Loading...
2012, 06-08 Permit SW-12001502 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW-12001502 Permit Issued Date: 06/08/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION WEST PONDEROSA SEWER Primary Contact: Applicant: Address: Phone: Email: ALPINE EXCAVATING ALPINE EXCAVATING P0BOX 141993 SPOKANE VALLEY, WA 99214 (509)220-3038 SITE INFORMATION: Site Address: Parcel Number: 4710 S FARR RD 44052.9175 Subdivision: SP-746-92 Assessor's Description: Inspection Area: Zoning: 05-24-44 TR A SP92-746 AUD #9212170413 BK 9 PG 8 BEING A PTN OF NW1/4 Owner: Address: Phone: Email: HOSTETTER, LYNN E/ALICE C 4710 S FARR RD SPOKANE, WA 99206-9227 Water District: Spokane Fire District: Fire District 8 County Water District #3 Land Area: 1 acre CONTRACTOR INFORMATION: General Contractor ALPINE *012JZ ALPINE EXCAVATING PO BOX 141993 SPOKANE, WA 99214 509-892-5227 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Printed by: IIS APPPOOL\ASP.NET v4.0 Date Printed: 06/08/2012 08:16:12 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001502 06/08/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/08/2012 08:16:12 Printed by: IIS APPPOOLIASP.NET v4.0