HomeMy WebLinkAboutResolution 20-009 Six-Year TIP CITY OF SPOKANE VALLEY
SPOKANE COUNTY,WASHINGTON
RESOLUTION 20-009
A RESOLUTION OF THE CITY OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON, ADOPTING THE 2021-2026 TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE CITY OF SPOKANE VALLEY, AND OTHER MATTERS RELATING
THERETO.
WHEREAS, to provide for the proper andnecessary development of the street system within the
City of Spokane Valley, the City shall, as required by State law, develop and adopt annually a Six-Year
Transportation Improvement Program (Six-Year TIP) with such program acting as a guide for the
coordinated development of the City's transportation system; and
WHEREAS,the Six-Year TIP of the City shall specifically set forth those projects and programs
of both City and regional significance that benefit the transportation system and promote public safety and
efficient vehicle movements; and
WHEREAS, the Six-Year TIP shall be consistent with the City's Comprehensive Plan and be
adopted following one or more public hearings before the City Council; and
WHEREAS, a draft copy of the Six-Year TIP was submitted to the Washington State Department
of Commerce and has been reviewed and approved prior to the scheduled adoption of the TIP in accordance
with RCW 36.70A.106; and
WHEREAS, the City Council conducted a public hearing on May 26, 2020 for the purpose of
inviting and receiving public comment on the proposed Six-Year TIP.
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington, as follows:
Section 1, The City Council hereby adopts the attached Six-Year TIP for the City of Spokane
Valley for the purpose of guiding the design, development and construction of local and regional
transportation improvements for the years 2021 through 2026. The City Clerk is directed to file the 2021-
2026 Six-Year TIP with the Washington State Secretary of Transportation before June 30, 2020. The Six-
Year TIP shall be reviewed at least annually for the purpose of determining the work to be accomplished
under the program and the City's transportation requirements.
Projects and timeframes identified in the Six-Year TIP are to be considered estimates only that may change
due to a variety of circumstances, and are not intended by the City to be relied upon by property owners or
developers in making development decisions.
Section 2. Effective Date. This Resolution shall be in full force and effect upon adoption.
Adopted this 26°1"day of May, 2020.
ATTES City ofSpokane V Iley
.8
-
ji)---e... , T ! u
Bainbridge, City Clerk - Ben Wick,Mayor
,ykv.-I.." 4er .
i ' ice o / 1e 1 orney
Resolution 20-009, Adopting Six-Year TIP
STATE OF WASHINGTON
DEPARTMENT OF COMMERCE
1011 Plum Street SE •PO Box 42525• Olympia, Washington 98504-2525• (360) 725-4000
www.commerce.wa.gov
05/28/2020
Mr. Adam Jackson
Engineer- Planning Grants
City of Spokane Valley
1021 East Sprague Avenue
Spokane Valley, WA 99206
Sent Via Electronic Mail
Re: City of Spokane Valley--2020-S-1419--Notice of Final Adoption
Dear Mr. Jackson:
Thank you for sending the Washington State Department of Commerce the Notice of Final
Adoption as required under RCW 36.70A.106. We received your submittal with the following
description.
Adopted Resolution 20-009 for the 2021-2026 six-year Transportation Improvement
Program (TIP)
We received your submittal on 05/28/2020 and processed it with the Submittal ID 2020-S-1419.
Please keep this letter as documentation that you have met this procedural requirement.
If you have any questions, please contact Growth Management Services at
reviewteam@commerce.wa.gov, or call Benjamin Serr, (509) 724-1699.
Sincerely,
Review Team
Growth Management Services
Page: 1 of 1
OF 2021 - 2026 Six Year
SCITY
pU�a11E'
Transportation Improvement Program (TIP)
Valley:
. .. ._ _ _ ....... . ..._ ... . ...... .. ... . ..... .......,. _• -
. . , _ ..,,.. ..
_ .„._ ...... ...,
_._______,.._ f• 'Ir• % - •
17 r .. 'lr #'.• ,i . • . f rte, '
= _
.. . . .. . •,,,.-,• .„-±,--......m,,HL... 0, -0,...0_ r ..1 = .. -______.
$46
` `y
1
sr +i. w • it .. -.. `.
•
Irigillitirlillitmr,, - L - lie. -#-'— ., . ' -:'
m s.1.1!11111B411111111A1 es•} - - , _
, , -3Y: ''hist;, . A.,;,..f 4, , — ,
' _ -
'•-'� -..
--
1 Y $ , " j ..y..rte i. _ -- -' —
r
•
. ..sem :
City of Spokane Valley
Community & Public Works Department
2021-2026 Transportation Improvement Program (TIP) Spokane
Valley.
Glossary & Abbreviations
Project Phases:
Funding Sources: • PE Preliminary Engineering
• City City Funds • RW Right-of-Way
• CDBG Community Development Block Grant • CN Construction
• CMAQ Congestion Management/Air Quality
• COM Washington Department of Commerce Zoning
• DEV Private Developer Funds `�//�
• FHWA Federal Highway Administration e RI
• FMSIB Freight Mobility Strategic Investment Board R2
• FTA Federal Transit Authority
• HSIP Highway Safety Improvement Program R3
• NHFP National Highway Freight Program POS
• Other Misc. Unidentified Funding Sources
• RCO Washington State Recreation Conservation Office MF
• REET Real Estate Excise Tax
• RR Railroad NC
• SRTS Safe Routes to School MU
• SW City Stormwater Funds
• STA Spokane Transit Authority CMU
• STBG Surface Transportation Block Grant RC
• STBG-SA Surface Transportation Block Grant—Set Aside
• TIB Transportation Improvement Board 11M1 IMU
• WAL Washington Legislature
• WSDOT Washington Department of Transportation
2021 - 2026
S`m�`��ne
Po Six-Year Transportation Improvement Program
.0000Vd ley Dollars in Thousands
Funding
Project 1 Description I Current Status 1 Length Total Sources 2021 2022 2023 2024 2025 2026 Total
1 Barker Rd. & 1-90 WB Interchange 90 WSDOT 90 90
Description:
Partnership with WSDOTfor PE of westbound 1-90/Barker interchange
roundabout.
Status: Funding Status: Secured PE 9D 90
2019-20 PE,2021 Closeout.Future CN by WSDOT. RW 0
Length (miles):0 CN 0
Total 90 90
2 N. Sullivan Rd. ITS Project 14 City 2 2
CMAQ 12 12
Description:
Extend Intelligent Transportation Systems conduit and controls along
Sullivan Corridor.
Status: Funding Status: Secured PE 0
2020 CN,2021 Closeout. Secured RW 0
Length (miles):2 Secured CN 14 14
Total 14 14
3 Adams Rd. Sidewalk 8 City 2 2
TIB 6 6
Description:
New sidewalk and stormwater on the east side from 16th to 22nd.
Status: Funding Status: Secured PE 0
2020 ON,2021 Closeout. RW 0
Length (miles):0.4 Secured CN 8 8
Total 8 8
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 1
Qliane 2021 - 2026
P Six-Year Transportation Improvement Program
4000 Valley Dollars in Thousands
Funding
Project I Description!Current Status 1 Length Total Sources 2021 2022 2023 2024 2025 2026 Total
4 Conklin Rd. Sidewalk 3 City
CDBG 3 3
Description:
New sidewalk on the west side from Appleway Trail to Riceland Lane.
Status: Funding Status: Secured pE 0
2020 CN,2021 Closeout. Secured RW 0
Length (miles):0.0 Secured CN 3 3
Total 3 3
5 2020 Local Access Streets(Barker Rd. Homes) 35 City 35 35
Description:
County sewer partnership.City to reimburse County for paying and
stormwater costs.
Status: Funding Status: Secured PE 0
2020 CN,2021 Closeout. RW 0
Length (miles):2 Secured CN 35 35
Total 35 35
6 Ella Rd_ Sidewalk 8 City 1 1
CDBG 7 7
Description:
New sidewalk on the west side from Broadway Ave.to Aiki Ave.
Status: Funding Status: Secured PE 0
2020 CN,2021 Closeout. Secured RW 0
Length (miles):0.2 Secured CN 8 8
Total 8 8
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 2
crr,.or2021 - 2026�e Six-Year Transportation Improvement Program
Walley Dollars in Thousands
Funding
Project I Description I Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
7 Indiana Ave. Preservation-Evergreen to Sullivan 3a City 38 38
Description:
Pavement preservation project with stormwater and signal improvements
as necessary.
Status: Funding Status: Planned PE 0
2019 PE,2020 CN,2021 Closeout."Other"funding;TIE or City. RW
Length (miles):0.9 Planned CN 38 38
Total 38 38
8 Sullivan Rd. Bridge Deck Resurfacing 5 City
Other Fed 5 5
Description:
Resurface existing bridge deck for Sullivan Road northbound over UPRR
tracks.
