2013, 10-09 Permit App BLD-2013-2035 Mechanical, Plumbing FixturesSpokane
.Valley
Communl'velopment
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
PHONE: (509) 720-5240
FAX: (509) 688-0037
Mechanical Permit Application ❑ Commercial
Residential
o 1)11).- DoLo.
PERMIT FEE:
SITE ADDRESS: &C 1 N • t'�V�if'G� reell
Building Owner `_-1 /4i %{ G1jy / am --
(� I `� ' w �[l1/l
Name:
Phone: A - / O'
Fax:
Address: a 1 J v, e-V v 1 D D /\
1 C�Cif
City:
State:
Zip:
Contractor
,� Q
Name:/U�-
69
Phone:
Fax:
Address:
City:
State:
Zip:
License No:
City Business Lic:
Contact/Project Manager:
frw_644
f� ��
Name:
%lfJl
Phone:
# UNITS
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER
0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM (each outlet)
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 hp-100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 - 15 hp —100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 — 30 hp - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 hp —1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 50 hp — over 1,750,000 BTU�
�[
..
HANDLERAIR (DOES NOT include ducting)
Each unit up to 10,000 cfm, including ducts
AIR HANDLER (DOES NOT include ducting)
Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
!_
O
VENTILATION AND EXHAUST
Each ventilation system
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
INCINERATORS
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
APPLIANCES
Range, Clothes Dryer
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Type I
HOOD
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM — FREE STANDING
Signature
CURRENT FEES AVAILABLE AT: http:llwww.spokanevallev.orq Quick Zink to forms, then Master Fee Schedule
S okan�e�'
�Valleyz
Plumbing Permit Application
C unity Development
P Center
llraqur! ^-Ite P
b110 (dire Vade,, NA ee20b
PHONE: (509) 720-5240
FAX: (509) 688-0037
SITE ADDRESS:L( 1" ' �fve/r reef)
°V-- ;3)0 I (71-U 7
111PRMIT NUMBER:
❑ Commercial t4 Residential
U
Building Owner
��� ��q
Phone: Fax:
Name:
Address: ( J j . Ci i v► r2 City: State: Zip:
Contractor Q
Name:Wc,
3 Phone: Fax:
Address: City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: Phone:
#UNITS
FIXTURE ON A TRAP
i1
PLUMBING
'
TOILETS
URINALS
TUBS
trap)
SHOWERS (per
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Meat
)
I
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
Af" WATER SOFTNER
FLOOR DRAIN
Area, Case, Coil, Trench, Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
_
4— WATER PIPING/DRAIN-IN WASTE
Installation, Alterations, Repair, Reversals
4- WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps
F -
REPAIR OR ALTERATION
Water piping, drainage or vent piping
•h
1 ✓ —
�1/-{�,,
"
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS 1
��
Signature Cie/L �t $ z 7 5 /2
CSV PERMIT CENTER
CURRENT FEES AVAILABLE AT: http://www.spokanevalley.oro/ under the quick links for Forms, Master F Schedule.
http://www.spokanevalley.org/filestorage/124/938/210/948/149 6/2743/Plumb App.doc
• •
Bob Bebout
From: Jenny Nickerson
Sent: Monday, October 07, 2013 12:15 PM
To: Jay Grissom; Rob Guerry; Bob Bebout
Subject: BLD-2013-2034
Soraya Hanson came into the office and is planning on adding ceiling insulation to the attic to be finished under BLD-
2013-2034. She plans on sistering 2x6 alongside the existing 2x4 rafters to allow for the installation of at least R-21 in
the existing heated space. She can be reached at 217-1015 if you have any questions. Thanks! JRN
Jenny Nickerson, CBO MCP
Senior Plans Examiner
City of Spokane Valley Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
ph: (509) 720-5316
jenny.nickerson@spokanevalley.org
1
Target Date sheet
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date. r r
Your application review TARGET DATE is 1 /
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees.and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD-003 V-7/ 06-21-11 Page 1 of 1