Owner: - Contractor: Name: Name: �,r cot -1 C01V4r s� Address: " Address: City. $ State: Zi City; State: Zip: Phone: 1W - Fax Phone: 4A q - 177 Fax:404-/77J Contact Person r K Contractor Lic No: Exp Date: Name: City Business Lic. No: Phone: PROJECT DESCRIPTION (Provide site sketch) Residential Driveway F Commercial/Industrial Driveway Existing Curb & Gutter F Rural Road Section Culvert Installation El Sidewalk Repair/Construction Other Conditions Bond/Insurance certification must be on file with the city DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valle Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane alley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinance 6) Plans or additional in =art /� ay be required to be submitted, and subsequently approved before this application can be essed. 1 A// Method ofPa*jnr. ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: JUN 3 0 2009 aMsro svma N I I:tlVlttt BY, cnl 007 Spokane Valley Urban Driveway Approach Requirements ► Minimum of 7.5' from property line ► Minimum of 5' from crosswalks or intersection curb arc ► Minimum of 16' wide flat portion of approach ► Maximum of 30' wide flat portion of approach ► Combined approach width not to exceed 50% of total frontage ► Minimum of 15' of separation between any two approaches ** All driveway approaches to be constructed per the Spokane County Standards as adopted by the City of Spokane Valley ** U, A 6� G r JUN 3 0 2009 F'tti l;tN I tH BY; F4ic,4'q fOVV'+o� 1SJd scl FT � ` _ I 1 —ae — � ��- Page 1 of 1 Jenna Davis From: Wayne McGavran Sent: Wednesday, July 01, 2009 8:26 AM To: Jenna Davis Cc: Scott Wallace, Jodi Main Subject: RE: 09001940 Jenna, The proposed garage is already in and the approaches are already existing, so there is nothing to review on this approach permit. Wayne From: Jenna Davis Sent: Tuesday, June 30, 2009 2:04 PM To: Wayne McGavran Cc: Scott Wallace; Jodi Main Subject: 09001940 Thanks 7/1/2009