Status: Funding Status: Planned PE 0
2020 CN,2021 Closeout.Program delays may push CN to 2021. Planned RW 0
Length(miles):0 Planned CN 5 5
Total 5 5
9 Appleway Trail- Evergreen to Sullivan 45 City 6 6
CMAQ 35 35
Description: STBG-SA 4 4
Construct shared-use pathway along public utility corridor.
Status: Funding Status: Secured PE 0
2020 CN,2021 Closeout. Secured RW 0
Length (miles):1 Secured CN 45 45
Total 45 45
Projects and timeframes identified in the TEP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 3
,. 2021 . 2026
Spoke Six-Year Transportation Improvement Program
Walley Dollars in Thousands
Funding
Project I Description I Current Status!Length Total Sources 2021 2022 2023 2024 2025 2026 Total
10 Garland Ave. Extension Project 60 City 30 30
DEV 30 30
Description:
Construct 3-lane urban section between Flora and Barker.
Status: Funding Status: Secured PE 0
2019-2020 CN,2021 Closeout. Secured RW 0
Length (miles):1 Secured CN 60 sa
Total 60 60
11 Pines Rd./Mission Ave. Intersection Improvement 1,320 City 68 109 177
CMAQ 440 703 1,143
Description:
A two-phased project with signal and channelization upgrades to improve
capacity(Phase 1)and additional turn lanes on Pines(Phase 2).
Status: Funding Status: Partial PE 10 120 130
Phase 1 (6588k)funded by CMAQ for 2021 CN,potential for Developer Partial RW 32 32
funds via Mirabeau Subarea Traffic Study.Phase 2 is unfunded.
Length (miles): Intersection Partial CN 498 660 1,158
Total 508 812 1,320
12 Citywide Reflective Post Panels (2018) 36 City
HSIP 36 36
Description:
Installation of reflective post panels to stop signs and speed limit signs on
select streets.
Status: Funding Status: Secured PE 0
2020-2021 ON RW 0
Length (miles):0 Secured CN 36 36
Total 36 36
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 4
S�'�o�ane 2021 - 2026
p Six-Year Transportation Improvement Program
4000 Valley Dollars in Thousands
Funding
Project I Description I Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
13 Citywide Reflective Signal Backplates(2018) 82 City
HSIP 82 82
Description:
Installation of reflective backplate panels at select traffic signals.
Status: Funding Status: Secured PE 0
2020-2021 CN RW 0
Length (miles):0 Secured CN 83 83
Total 82 82
14 Park Rd. Sidewalk 688 City 275 275
TIB 413 413
Description:
New sidewalk on west side from Sharp to Mission with potential marked
crossing at Sharp or Cataldo.
Status: Funding Status: Secured PE 5 5
2020 PE,2021 ON. RW 0
Length (miles):02 Secured CN 683 683
Total 688 688
15 Barker Rd. Improvements-Spokane River to Euclid 566 City 2 2
STBG 353 353
Description: FMSIB 178 178
Reconstruct and widen to 3-lane urban section to east leg of Euclid. HSIP 33 33
DEV
Status: Funding Status: Secured PE 0
2020-2021 CN Secured RW 0
Length (miles):0.5 Secured CN 566 566
Total 566 566
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 5
Spocff,. 2021 . 2026
Six-Year Transportation Improvement Program
Valley Dollars in Thousands
Funding
Project I Description I Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
16 Sullivan Rd. I Wellesley Ave. Intersection Improvement 1,460 City 98 98 196
CMAQ 632 632 1,264
Description: Spo.Co.
Traffic signal and intersection improvement project,partnership with
Spokane County.
Status: Funding Status: Secured PE 0
2019-2020 PE&ROW,2021 CN,2022 Closeout. Secured RW 0
Length(miles): Intersection Secured CN 730 730 1,460
Total 730 730 1,460
17 Broadway Ave. Preservation-Havana to Fancher 2,910 City 578 12 590
Other 2,274 46 2,320
Description:
Pavement preservation,including stormwater improvements as necessary.
Status: Funding Status: Secured PE 10 10
2020 PE.2021 CN Possible funding via TIB or City Fund 311, Planned RW 0
Length(miles):1 Planned CN 2,842 58 2,900
Total 2,852 58 2,910
18 8th Ave. Preservation- Progress to Sullivan 655 City 578 12 590
Other 64 1 65
Description:
Potential partnership with Vera Water&Power for sidewalk extension on
south side along frontage of Vera's property.
Status: Funding Status: Planned PE 5 5
2020 PE with City funds,potential Fund 311 project in future CN years. RW o
Length (miles):0.2 Planned CN 637 13 650
Total 642 13 655
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 6
C1T, kai3P° 2021 - 2026
Six-Year Six-YTransportation Improvement Program
Walley Dollars in Thousands
Funding
Project f Description 1 Current Status!Length Total Sources 2021 2022 2023 2024 2025 2026 Total
19 Park Rd. I Mission Ave. Intersection Improvement 1,252 City 68 1,184 1,252
Description:
Improve channelization and signal operations.
Status: Funding Status: Planned PE 20 20
2021 PE+RW,2022 CN. Planned RW 48 12 60
Length (miles);Cl Planned CN 1,172 1,172
Total 68 1,184 1,252
20 Appleway Blvd. Stormwater Improvements 895 Other State 659 13 672
City 219 4 223
Description:
Improve stormwater facilities between University and Farr.Funded by
Dept.of Ecology.
Status: Funding Status: Secured PE 45 45
2020 PE,2021 CN,2022 Closeout.25%local match, Secured RW 0
Length (miles):0.6 Secured CN 833 17 850
Total 878 17 895
21 Pedestrian &Bicycle Safety Analysis 50 City 25 25 50
Description:
Evaluate crash history of vehicle versus pedestrian/bicyclists on City
streets,as identified in the 2020 Local Road Safety Plan.
Status: Funding Status: PE 25 25 50
PE only.May be staff led with support from consultant team.Sprague,SR RW 0
27,and Sullivan have majority of sever pedestrian crashes.
Length (miles):0 CN 0
Total 25 25 50
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4129/2020 Page 7
a�,. 2021 . 2026
SlPOkaIle Six-Year Transportation Improvement Program
Valley Dollars in Thousands
Funding
Project 1 Description 1 Current Status/Length Total Sources 2021 2022 2023 2024 2025 2026 Total
22 Barker Rd. at Union Pacific Crossing 1,339 City 776 15 791
FMSIB 269 5 274
Description: STBG 110 2 112
Reconstruct and widen to 3-lane urban section between Euclid intersection HSIP 159 3 162
legs and install shared-use path from river to Trent.
Status: Funding Status: PE 17 17
2020 PE+RW,2021 CN RW 25 25
Length (miles):0 CN 1,273 26 1,299
Total 1,314 25 1,339
23 Sullivan Rd. Preservation-Sprague to 8th 1,400 City 60 290 360
Other 1,040 1,040
Description:
Pavement preservation with signal,sidewalks and stormwater
improvements as necessary.
Status: Funding Status: Planned PE 80 20 100
Seeking funds,candidate for TIB or STBG preservation funding.Assumes Planned RW 0
20%City match for CIN
Length(miles):0.3 Planned CN 1,300 1,300
Total 80 1,320 1,400
24 Sullivan Rd. Preservation-8th to 16th 1,400 City 80 280 360
Other 1,040 1,040
Description:
Pavement preservation with signal,sidewalks and stormwater
improvements as necessary.
Status: Funding Status: PE 80 20 100
Seeking funds,candidate for TIB or STBG preservation funding.Assumes RW 0
20%City match for CN.
Length(miles):0.3 CN 1,300 1,300
Total 80 1,320 1,400
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 8
2021 . 2026
Spy ka le
pSix-Year Transportation Improvement Program
Valley4.100 Dollars in Thousands
Funding
Project I Description 1 Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
25 Argonne Rd. Concrete Pavement-Indiana to 5,044 City 646 430 1,076
Montgomery TIB 1,139 779 1,918
Description: STBG 1,210 840 2,050
Reconstruct with concrete and improve signal timing at Montgomery,
Status: Funding Status: Secured PE 25 25
2020 PE. TIB funds Montgomery intersection in 2021.SRTC funds Indiana Secured RW 20 20
to Montgomery in 2022 or 2023.
Length (miles):0.3 Partial CN 2,950 2,050 5,000
Total 2,995 2,049 5,044
26 Evergreen Rd. Preservation-Sprague to Mission 2,000 Other 72 1,498 30 1,600
City 18 374 8 400
Description:
Pavement preservation project.
