Loading...
2013, 11-20 Permit SW-13002084 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13002084 Permit Issued Date: 11/20/2013 Expiration Date: 11/20/2014 Project Description: SEWER CONNECTION Project Name: W PONDEROSA Primary Contact: H & S CONSTRUCTION Phone: 509-926-8964 Applicant: H & S CONSTRUCTION Address: 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 Phone: 509-926-8964 Email: SITE INFORMATION: Site Address: Parcel Number: 10024 E FERRET DR 44051.1403 Assessor's Description: ILLER ADD L3 B6 Inspection Area: : (509)-477-3675 Owner: LEWIS, R E & J M Address: 10024 E FERRET DR SPOKANE, WA 99206-9207 Phone: Email: Water District: Spokane County Water Fire District: Fire District 8 District #3 Zoning: Land Area: 48272.8 Square Feet CONTRACTOR INFORMATION: HSCON"123KF, Exp. 05/08/2015 H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS: Class SEWER Type FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 Quantity Unit Charge Value 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Possible Floodplain Inside Public Transit Benefit Area Possible Shoreline On Site CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 11/20/2013 09:16:44 Project Coordinator: Julie Shatto SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13002084 Permit Issued Date: 11/20/2013 Expiration Date: 11/20/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/20/2013 09:16:44 Project Coordinator: Julie Shatto