2012, 06-08 Permit SW-12001502 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12001502
Permit Issued Date:
06/08/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
WEST PONDEROSA
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
ALPINE EXCAVATING
ALPINE EXCAVATING
P0BOX 141993
SPOKANE VALLEY, WA 99214
(509)220-3038
SITE INFORMATION:
Site Address:
Parcel Number:
4710 S FARR RD
44052.9175
Subdivision: SP-746-92
Assessor's Description:
Inspection Area:
Zoning:
05-24-44 TR A SP92-746 AUD #9212170413 BK 9
PG 8 BEING A PTN OF NW1/4
Owner:
Address:
Phone:
Email:
HOSTETTER, LYNN E/ALICE C
4710 S FARR RD
SPOKANE, WA 99206-9227
Water District: Spokane Fire District: Fire District 8
County Water District #3
Land Area: 1 acre
CONTRACTOR INFORMATION:
General Contractor
ALPINE *012JZ
ALPINE EXCAVATING
PO BOX 141993
SPOKANE, WA 99214
509-892-5227
DETAILS:
Class
Type
Quantity
Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Printed by: IIS APPPOOL\ASP.NET v4.0
Date Printed: 06/08/2012 08:16:12
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001502 06/08/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/08/2012 08:16:12
Printed by: IIS APPPOOLIASP.NET v4.0