Loading...
2013, 10-09 Permit App BLD-2013-2035 Mechanical, Plumbing FixturesSpokane .Valley Communl'velopment Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 PHONE: (509) 720-5240 FAX: (509) 688-0037 Mechanical Permit Application ❑ Commercial Residential o 1)11).- DoLo. PERMIT FEE: SITE ADDRESS: &C 1 N • t'�V�if'G� reell Building Owner `_-1 /4i %{ G1jy / am -- (� I `� ' w �[l1/l Name: Phone: A - / O' Fax: Address: a 1 J v, e-V v 1 D D /\ 1 C�Cif City: State: Zip: Contractor ,� Q Name:/U�- 69 Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: frw_644 f� �� Name: %lfJl Phone: # UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp —100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp —1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU� �[ .. HANDLERAIR (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct !_ O VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Dryer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING Signature CURRENT FEES AVAILABLE AT: http:llwww.spokanevallev.orq Quick Zink to forms, then Master Fee Schedule S okan�e�' �Valleyz Plumbing Permit Application C unity Development P Center llraqur! ^-Ite P b110 (dire Vade,, NA ee20b PHONE: (509) 720-5240 FAX: (509) 688-0037 SITE ADDRESS:L( 1" ' �fve/r reef) °V-- ;3)0 I (71-U 7 111PRMIT NUMBER: ❑ Commercial t4 Residential U Building Owner ��� ��q Phone: Fax: Name: Address: ( J j . Ci i v► r2 City: State: Zip: Contractor Q Name:Wc, 3 Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: Name: Phone: #UNITS FIXTURE ON A TRAP i1 PLUMBING ' TOILETS URINALS TUBS trap) SHOWERS (per SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat ) I DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL Af" WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING _ 4— WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals 4- WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps F - REPAIR OR ALTERATION Water piping, drainage or vent piping •h 1 ✓ — �1/-{�,, " ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS 1 �� Signature Cie/L �t $ z 7 5 /2 CSV PERMIT CENTER CURRENT FEES AVAILABLE AT: http://www.spokanevalley.oro/ under the quick links for Forms, Master F Schedule. http://www.spokanevalley.org/filestorage/124/938/210/948/149 6/2743/Plumb App.doc • • Bob Bebout From: Jenny Nickerson Sent: Monday, October 07, 2013 12:15 PM To: Jay Grissom; Rob Guerry; Bob Bebout Subject: BLD-2013-2034 Soraya Hanson came into the office and is planning on adding ceiling insulation to the attic to be finished under BLD- 2013-2034. She plans on sistering 2x6 alongside the existing 2x4 rafters to allow for the installation of at least R-21 in the existing heated space. She can be reached at 217-1015 if you have any questions. Thanks! JRN Jenny Nickerson, CBO MCP Senior Plans Examiner City of Spokane Valley Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 ph: (509) 720-5316 jenny.nickerson@spokanevalley.org 1 Target Date sheet 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. r r Your application review TARGET DATE is 1 / The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees.and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD-003 V-7/ 06-21-11 Page 1 of 1