Status: Funding Status: Planned PE 90 10 100
2021 PE,20212CN,2023 Closeout."Other"funding:TIB or City Fund 311. RW 0
Length(miles):0.9 Planned CN 1,862 38 1,900
Total 90 1,872 38 2,000
27 Balfour Park Frontage Improvements 1,910 City 1,872 38 1,910
Description:
Pavement preservation,widen paved shoulder,install curb and sidewalk
on Herald,Main and Balfour.
Status: Funding Status: PE 10 10
2020 PE,2021 CN.Partially funded REET,local street wear fee,CDBG, RW 0
Length (miles):0.4 CN 1,862 38 1,900
Total 1,872 38 1,910
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 9
ff-Nrm,.or 2021 - 2026
pokaneSix-Year Transportation Improvement Program
400000Valley Dollars in Thousands
Funding
Project I Description!Current Status/Length Total Sources 2021 2022 2023 2024 2025 2026 Total
28 Sprague Ave./Barker Rd. Intersection Improvement 2,139 City 175 1,497 30 1,702
CMAQ 342 7 349
Description: DEV 74 14 88
Provide new roundabout and with sidewalks and bike accommodations.
Status: Funding Status: Secured PE 33 33
2021 PE+RW,2022 CN.Partial CMAQ funded for 2022 authorization, Partial RW 216 54 270
potential TIB candidate.
Length (miles): Intersection Partial CN 1,798 37 1,835
Total 249 1,853 37 2,139
29 Sprague Ave. Stormwater Improvements 2,000 Other State 74 1,398 28 1,500
City 24 466 10 500
Description:
Drywell retrofits between University and Park.Funded by Dept.of Ecology.
Status: Funding Status: Secured PE 98 2 100
2021 PE,2022 CN,2023 Closeout.25% Local match. RW 0
Length(miles):2 Secured CN 1,862 38 1,900
Total 98 1,864 38 2,000
30 Wilbur Rd. Sidewalk-Boone to Mission 646 City 9 134 3 146
STBG-SA 56 435 9 500
Description:
Install sidewalk from Boone to Mission on one side of road.
Status: Funding Status: Secured PE 48 12 60
2021 PE,2022 CN. Secured RW 16 4 20
Length (miles):0.3 Secured CN 553 11 564
Total 65 569 12 646
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 10
S`Sorka2021 - 2026
ley Six-Year TransportationDollars lThousandsn
Improvement Program
Funding
Project 1 Description I Current Status/Length Total Sources 2021 2022 2023 2024 2025 2026 Total
31 Barker Rd./BNSF Grade Separation Project 21,033 City 1210 1,210 1210 3,630
NHFP 2,000 2,000 2,000 6,000
Description: TIGER 2,034 2,034 2,034 6,102
Construct Grade Separation at Barker/BNSF RR/Trent(SR290). FMSIB 1,667 1,667 1,667 5,001
11 UAL
Other 100 100 100 300
Status: Funding Status: Secured PE 0
Assumes 50%ROW in 2019. Secured RW 0
Length (miles): Intersection Secured CN 7,010 7,010 7,010 21,030
Total 7,011 7,011 7,011 21,033
32 Pines Rd. (SR27)1 BNSF Grade Separation Project 26,127 City 1,267 456 872 1,744 1,744 6,083
STBG 1,894 1,894 3,788
Description: Other Fed 811 611
Construct Grade Separation at Pines/BNSF RR/Trent(SR290). Other 3,489 6,978 6,978 17,445
Status: Funding Status: Secured PE 1,621 1,621
2020 PE Start."Other"assumes 20%City match. Secured RW 2,350 2,350 4,700
Length (miles): Intersection Partial CN 4,361 8,722 8,722 21,806
Total 3,972 2,350 4,361 8,722 8,722 28,127
33 Sullivan Rd_!SR 290 Interchange Reconstruction 26,630 City 636 636 636 433 55 4,520 6,916
Other 159 159 159 936 221 18,080 19,714
Description:
Reconstruct interchange to improve safety and capacity.
Status: Funding Status: Planned PE 795 795 795 265 2,650
City initiate FE in 2021,seek RW+CN funding by 2025. Planned RW 1,104 276 1,380
Length (miles):0 Planned CN 22,500 22,600
Total 795 795 795 1,369 276 22,600 26,630
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 11
�. a�a2021 - 2026
Spokae Six-Year Transportation Improvement Program
40000Va.iey Dollars in Thousands
Funding
Project!Description/Current Status!Length Total Sources 2021 2022 2023 2024 2025 2026 Total
34 Street Preservation Projects-$3M Annually 18,000 City 3,600 3,600 3,600 3,600 3,600 18,000
Description:
Preservation projects,typically arterials or collectors,or used as matching
funds for grants.
Status: Funding Status: Planned PE 100 100 100 100 100 500
Specified projects in TIP my duplicate this annual placeholder.Projects RW 0
may include storm and sidewalk upgrades as applicable.
Length (miles): Varies Planned CN 3,500 3,500 3,500 3,500 3,500 17,500
Total 3,600 3,600 3,600 3,600 3,600 18,000
35 Local Access Street Improvements-$1.5M Annually 9,000 City 1,500 1,500 1,500 1,500 1500 1,500 9,000
Description:
Funded by Street Wear Fee.Project type varies{surface treatments,
grind/inlays,reconstruction
Status: Funding Status: Secured pp 100 100 100 100 100 100 600
Site selection is on-going.Actual locations to be determined. Secured RW 0
Length (miles): Secured CN 1,400 1,400 1,400 1,400 1,400 1,400 8,400
Total 1,500 1,500 1,500 1,500 1,500 1,500 9,000
36 Citywide Safety Projects-Biennial 1,748 HSIP 433 86 433 86 433 102 1,573
City 48 10 48 10 48 11 175
Description:
Projects are consistent with the City's Local Road Safety Plan.Awarded
projects specified in TIP.
Status: Funding Status: Planned PE 11 22 11 22 11 23 100
Costs assume project implementation in odd-number years and RW 0
design/close-out in even-numbered years. 10%local match.
Length(miles): Planned CN 476 85 476 85 476 102 1,700
Total 481 96 481 96 481 113 1,748
Projects and timeframes identified in the TEP are to be considered estimates only that may change due to a variety of circumstances.
4129/2020 Page 12
CIT,,Ca2021 . 2026
Spokane Six-Year Transportation Improvement Program
Valley Dollars in Thousands
Funding
Project I Description d Current Status d Length Total Sources 2021 2022 2023 2024 2025 2026 Total
37 Sullivan Rd. Preservation-16th to S. City Limit 2,200 City 80 1,700 1,780
Other 420 420
Description:
Pavement preservation with signal,sidewalks and stormwater
improvements as necessary.
Status: Funding Status: Planned PE 80 20 100
Seeking funds,candidate for TLB or STBG preservation funding.Assumes Planned RW 0
20%City match for CN.
Length (miles):0.8 Planned CN 2,100 2,100
Total 80 2,120 2,200
38 Sth Ave. /Carnahan Rd. Intersection Improvement 2,000 City 35 50 315 400
Other 140 200 1,260 1,600
Description:
Add intersection control(turn lanes,potential signal).
Status: Funding Status: Planned PE 175 175
Assumes 20%City match.OTHER may be TIB, DEV or City. Planned RW 25D 250
Length (miles): Intersection Planned CN 1,575 1,575
Total 175 250 1,575 2,000
39 Mission Ave. Preservation-Mullan to University 1,880 City 50 77 1,718 35 1,880
Description:
Pavement preservation and possible widening project with stormwater
improvements as necessary.
Status: Funding Status: Planned PE 50 50 100
Assumes 100%City funded(Fund 311). Planned RW 135 15 150
Length(miles):0 Planned CN 1,715 35 1,750
Total 50 77 1,718 35 1,880
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances,
4/29/2020 Page 13
Spo,, 2021 - 2026
�� Six-Year Transportation Improvement Program
lley Dollars in Thousands
Funding
Project!Description I Current Status!Length Total Sources 2021 2022 2023 2024 2025 2026 Total
40 South Bowdish Rd.-Phased Corridor Improvements 2,502 City 12 a 460 12 8 500
Other 49 32 1,840 49 32 2,002
Description:
Reconstruct Sprague to Dishman Mica as 2-lane section wl curb,sidewalk,
bike lanes and new stormwaterfacilities. Also included are intersection
improvements at 32nd Ave and a new signal or roundabout at 16th Ave.
Status: Funding Status: Planned PE 200 200 400
Phased improvements to align with available funding opportunities. Planned RW 100 100 200
Potential sources include TIB,SRTC,Local.
Length (miles):3 Planned CN 2,300 2,300
Total 61 40 2,300 61 40 2,502
41 Dishman-Mica Rd. Preservation-Schafer to S. City 1,300 City 50 1,250 1,300
Limit
Description:
Pavement preservation project.
