2010, 02-18 Permit App 10000423 Water DamageProject Number: 10000423 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: REPAIR WTR DMG FROM BROKEN PIP
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 000000 Name: Range
Date: 2/18/2010 Page 1 of 2
Contact: BAKER CONSTRUCTION
Address: 2711 E SPRAGUE AVE
C - S - Z: SPOKANE WA 99202
Phone: (509) 535-3668
Group Name:
Project Name:
District: Nort
Parcel Number: 45183.0660
SiteAddress: 516 N ELLA RD
Location:: CSV
Block:
Zoning: R-3 SF Res District
Water District: 005 HUTCHINSON
Area: 8,088 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Lot:
Owner: Name: MCGRIFF, SUSANNA / TRAYNOR,
Address: 516 N ELLA RD
SPOKANE VALLEY, WA 99212
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released: 2/18/2010 By: dgpowell
Contractor: BAKER CONST. &
Address: 2711 E SPRAGUE AVE
SPOKANE, WA 99202
Building Permit
Firm: BAKER CONST. & DEVELOPMEN
Phone: (509) 535-3668
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB WTR DMG 0 $57,756.00 0 $57,756.00
REPAIR
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $57,756.00 0 $57,756.00
Units Unit Desc Fee Amount
1 SELECT $699.75
1 SELECT $4.50
1 SELECT $279.90
Permit Total Fees: $984.15
Operator: jmm Printed By: jmm
Print Date: 2/18/2010
Project Number: 10000423 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/18/2010 Page 2 of 2
Notes::.
Building Inspector will need to verify whether or not mechanical and plumbing permits will be required.
This permit is for the water damage repair only; the Building Inspector will verify that the scope of the
repair is within that proposed by the contractor.
Payment Summary::,.;
Permit Type
Building Permit
Fee Amount Invoice Amount
$984.15 $984.15
Amount Paid
$0.00
Amount Owing
$984.15
$984.15 $984.15
$0.00 $984.15
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 2/18/2010
ScnYt5le
P ne
.000Valleyv
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3 '.
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenterOspokaneval Iev.oro
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
ie)-o(fr3
C GEUTER
•
FEB
RESIDENTIAL CONSTRUC
NI NEW CONSTRUCTION
Iffl DECK NJ OTHER
ON PERMIT APPLICATION
SITE ADDRESS:516 NORTH ELLA ROAD
ADDITION/REMODEL l j ACCESSORY BUILDING
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:SUSANNA MCGRIFF
NAME:SUSANNA MCGRIFF
ADDRESS:516 NORTH ELLA ROAD
CITV:SPOKANE VALLEY
STATE:WA ZIp:99212
PHONE:863-6609
FAX: CELL:
CONTACT NAME:
PHONE:
FAX: CELL:
CONTRACTOR NAME: BAKER CONSTRUCTION & DEVELOPMENT, INC.
MAILING ADDRESS:2711 E SPRAGUE AVE
CITY:SPOAKANE
STATE:WA ZIp:99202
PHONE:535-3668
FAX:535-3720 CELL:714-7501
CONTRACTOR LICENSE No.:BAKERCD066CZ
NO.:
EXPIRES: CITY BUSINESS LICENSE
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
REAPIR WATER DAMAGES FROM BROKEN PIPE, PLEASE SEE ATTACHED SHEET FOR SCOPE OF WORK DETAILS
PROPOSED USE:
SINGLE FAMILY RESIDENTIAL HOUSING
Effective October 28, 2007 Page 1 of 2
C:\Documents and Settings\kledbetter\Desktop\6225 516 N Ella\Residential Construction Permit App.1. completed.doc
****YOU MUST COMPLETE THE FOLLOWING****
MARK NIAIF NOT APPLICABLE
Height to Peak:NA
Dimensions:NA
No. of Stories:2
Total Habitable
Space:NA
Main Floor SQ FT:NA
Upper Floor SQ FT:NA
Unfinished Basement
SQ FT:NA
Finished Basement
SQ FT:NA
Garage SQ FT:NA
Deck/Covered Patio
SQ FT:NA
Impervious Surface
Area:NA
30% Slopes on
Property:NA
No. of Bedrooms:4
Construction
Type:FRAME
Heat Source:ELECTRIc
Sewer or
Septic:uNKNowN
TOTAL COST OF PROJECT: $57,756
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner In thls transaction. 4) All construction Is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be submit ed and subsequently approved before this application can be processed.
