1994, 09-30 Update Ltr to CourtDEPARTMENT OF BUILDINGS •
JAMES L. MANSON, C.B.O., DIRECTOR
Honorable Donna Wilson,
Spokane County District Court
1100 West Mallon
Spokane, Washington 99260
Re: Spokane County vs. Smith
Dear Judge Wilson:
A DIVISION OF THE PUBLIC WORKS DEPARTMENT
DENNIS M. SCOTT, P.E., DIRECTOR
September 30, 1994
7tit/4
Please be advise that on September 28, 1994, Mr. Smith called our office stating that he had
exposed those areas required for inspection. The agreed upon time for the inspection was set
for 2 p.m. the same day.
Kevin Myre, Frank Christoff, and myself arrived at Mr. Smith's property to conduct the
inspection as agreed at approximately 2 p.m. Also present was Mr Don Shaw representing
Russel Van Camp.
Upon arrival for the inspection it was apparent that none of the required areas identified on
September 23rd were exposed. An attempt was made to expose one small area of the
building, but the siding was still in place preventing inspection.
Unless full exposure is made by Mr. Smith this office will be unable to make our correction
report to the court as directed by October 7, 1994. It will be necessary to have at least two
working days to complete our report if and when we are contacted by Mr. Smith.
Enclosed are copies of photos taken on September 28th to illustrate that exposure was not
made.
c. Frank Christoff
Russell Van Camp
Kevin Myre
Sincerely,
/oovcc. n\
Thomas L. Davis
Code Compliance Coordinator
dpt
Enclosure
1026 WEST BROADWAY AVENUE • SPOKANE, WASHINGTON 99260 • (509) 456-3675
FAX (509) 456-4715 • TDD (509) 324-3166