Status: Funding Status: Planned PE 50 50
Assumes 100%City funded(Fund 311). Planned RW 0
Length (miles):1 Planned CN 1,250 1,250
Total 50 1,250 1,300
42 Mullan Rd. Preservation-Broadway to Mission 1,400 City 42 147 189
STBG 267 944 1,211
Description:
Preservation project with conduit for future ITS infill,signals improvements •
at Mission.
Status: Funding Status: Planned PE 149 149
Applying for STBG Preservation funds. Planned RW 160 160
Length(miles):0.3 Planned CN 1,091 1,091
Total 309 1,091 1,400
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 14
2021 - 2026
Spone Six-Year Transportation Improvement Program
40,010Valley Dollars in Thousands
Funding
Project I Description I Current Status/Length Total Sources 2021 2022 2023 2024 2025 2026 Total
43 Mirabeau Parkway 1 Mansfield Ave- Intersection 905 City 120 110 230
Improvement CMAQ 100 575 575
Description:
Intersection capacity improvements.
Status: Funding Status: Partial PE 120 120
Potential for Developer funds via Mirabeau Subarea Traffic Study. Planned RW 100 100
Length (miles): Intersection Planned CN 685 685
Total 120 100 685 905
44 Barker Rd. Improvement Project-I-90 to Appleway 6,501 City 135 270 473 878
Other 865 1,730 3,028 5,623
Description:
Reconstruct 5-lane urban section with alignmentichannelization
improvements at Appleway&Broadway.
Status: Funding Status: Planned pE 1,000 1,000
Anticipated to follow 1-90 interchange improvements. Planned RW 2,000 2,000
Length (miles):0.3 Planned CN 3,500 3,500
Total 1,000 2,000 3,501 6,501
45 Flora Rd. Reconstruction-Euclid to Garland 2,200 City 20 20 400 440
Other 80 80 1,600 1,760
Description:
Reconstruct to an urban arterial section in partnership with Spokane
County Sewer Extension
Status: Funding Status: Planned PE 100 100
Seeking funding,assume 20%City match. Planned RW 100 100
Length (miles):0.6 Planned CN 2,000 2,000
Total 100 100 2,000 2,200
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4129/2020 Page 15
_ 2021 . 2026
Spaxle Six-Year Transportation Improvement Program
4000 Valley Dollars in Thousands
Funding
Project I Description I Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
46 Park Rd. Preservation-Sprague to Trent 1,360 City 100 60 1,200 1,360
Description:
Pavement preservation project.
Status: Funding Status: Planned PE 70 70
Assumes 100%City funded(Fund 311). Planned RW 30 30
Length (miles):0.8 Planned CN 1,200 1,200
Total 100 60 1,200 1,360
47 Vera Crest+ Rocky Ridge Street Reconstruction 150 City 60 60 30 150
Projects
Description:
Stormwater and road reconstruction projects including multiple
neighborhoods:Kahuna Hills(Carnahan/Kahuna/15th).Heather Park(16th
at Rocky Ridge, Koren),Ridgemont Estates(Vera Crest,Conklin).
Status: Funding Status: Planned PE 60 60 30 150
Multi-year,phased project.PE required to define scope and ON cost. RW 0
Possible CN funding by Ecology.
Length (miles):C CN 0
Total 60 60 30 150
48 Barker Rd. Intersection Improvements at 4th &8th 3,500 City 45 45 72 2,988 3,150
DEV 5 5 8 332 359
Description:
Provide new traffic signal or roundabout,per S.Barker Corridor Study.
Status: Funding Status: Planned PE 50 50 100
Assume City funded,but may be eligible for grant funds. Planned RW 80 20 100
Length (miles):0 Intersection Planned CN 3,300 3,300
Total 50 50 80 3,320 3,500
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 16
S 'kerne Zo2� - zo2s
Valley4000 Six-Year Transportation Improvement Program
Dollars in Thousands
Funding
Project!Description/Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
49 Cataldo Ave_ Realignment at Barker Rd. 2,000 City 20 120 100 560 800
DEV 5 30 25 140 200
Description: Other 25 150 125 700 1,000
Realign Cataldo east of Barker to intersect Boone Ave.,per adopted
Planned Action Ordinance.
Status: Funding Status: Planned PE 50 50 100
Planned project.Assume PAO contributions from Developers in the Planned RW 250 250 500
amount of 10%,City 40%,grants 50%.CN after 2025.
Length (miles):0.2 Planned CN 1,400 1,400
Total 50 300 250 1,400 2,000
50 Wellesley Ave_ Preservation -Sullivan to Flora 1,000 City 54 946 1,000
Description:
Pavement preservation project.
Status: Funding Status: Planned PE 54 6 60
2024 PE 2025 ON RW 0
Length (miles):1 Planned CN 940 940
Total 54 946 1,000
51 32nd Ave. Preservation-Pines to SR 27 1,000 City 54 946 1,000
Description:
Pavement preservation project.
Status: Funding Status: Planned pE 54 6 60
2024 PE,2025 CN RW 0
Length (miles):0.8 Planned CN 940 949
Total 54 946 1,000
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 17
Sporn, 2021 - 2026
Ili Six-Year Transportation Improvement Program
4000Valley Dollars in Thousands
Funding
Project I Description I Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
52 8th Ave. Preservation-Havana to Park 2,000 City 54 106 1,840 2,000
Description:
Pavement preservation project with select locations of sidewalk and road
widening,
Status: Funding Status: Planned PE 54 6 60
2024 PE,2025 ROW,2026 CN Planned RW 100 100
Length(miles):1 Planned CN 1,840 1,840
Total 54 106 1,840 2,000
53 Barker Rd. Improvement-Appleway to S. City Limits 3,500 City 20 36 644 700
TIB 80 144 2,576 2,800
Description:
Reconstruct to 3-lane urban section from Appleway to Sprague including
signal/channelization improvements at Appleway,and a 2-lane urban
section south of Sprague.
Status: Funding Status: Planned PE 100 100 200
Identified in S.Barker Corridor Study. Planned RW 80 20 100
Length (miles):0.8 Planned CN 3,200 3,200
Total 100 180 3,220 3,500
54 Flora Rd.I SR 290 Intersection Improvement 150 City 20 20 20 60
DEV 5 5 5 15
Description: Other 25 25 25 75
Provide new signal or roundabout,per adopted Planned Action Ordinance.
Assume ROW&CN after 2026.
Status: Funding Status: Planned PE 50 50 100
Planned project.Assume PAO contributions from Developers in the Planned RW 50 50
amount of 10%,City 40%,grants 50%.
Length (miles):0 Planned CN 0
Total 50 50 50 150
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 18
,,l2021 - 2026
s �� Six-Year Transportation Improvement Program
•OValleey Dollars in Thousands
Funding
Project I Description 1 Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
55 Appleway Trail-University to Dishman Mica 200 City 10 10 20 40
Other 40 40 80 160
Description:
Extend Shared Use pathway to Dishman Mica with north connections to
City Hall and Balfour Park.
Status: Funding Status: Planned PE 50 53 100
Potential funding sources:T1B,SRTC,RCO,LDA,City Planned RW 50 50
Length (miles):1 Planned CN 0
Total 50 50 100 200
56 Argonne Rd. & 1-90 Interchange Bridge Widening 500 City 50 50 100
FMSIB 75 75 150
Description: STBG 100 100 200
Widen Argonne Road bridge to 3 lanes southbound and improve sidewalks. WSDOT 25 25 50
Status: Funding Status: Planned PE 250 250 500
$15 M total assumes bridge reconstruction,rechannelization,adjacent RW 0
signal rework.20%City match,and CN after 2025.
Length (miles):0.1 Planned CN 0
Total 250 250 500
57 8th Ave. / Park Rd. Intersection Improvement 340 City 16 52 68
DEV
Description: Other 64 208 272
Provide new traffic signal or roundabout.
Status: Funding Status: Planned PE 80 20 100
Assume 2025 PE,2026 ROW,2027 CNI. Planned RW 240 240
Length(miles):0 Planned CN 0
Total 80 260 340
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 19
ore er
2021 - 2026
pOliarie Six-Year Transportation Improvement Program
ley Dollars in Thousands
Funding
Project!Description 1 Current Status/Length Total Sources 2021 2022 2023 2024 2025 2026 Total
58 Pines Rd. (SR-27)/16th Ave. Intersection Improvement 250 City 50 75 125
DEV 50 75 125
Description: Other
Add traffic control at five-leg intersecton,
Status: Funding Status: Planned PE 100 100 200
$5M est.total. Pending funding to improve five-leg intersection. Planned RW 50 50
Length(miles): Intersection Planned CN 0
Total 100 150 250
59 Barker Rd. 1 Boone Ave. Intersection Improvement 200 City 20 60 80
DEV 5 15 20
Description: Other 25 75 100
Provide new signal or roundabout,per adopted Planned Action Ordinance.