Signature
Method of payment: ❑ Cash ❑ Check
Bankcard #:
Date:2/12/2010
❑ Visa ❑ Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
C:\Documents and Settings \kledbetter\Desktop\6225 516 N Ella\Residential Construction Permit App.1 completed.doc
Spokan��
valley®
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
Commercial/Multi-Family Plan Review
Summary
Permit Center Out -Processing Information
PLUS Project #: 10000423
Project Name: MCGriff, Susanna
Site Address: 516 N Ella
Project Description: Repair water damage in existing kitchen & bathroom (interior
remodel only)
Manual Valuation: x Yes ❑ No
Valuation: $ 57,756.00
Occupancy Group: Group R-3
Type of Construction: VB
Floor Area
1st floor: N/A sq. ft.
Other floors (specify each floor sq.ft.):
Conditions on Permit (list):
Pre -construction Meeting Required o Yes x No
1. Building Inspector will need to verify whether or not mechanical and plumbing
permits will be required.
2. This permit is for the water damage repairs only; the Building Inspector will verify
that the scope of the repair is within that proposed by contractor.
Other Technical Information
Phased Submittal: o Yes X No
Occupant load (OL)
1st Floor: N/A
Other floors (specify each floor occ. load):
Assembly Only (OL for room and room location (each assembly room):
NREC Provided: N/A o Envelope o Mechanical ❑ Electrical/Lighting
Building Envelope Design (1-IB1848): ❑ Provided x Not required
Plan Reviewer:
File Location:
Revised: December 23, 2009
Doug Powell
Date: 2/18/2010
Page 1 of 1
Doug Powell
From: Kirk Ledbetter [kledbetter@bakerconstruct.com]
Sent: Tuesday, February 16, 2010 3:19 PM
To: Doug Powell
Subject: Permit request 516 N Ella
Attachments: permit app.pdf; image002.jpg; image001.jpg
BAKFR
From: Kirk Ledbetter
Sent: Friday, February 12, 2010 11:15 AM
To: tmelbourn@spokanevalley.org
Subject: Permit request 516 N Ella
Hi Tom,
The insurance company has finally came to an agreement regarding the water damage repairs on the house located at
516 N Ella Rd in the Spokane Valley.
I have attached a copy of the permit application along with a breakdown of the costs and scope of work to be done, The
inspector was called out and has
performed an initial inspection and was going to issue a water damage report and place it on your desk. Please let me
know if you need any additional
information for this permit and what the permit costs will be and I can bring you a check.
Thank You
Kirk Ledbetter
1
516 N. ELLA
Estimated
Cost
INCLUDES:
Division 1
19240
General Conditions
Division 2
6785
Asbestos abatement
Division 3
0
Division 4
0
Division 5
0
Division 6
3200
Repair structural deficiencies per inspector, fur
out wall to accept R-21 insulation
Division 7
1060
Exterior wall insulation R-21
Division 8
1250
New interior doors & Hardware
Division 9
14006
New interior sheetrock, paint and floor covering
Division 10
0
Division 11
0
Division 12
4035
New kitchen & Bath Cabinets
Division 13
0
Division 14
0
Division 15
1500
repair broken water lines and remove and reset
fixtures
Division 16
6680
install new wall heaters, add smoke detectors,
add arc fault protection to bedrooms, replace
dryer and range wire per code, install exhaust fan
per code, install new meter base and mast, install
new breaker panel and breakers, GFI devices as
needed, replace switches and covers, update
grounding and bonding.
TOTAL
57756
RAKER
IHtt 1)11'
A USA irSIO ff.ee
KIRK LE DBC t t*.
orrIcE. 5osv-535-3606
CELL 509-714-7501
xiE I TIER BAKERCOI, TRUCT.COM
2711 eh-4:T SPRAOM AvEWIE
SPo heANE. WA 99202
Spokane
Valley°
INSPECTION NOTICE
DO NOT REMOVE THIS NOTICE
ADDRESS: Syr:, £fZ LA Parcel #:
Building Division
City of Spokane Valley
11703 E. Sprague Ave. Ste. B-3
Spokane Valley, WA 99206-5185
Phone 509-688-0054, Fax 509-688-0037
be i�.4,4(A6/
STC0CTLc2AC -pi A i)et c`PPP
7stt ,i -i i u Cs r 04 T-tavl
/V le 1-114(ZO but
yi/d LL fisiErio E2MZ l �I<
1 kJ d`' e D 17-0 1.14f-,
IF YOU HAVE ANY QUESTIONS CALL , 1` �'/ 509-68800-4C4-
-
CaII for reinspection before cover
•WHEN CORRECTIONS HAVE BEEN MADE, CALL (509) 688-0054 FOR RE -INSPECTION.
DATE INSPECTOR
Pepj occo Le
' fir• (f Jt-V
WED 1, ),' IANCE
N
l -2- (C1
CITY COPY