2012, 12-04 Permit SW-12002590 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12002590
Permit Issued Date:
12/04/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
SUN PINE SUBDIVISION
SEWER
Primary Contact: GRAY HOMES
Applicant:
Address:
Phone:
Email:
GRAY HOMES
120 N LOCUST RD
SPOKANE VALLEY, WA 99206
509-868-4905
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
525 S FELTS RD
45201.2603
Sun Pine
(CITY OF SPOKANE VALLEY) SUN PINE
SUBDIVISION LT 3 (AUDITORS #5898465 BK 36
PGS 1 & 2)
Water District: Modern
Electric Water Company
Owner:
Address:
Phone:
Email:
FELTS TRUST
212 IRONWOOD DR STE D
COEUR D'ALENE, ID 83814
Fire District: Spokane Valley Fire
Land Area: 3215 Square Feet
CONTRACTOR INFORMATION:
General Contractor
GRAYHH'881 Q6
GRAY HOMES
120 N LOCUST RD
SPOKANE VALLEY, WA 99206
509-868-4905
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 12/04/2012 09:51:42
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002590 12/04/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 12/04/2012 09:51:42 Printed by: IIS APPPOOL\SmartGovProdApp