Assume ROW&CN after 2025.
Status: Funding Status: Planned PE 50 50 100
$2.8 est.total.Assume PAO contributions from Developers in the amount Planned RW 100 100
of 10%,City 40%,grants 50%.
Length (miles):0 Planned CN 0
Total 50 150 200
60 Broadway Ave. Improvements-Flora to Barker 600 City 16 104 120
Other 64 416 480
Description:
Extend 3-lane urban section to Barker Rd and realign connection east of
Barker.
Status: Funding Status: Planned PE 80 20 100
Possible partnership with WSDOT. Planned RW 500 500
Length (miles):5E Planned CN a
Total 80 520 600
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 20
2021 - 2020
S��'� Six-Year Transportation Improvement Program
40000tialley Dollars in Thousands
a1 Funding
Project/Description/Current Status 1 Length Total Sources 2021 2022 2023 2024 2025 2026 Total
61 Barker Rd.-Mission to Interstate 90 700 City 80 200 260
DEV 20 50 70
Description: Other 100 250 350
Reconstruct to 5-lane urban section.Improvements at Boone intersection
are identified separately.
Status: Funding Status: Planned PE 200 200
Planned project for 2025 PE.Assume PAD contributions from Developers Planned RW 500 500
in the amount of 10%,City 40%,grants 50%.
Length (miles):0.3 Planned CN 0
Total 200 500 700
62 4th Ave. !Pines Rd. (SR 27) Intersection Improvements 300 City 100 200 300
Description:
Install new intersection control.
Status: Funding Status: Planned PE 100 100
Est.$1 M total cost.2025 PE,2026 ROW,2027 CN. Planned RW 200 200
Length(miles):0 • Planned CN 0
Total 100 200 300
63 Sullivan Rd. 1 Kiernan Ave. Intersection Improvement 80 City 16 16
Other 64 64
Description:
Improve channelization and signal operations at intersection and
reconstruct intersection with concrete.
Status: Funding Status: Planned PE 80 80
$2M est.total.Planned PE in 2026.Assume 20%City match. Planned RW 0
Length (miles):0 Planned CN 0
Total 80 80
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 21
_ 2021 - 2026
SpO1 41 Six-Year Transportation Improvement Program
Vlley Dollars in Thousands
Funding
Project 1 Description I Current Status 1 Length Total Sources 2021 2022 2023 2024 2025 2026 Total
64 Sullivan Rd.I Marietta Ave. Intersection Improvement 80 City 16 16
Other 64 64
Description:
Improve channelization and signal operations at intersection and
reconstruct intersection with concrete.
Status: Funding Status: Planned PE 80 80
$2M est.total.Planned PE in 2026.Assume 20%City match. Planned RW 0
Length (miles):0 Planned CN 0
Total 80 80
65 Boone Ave. Reconstruction-Flora to Barker 75 City 75 75
Other
Description:
Reconstruct corridor to city standards.
Status: Funding Status: PE 75 75
Est.$4M total cost.2025 City-funded PE,2026 ROW,2027 ON. RW 0
Length(miles):1 _ CN 0
Total 75 75
66 Flora Rd. Reconstruction-Sprague to Indiana 75 City 15 15
Other 60 60
Description:
Reconstruct to city standards,including a shared-use pathway connecting
Appleway&Centennial Trails.
Status: Funding Status: PE 75 75
Assume 20%City match.Possible funding from SRTC, RCO,T16,WA Leg. RW 0
Length (miles):2 CN 0
Total 75 75
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 22
2021 . 2026
Spo' ne Six-Year Transportation Improvement Program
40100,0 Valley Dollars in Thousands
al Funding
Project!Description/Current Status I Length Total Sources 2021 2022 2023 2024 2025 2026 Total
67 Euclid Ave. Preservation-Barker to E. City Limit 50 City 50 50
Description:
Pavement preservation project.City may consider increasing scope of
project to improve road section to meet City standards.
Status: Funding Status: Planned PE 50 50
2028 PE RW 0
Length (miles):0.5 Planned CN 0
Total 50 50
68 Sullivan Rd. Improvements-Trent to Wellesley 100 City 20 20
Other 80 80
Description:
Widen to acid center turn lane,improved corridor access management,
improved lighting,and addition of shared-use path.
Status: Funding Status: PE 100 100
Est.$3M total cost.Scope based on updated to Sullivan Corridor Study. RW 0
Assume 20%City match.
Length(miles):0.3 CN 0
Total 100 100
27,983 28,655 22,199 26,253 26,371 40,273 171,734
Projects and timeframes identified in the TIP are to be considered estimates only that may change due to a variety of circumstances.
4/29/2020 Page 23
1 . Barker Rd . & 1-90 WB Interchange spo a e'er'
g Valley
•
k
F.s.*.
—
Project Type: Intersection Improvement
Project Description:
Partnership with WSDOT for PE of westbound I-901Barker interchange roundabout.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 900 2019-2020
Right of Way (RVV): 0 -
Construction (CN): 0 -
Total Cost: 900
2. N . Sullivan Rd . ITS Project Spokane\
Walley
•
I
_„�
i
- i_.: moi ' Sa a`y!_
4' _ .1,
. _ 1-- _
14;_-- 1 Al.... la I' ' ' -
Project Type: Traffic Operations & Maintenance
Project Description:
Extend Intelligent Transportation Systems conduit and controls along Sullivan Corridor.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 105 2017-2019
Right of Way (RW): 100 2019
Construction (CN): 709 2020
Total Cost: 914
3. Adams Rd. Sidewalk Spokane``
valley
I.
V
V . _ —
. 1.,i`' ' ! 4. j ' �'' i I' ,
-.t 11-- I.
1- - , - -
' iti , 1 ` ih_v.. 1--. • L 1 F'1 a . •I 1,.
4 { -
r' ;1 Q.`. %, • ' Err' 11 ' _ - .¢` `
fir. r • . in .- _ 1 ,, - -- -
.1 s • IF' 11 �. ,4
°r r xtiu p r---
iWiti
.,a '•- !�'_ .1 t..".4.......__ ya.M..1.:4,1. .i., �f`i�.i--- {I-•' 1/ ••..., }'f
r.
., '_r t , , a / .1 i i .�. .w M 1` 1,,,, t." I'r.Y M•1 r° - -i- ;...,',J. 0.'.4,-4,_ k. _ , `1. .Fle'� —.Awl,"
'4:1 i .. , = "' a e'J-•' t r. 1 r 1,'=y J Ifs i- •
_
h ' 41 a rola * •
` s.... .;
{F ' ,�f r . �F. -`• I rr_ i[r. .,.
,.. • s ;;,,," „. ,4 ,..., il 4*(7..
Project Type: Pedestrian/Bicycle Improvement
Project Description:
New sidewalk and stormwater on the east side from 16th to 22nd.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 40 2019
Right of Way (RW): 0 -
Construction (CN): 400 2020
Total Cost: 440
4. Conklin Rd . Sidewalk >Mtlley
•
Project Type: Pedestrian/Bicycle Improvement
Project Description:
New sidewalk on the west side from Appleway Trail to Riceland Lane.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 26 2019
Right of Way (RW): 0
Construction (CN): 155 2020
Total Cost: 181
5. 2020 Local Access Streets (Barker Spnl an `
Valley
Rd . Homes)
. " `� a I"'- ` 1. ' ' 'ti' { I Ilya u
•
•
ii
.� I. _ '11+-i. �. I+Y. �" I.. 1'11, A
. , t f r t It 1
4` / 1
a , 1
f'� I ' - II rF Y tli 1..-- i.;b c 1 � 1
rh. Y 1
II.
ri
' Y7nIT y
' Y� i ' I 6
r f ' ., III t ! V 1
`€' 1 1
'. 'ray.. _f 1 r=r A 1 i
. p sem.
X00 • .y. , ' t
t-, ,
•
lit
_
Project Type: Street Preservation
Project Description:
County sewer partnership. City to reimburse County for paving and stormwater costs.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 50 2019
Right of Way (RW): 0 -
Construction (CN): 1/50 2020
Total Cost: 1,800
6. Ella Rd . Sidewalk Spoi.n _
4.000 Valley
' k
! , I}+ 1
_ I.
I 1° I i
t----, _
6.4.- . ,
{ ti - 1d '
1 ' _
.illilir$01P - i' _ • f .
.. 0A1115,4 di' It
to iirPr: .414.1 . o 4 -, . ,fp, - M .
. ) 1 4 . , 1 , 1.01-'1 '
1 , .r4 .1), . 11 . 111%, . . ,.
fr
.11-- 4 k II .
• :
Ks_ I, __ l'o
Project Type: Pedestrian/Bicycle Improvement
Project Description:
New sidewalk on the west side from Broadway Ave. to Alki Ave.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 43 2019
Right of Way (RW): 0
Construction (CN): 383 2020
Total Cost: 426
7. Indiana Ave. Preservation - S1okane
Evergreen to Sullivan
.....*Valley
,,4.1 `� I•, -kms 1 r- r a - �° i •
1. 1% .• F
I i J. w 1 s•r`1 S. * At rt *,, ,lri }♦ •''l .1".,..-:1 kt•�i l ,"'' r
:It t ',,,
1 -4, L S. -
.` \.. 1
V F
'�i • - ,' 1 •• . 4Y .•. x ] •1 '1 -
I.
k
I 9,
Y:VI he c f j r fi y • 1 .
1t 111
4' .1.15'4.14'401-. , ' . ::C'''•'' ‘‘'.'4 ' I l' • .t i
J cis , 7..•• to ar�•{t,,-,4t 4. A ',4r.,_:*
4r.,:I }+
, + ,f LA-, n�,r I I-` 4 • 1 z•-.1 14,1`. R'at •,j� Y ,I{,'.-1.,.-st
,CIt II
' •
I
' # I 1 .1 r..c. C .r e �_ i1"- }•° ^_' �'=r: A. k Lars ,
Project Type: Street Preservation •
Project Description:
Street preservation project.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2019
Right of Way (RW): 0 -
Construction (CN): 1,900 2020 -
Total Cost: 2,000
8. Sullivan Rd . Bridge e Deck spokan`e\`�
Talley
Resurfacing
•
•
iti
a
I s
,
l �
s �' r A
C e 1 N. i
� � 1.
i
, ar + _
04
s J _ a
iiio: I { - J
•1
_fel wrir Fr_ F
• el
Project Type: Bridge
Project Description:
Resurface existing bridge deck on northbound bridge over UPRR tracks.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 68 2019-2020
Right of Way (RW): 0 -
Construction (CN): 270 2020
Total Cost: 338
9. Appleway Trail - Evergreen to SpokanValley
Sullivan
r !I, P. • I
,_ _ 1 -
l.� I - Ir
I i � .
� zF. _�� I - .._ It
,ski _ -
Ur I `'T ' I' d. P^_�� '\E+ rte' a v r t d . 1• 1 -�w-A . a i
rs
rZ-,1
'F_
.fit .l.- .ii i ._I . .–.-171-7
.._1 .. SS _ , ^�!.' ' - • , + '',V
Project Type: Pedestrian/Bicycle Improvement
Project Description:
Construct shared-use pathway along public utility corridor.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 145 2019
Right of Way (RVV): 0 -
Construction (CN): 2,250 2019-2020
Total Cost: 2,395
10. Garland Ave Extension- Flora to Spokan' �'
Valley
Barker
1 4 ‘ t 4 'I .-0r
1, d .-- -
_ 1 % LIti .*;
'1 I I I I I I IN i 1 y
_ I
_-
• - r+- II . . I ,
I'
Project Type: Arterial Improvement
Project Description:
Construct 3-lane urban section between Flora and Barker.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 0 -
Right of Way (RW): 0 -
Construction (CN): 3,000 2019-2020
Total Cost: 3,000
11 . Pines Rd . 1 Mission Ave. Spoa''
Valley
Intersection Improvement
k I •
,:a
A.— .7- _i
is _
r� M
Yt r
I.. -fin ,.11 _ 7,11112i61%
4 ; �_� 4 1.
1
' ; 1 G •ir I 4• $
0. ':
4. +
4' I ', i:r % 1 a''
- -- ► p-a
x ��,/ ' ► ! p, r i'I r 1
7 ! j} A ` il ill• 11 1 T y ` 14 44,'
�1. . tit- �;�j11 Y t1. ,�. - 1 M. i P. ,. ir
, , i "",:r . ::; '*"r, .t. t .-:. 1110 -•=. , , --
Project Type: Intersection Improvement
Project Description:
Two phases with signal and channelization upgrades (Ph 1) & additional turn lanes on Pines (Ph 2).
Funding Status: Secured (Ph 1)
Project Phase(s): Secured (Ph 1)
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 210 2020 (Ph. 1)
Right of Way (RW): 32
Construction (CN): 1,158 2021 (Ph. 1)
Total Cost: 1,400
12. Citywide Reflective Post Panels Spol�ane
Talley
(2018)
I .4101421_
,-
. u 1
F:
}a.,
- 1 4
IA t 1 I: 'R' r,
r4 -. V
fill '''''R. , ,.:11'. I ;'
4lir -'
+I
.-Vqii._ . - I R
1 - �.-J ;fir Mit q
:moi } r- I � I �. I 9 Il f
1,;401
i A - - , •, 1
-- vii Ste. _ r
94
fi
7
40
w
•
Project Type: Safety
Project Description:
Installation of reflective post panels to stop signs and speed limit signs on select streets.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 6 2019
Right of Way (RW): 0
Construction (CN): 72 2020
Total Cost: 78
13. Citywide Reflective Signal spo 'e``'
9 Walley
Backplates (2018)
r
. . primeit
1 a
�f
II
.. '1'• v �i' ,
I w i a N[
- 1 • *Y; ' r
Jr
1 .tom r t i-b L 1
. i; 1
Project Type: Safety
Project Description:
Installation of reflective backplate panels at select traffic signals.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 15 2019
Right of Way (RW): 0 -
Construction (CN): 165 2020
Total Cost: 180
14. Park Rd . Sidewalk Spokane'
—.s valley
1
i I I -1
i
« I I c i +' f
JI X.i I j,j
Nl 1
Id
.'.�. - a I . ,1_ }r
Iiir
Y
1
Project Type: Pedestrian/Bicycle Improvement
Project Description:
New sidewalk on west side from Sharp to Mission with potential marked crossing at Sharp or Cataldo.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 50 2020
Right of Way (RW'): 0 -
Construction (CN): 683 2021
Total Cost: 733
k'� '�'15. Barker Rd . Improvements - Spoane
.., Valley
Spokane River to Euclid
•i, y -
yy
� —
II -" -"'� i - 1 'F'. i 1
F" ► :• 3 i.
�.�� ,
II - �•" - -� '•� y, - t, • ,i�•
y a _ '•. ? 0iI-I'. I , I' 1 !
r _ � E_
Is r ..f � �•
„ _. .., ,' k l ' -; :
I 1•. 4 t `,. '�Rar 1 1 I i�.l� l �r I ��y- ..:
�1
m
iVI
lir`__ K `fes
I I' r I
Ili .
Project Type: Arterial Improvement
Project Description:
Reconstruct and widen to 3-lane urban section to east leg of Euclid.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 165 2019
Right of Way (RW): 195 2020
Construction (CN): 2,831 -- 2020-2021
Total Cost: 3,191
16. Sullivan Rd. 1 Wellesleypot anew'
Ave.. Valley
Intersection Improv.
"' 't t
4
I. �, 1 1 i
.ft i_ I_..41111L
tis.-
i
s
-.rill 0 . �.s, -.--.'"i
*APi
li 4 .
Y /4 4
nHt Y
eel
3_
Project Type: Intersection Improvement
Project Description:
Traffic signal and intersection improvement project, partnership with Spokane County.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 175 2018-2020
Right of Way (RW): 135 2020
Construction (CN): 1,460 2021-2022
Total Cost: 1,770
17. BroadwayAve, Preservation - Spokane
Walley
Havana to Fancher
Ii ,
* •+*
� r
'i` Ito 1 I . , .� rtrwarI ro Y, s
11 + til ��
II I I -- I
10
I I. I I —Y
11 ,
'I I
I
A
iI 1 I
I
II I I ,I 1 1
ii - --
11
11 �,_q � I : � II .
pij 111 r.
11 !
11 -
II - _ -� -
I �I f LL a
IIll ,
: ,I — I—�
Project Type: Street Preservation
Project Description:
Pavement preservation, including stormwater improvements as necessary.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2019-2020
Right of Way (RW): 0 -
Construction (CN): 2,900 2021
Total Cost: 3,000
18. 8th Ave. Preservation - Progress Spokane
$ Valley
to Sullivan
} Y �yF- . u
iw 'X yAdllfr 11111E.
i I
4 4, , .A
'404
I` Ili i i
�, _��Sr i , a r ip," i Y 1 - + «-
4.1
1 „ ._. . . i .e's „,,,
, Fm., Y u " t - � k.as, = .I. I�Y a; Ili}
`a-o! f1 } iI t E
+—,•.j w
+r
, 1 ilk , 1
4 i j '' — ON `4'. tit
._.- L. t .., \ hitirililitlibtl
F-
W 1, i 10.* , ,TF..
Y
rio- 1 ..1— - — r- 14 ':_4, 41--
.:.„,. „., - ,
, : . _,
i , r—r-Auro-- ree
,,, sp, ,
It* --4, • i- ems.:. r
Project Type: Street Preservation
Project Description:
Street preservation with potential sidewalk extension and partnership with Vera Water & Power.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 50 2020
Right of Way (RW): 0 -
Construction (CN): 650 2021
Total Cost: 700
19. Park Rd . I Mission Ave. *mane `'
Valley
Intersection Improvement
Project Type: Intersection Improvement
Project Description:
Improve channelization and signal operations.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering(PE): 100 2020
Right of Way (RW): 60 2021
Construction (CN): 1,172 2022
Total Cost: 1,332
'ems'20. ApplewayBlvd . Stormwater siolan
Valley
Improvements
1•S.Sy r i 1'
I. — I i C • 1 ii 1 �' iII - i` - ' -
7 a ii i1
,
-
-r .V ' ,4 "` 1 1,- � 51'1..1• -
..... .. . , ,._ ... .._,. . ri _i,
„, , ,.. _ I. 1 '4 I" v
0"..-,gra, r V, ,, —- e IT ,• y, 7111' iit
F ,
ti
- i _is - - ' 'v-k. Vi iI• �- r.� jilt, .'j ,�..
-
..- - I
.4 ' — ' r&U, ' i V:0 —..—..... ..-i—t
6
y 1__ r e�
,..44fi;1, is ,— i I 1
1 a .. I ,
Project Type: Stormwater
Project Description:
Improve stormwater facilities between University and Farr. Funded by Dept. of Ecology.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 150 2020
Right of Way (RW}: 0 -
Construction (CN): 850 2021
Total Cost: 1,000
21 . Pedestrian & Bicycle Safety Spokane
Valley
Analysis
k
,
'r
, I . a� p - .
i •
1 a
r.
La. ' * i ft'' 1 ,
•
, , . r 4 _
Rk
II', P' 1 r �,iliii - _
1
'IIF � ,
1
l d' _ '.' :., V _ u; ,*i 1 ill. _
*� �.
Project Type: Safety
Project Description:
Evaluate vehicle vs. pedestrian/bicycist crashes, as identified in the Local Road Safety Plan.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 50 2021-2022
Right of Way (RW): 0 -
Construction (CN): 0 -
Total Cost: 50
22. Barker Rd . at Union Pacific *mane
Valley
Crossing
•
•
{
- 4
V,
,i
I } 11
0441 •
I • I,
Project Type: Arterial Improvement
Project Description:
Recnstruct and widen to 3-lane urban section at UPRR and E. Euclid Ave.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 85 2020
Right of Way (RW): 50 2020-2021
Construction (CN): 1,299 2021
Total Cost: 1,434
23. Sullivan Rd. Preservation - Sjo
"Valley
Sprague to 8th
1'
1
I t `' Y II Hr - Y;1 � , I
ItV r F r r- I
II 11 I i
• _ I 1 �I w i t I
F d • . + 1 11p� 1411 IA
_ �..1 ?` I
a. r r ,TT""r I , 1 lits
.m - f ' II ..,i�� •,..it 1 I - I- f-
r •
f •C ,j • "+1- 1 '.0 0 _ - I _ r
y
- -41 , _ I;
i- r1 .. ' _. - -" } I I f 1 I. , r - II
Project Type: Street Preservation
Project Description:
Pavement preservation with signal, sidewalks and stormwater improvements as necessary.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2021
Right of Way (RW): 0 -
Construction (CN): 1,300 2022
Total Cost: 1,400
24. Sullivan Rd . Preservation - 8th to spoke``'
Valley
16th
r ;� I ,.
i _.
E, ,a..a : .,f'
' 1_
; + I MP
:• r ' ,
• A f� — tet.
I
s t I' ' !S r , It ,I l'
i • ,
� j-.
= J4 4 1 ,',.,e. t•1141, I.
of -- I4 i - r 'y,:. .. moi,.. r ,.
Project Type: Street Preservation
Project Description:
Pavement preservation with signal, sidewalks and stormwater improvements as necessary.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2021
Right of Way (RW): 0 -
Construction (CN): 1,300 2022
Total Cost: 1,400
25. Argonne Rd . Concrete Pave. - Spona e`1
Valley
Indiana to Montgomery4000
•
_
� „` + _i'
r
• t �-" ,fit V'�
*PC ME' I;-
,
;
;
; l
Project Type: Arterial Improvement
Project Description:
Reconstruct with concrete and improve signal timing at Montgomery.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 125 2020
Right of Way (RW): 40 2020-2021
Construction (CN): 5,000 2021-2022
Total Cost: 5,165
26. Evergreen Rd Preservation - Siiokane`
g ,,,„..00 Valley
Sprague to Mission
it
1
�' 4
• ! S
_r----- --,`--. .._�._-' -�-- + I 1 - i t
I'
r - 4_ - - V r —� \ - �i 1 _7.1. - -
._i _ - ..' .1, ,j it i • ,
_ y - ! 1 ' ,
L —e', ,. r r r, I
+ _ I• - 4 _we"
, 1 ,Y f4 !
04 r Y -
i
I" r I i r lit , { { 1lekiloi�' •'dill W . "
_ 1. I r. I L{ -1 .— — I� _ f I'. t-. I�': 1 ;{
h4 s _A h I:_ l� l
Project Type: Street Preservation
Project Description:
Pavement preservation project.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2021
Right of Way (RW): 0 -
Construction (CN): 1,900 2022
Total Cost: 2,000
27. Balfour Park Frontage Sn��
valley
Improvements
rF` L__ - ,
•
6 4. iik 'tv, • ,_,:.,
- . j
t
II�1 , -797
t,
! , ;..-, I . ,L f
_..., - , .rs -,.
No
It
R
Project Type: Street Preservation
Project Description:
Pavement preservation, widen paved shoulder, install curb and sidewalk on Herald, Main and Balfour.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2020
Right of Way (RW): 0
Construction (CN): 1,900 2021
Total Cost: 2,000
28. ue S ra Ave. I Barker Rd . *mane
Sprague 'galley
Intersection Improvement
Nii
. , , ,L,
rl
J ,
14 ...,..
p_..„,
i
Project Type: Intersection Improvement
Project Description:
Provide new roundabout and with sidewalks and bike accomodations.
Funding Status: Partial
Project Phase(s): Partial
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 165 2020
Right of Way (RVV): 270 2021
Construction (CN): 1,835 2022
Total Cost: 2,270
e..••\-._29. Sprague Ave. Stormwater Spolan
Valley
Improvements
R
1
1 . I ' *TiLj:illiiii '
..a ��
rr
ti 7C _
. 1 ��® I I
1_. _ ;� 1
I il
44
11
-,--:.-: ::: , , .
1 .
Project Type: Stormwater
Project Description:
Drywell retrofits between University and Park. Funded by Dept. of Ecology.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2021
Right of Way (RW): 0 -
Construction (ON): 1,900 2022
Total Cost: 2,000
4..."\......
30. Wilbur Rd . Sidewalk - Boone to siiokane
....."Valley
Mission
i
k i '' — -1, 'il:1 4.'2;4 t• I ' •••,/11:-" — 1_ 1
. Ili-)t*C'IT•I••• r- ,,i ..r '......f„...., i - i -7, ,i i ,-0*-i ,,,,,,. , r r ._.._
,.„.
.. 4' i.. '•. '
,- *- -1 .„- r- r , .4
1,,5 ,,- •. -.. r- Fi., - 1 ,r-0---" , f., „...
, ) ,j -1 .. . i 1 - 1 ,
! IP _
t-1 ,4 t 0. r ..-,- .. r:„: - , -- r
44 • --
. 4- 1 it". : 11.1,-. — .1'' t, .” : t'd; e'.* r 1......,.. .... .--.0 ,
t 4 :'
"1,' ' t . --17 ;'' '. ,.., ''•6. - - ..
I* V - I V
-'; ..... .,
!
- - '
- ii• ' it ',,,,.. r ..' , ...- ii,-.: '*—' • ''
(----6 ,'- , .'• -, • .___ ...1".". ': — ' ' fie
- tiol 1#— t
i.1 ;„.,.. ,se... •- ,,,,_ . °, 41 . l' ..„,,_ , .
o ,
.
l .
rb
,_ • • '--,, — _' •
1 - I
I . i' r• . ___ -. II
I P. .
0, t
I I „ , .
1
1,1
' • I
• 1 .
I
--^:••••'‘
. I .
- '' • :-. r I 1 i .
. . , 1
i 1,
, ...
Project Type: Pedestrian/Bicycle Improvement
Project Description:
Install sidewalk from Boone to Mission on one side of road.
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 60 2021
Right of Way (RW): 20 2021
Construction (CN): 564 2022
Total Cost: 644
31 . Barker Rd . I BNSF Grade Sraa`
Valley
Separation Project
✓P
�r
y�
m p`
a p0
� 9
I „
i -B
}I 7
I _� 1
,
d.
Project Type: Bridge
Project Description:
Construct Grade Separation at Barker/BNSF RR/Trent (SR290).
Funding Status: Secured
Project Phase(s): Secured
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 2,595 2019
Right of Way (RVV): 2,545 2020
Construction (CN): 21,030 2020-2023
Total Cost: 26,170
32. Pines Rd . (SR27) I BNSF Grade Spokane
Valle
Separation Project
t• r r ,
r
t
y t
11�
,I.`1
r i
aV
if
Project Type: Bridge
Project Description:
Construct Grade Separation at Pines/BNSF RR/Trent (SR290).
Funding Status: Partial
Project Phase(s): Partial
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 2,494 2020-2021
Right of Way (RW): 4,700 2020-2022
Construction (CN): 21,800 2023-2025
Total Cost: 29,000
33. Sullivan Rd . I SR 290 Interchange sp�okan��e
g valley
Reconstruction
. . - ,
} ' 1d o•* r r4 I.,. 1' ;
41 .sem • ,
• i k�
`` .. f .r+; if: l'
i _ rte.
•
i •
y,l.l i 'r.
, rf1.400.00.40,61°M.I.AIL lio 4
,
k a4 f
, t , - , Iiiii4"
1
Project Type: Bridge
Project Description:
Reconstruct interchange to improve safety and capacity.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 2,650 2021-2023
Right of Way (RVV): 1,380 2024-2025
Construction (CN): 22,600 2026-2028
Total Cost: 26,630
34. Street Preservation Projects - Sjo ....,"\,.....
ane
$3M Annually
.....0 Valley
'*1 I 1 II
i
I I SO I 1• 'A ',,omit ri, _
I
, vogimillbs ----:.
r
r r i ,
.k:++ a C.
_ ! 1Y , ill i,
0, --, a w l 0 I. I i
•
. ,. ir, - _ _ , [I-
1, PIP141# I' !", a { r ,
- _ _
y4/• *',r . `
I
'I '1__r..*. Vr 'i: _ , -
Project Type: Street Preservation
Project Description:
Preservation projects, typically arterials or collectors, or used as matching funds for grants.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 500 Annually
Right of Way (RVV): 0 Annually
Construction (CN): 17.500 Annually
Total Cost: 18,000
35. Local Access Street Spokane
Walley
Improvements - $ 1 .5M Annually
t
42.
ifi ..- ,..,
L /0` 11 ,
'' 41e '1 - -----.
, V
1 1; IJlM1 ul1
.
.11
y ori.-- •
, l tI.
i , ,,.,,,.
I B !I I l l I 4 , l ,16
, ,-,- _ L 1 , r I ! . .111=001 . .
I _
- __ -
'T _
Project Type: Street Preservation
Project Description:
Funded by Street Wear Fee. Project type varies (surface treatments, grind/inlays, reconstruction).
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 600 Annually
Right of Way (RW): 0 Annually
Construction (CN): 8,400 Annually
Total Cost: 9,000
36. Citywide SafetyProjects - spokan �'
.0,000 Valley
Biennial
f
tr lir
I ' *, - ligiell. I 1 r c I '
w
F--- 7.11 1 , ,
,,
, ...._
ilf ' Asti _ - -
1
I E
el
Project Type: Safety
Project Description:
Projects are consistent with the City's Local Road Safety Plan. Awarded projects specified in TIP.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 Annually
Right of Way (RW'): 0 Annually
Construction (CN): 1,700 Annually
Total Cost: 1,800
37. Sullivan Rd Preservation - 16th s lot'
Valley
Ave. to City Limit
,-.i . .
I
'1
l.,' 1 - - � - 1 .I I�� 1 'p. - i -
.
✓ .
- - 1.,,,.....1 - .. ty-�,4 .l: -
I. - 1
. _ I _ � ,.. ,
E -
Project Type: Street Preservation
Project Description:
Pavement preservation with signal, sidewalks and stormwater improvements as necessary.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2022
Right of Way (RW): 0
Construction (CN): 2,100 2023
Total Cost: 2,200
38. 8th Ave. 1 Carnahan Rd . S e�``
o'S Valley
Intersection Improvement
,,.. - r. i, IP ` �'
i V or
G.
+lir:, ,.. ,.. J,1---
_ Imo`_ `_ r_
I - liI
iii, I
h
1
Project Type: Intersection Improvement
Project Description:
Add intersection control (turn lanes, potential signal).
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 175 2022
Right of Way (RW): 250 2023
Construction (CN): 1,575 2024
Total Cost: 2,000
39. Mission Ave. Preservation - SjO1 ne'
Valley
Mullan to University
`- -t, ` m ate.: i l
t• f f' �< '�� -, , i,v r 1
'f _ � ... Oil J 41. 1,.• :-' ... _ `�'� I- .
W r �- I .r'
. " { ►f I i I . "i.. i,
* 4 .-_ fit i'•,1 , �I
L I .l�.
_ _ . - -
I
ter__ r
Y �" .-�_^�--r' - a �� t i 6 r_,r---1 a
'Ire _ •_. '- . I +' , ..I .. -,-_ _ ,.�- l I..t 4[ '
- - *~F• •• r . 'JI} - a rte I.•
r: +
< 4 I, . I _ __ r •* I r•;.41 R I v - -
i ), , . �' �� .. .ter .� 4f .
•
T L. 111 _,. , _ I•• 1,.
1 , ."
,' it '�i
/q
-kms - F '' A _, 1:.-„?...--_----,. - . _ I,..I
� � ' _ � .11.:. • II.
f • � I
40 1.4. L=amv v • .
sll�
j.., 'v
Project Type: Street Preservation
Project Description:
Pavement preservation and possible widening project with stormwater improvements as necessary.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2022
Right of Way (RW): 150 2023
Construction (CN): 1,750 2024
Total Cost: 2,000
40. South Bowdish Rd . - Phased spokanes.....
.Valley
Corridor Improvements
, .., , .i i_ , ,, in --,- - - _ lc_ ___;____ -, ._-__- -,,,. ,I,L,-._=-_,,i_iii_Ei .71 ,I
1 ;R ` _ Mui, 0 "LU 1.--'`
L. : ' , ` . „ 1..1'aim - amisisimi . _ _'.,._,_ f r - ___i _ :,-
)`•.- if, — 1- I " , -- ' --lim "I, ,•,_ _-•,,,,,...1 '..2_41,iiirr4--• ''.- •
i1' Tr'., ., - ' mow- 7f . , ®` . . ` :L )
,.� r-,
k • }' I 41, %,A,-.-
, I yam' ( om
fir _ moi` �,1, ;:' I
r ;,t , ,
Project Type: Arterial Improvement
Project Description:
Reconstruct Sprague to Dishman Mica as a modified urban street with improvements at 16th/32nd.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 1,000 2022
Right of Way (RW): 500 2023
Construction (CN): 11,500 2024
Total Cost: 13,000
41 . Dishman-Mica Rd . Pres. - Schafer Spo ' ''
.000 Valley
to S. City Limit
r!
y ` -
;+ ti l I I
1 ,
.y
i Alt 1
■■
700 le -, \,_. ___1_. . .
i s Jy
f J c41 111 ' I • 1
'...,,-.,1
a., ' -. ' qtr. !sp - ;.
- 4S.I' ' V -
•
- . 0 ga ,
.,11' - - . . - 4 -. ,, -3,. ';t,-W-o- 1 1 , $ 1 4, ' , '
i
'I . - , . -r MI f - r• !
Project Type: Street Preservation
Project Description:
Pavement preservation project.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 50 2023
Right of Way (RW): 0
Construction (CN): 1,250 2024
Total Cost: 1,300
42. Mullan Rd . Preservation - SSiokanr '
Valley
Broadway to Mission
.t• !y^ 1 • , ' • M �.� ±II�. `_.�__•�. •_.,- 1 . ,.. li-•
- �, _ I , `I
•!+!. _ fir . - ...
0
ir, . ii.
,.
• - 1 rt
�� - k ,
„, , , , _. no ,j ., 14,.... „ ..... _4:- 1.• _1 ' ; :. L)=. 11:
-_-_________-_': ' i. • ' ::-* ' ' ' I'
I
in
. Ilfse _,,,,-. , , ,,,„
i 6 IC '.. ;IC ~rt I ' I F ins � 'i�. 'f
. . L. .
t " ; 4 ,,.
Ivo
i , ,
t. . . _ . ..• "I.
Project Type: Street Preservation
Project Description:
Preservation project with conduit for future ITS infill, signals improvements at Mission.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 149 2023
Right of Way (RW): 160 2023
Construction (CN): 1,091 2024
Total Cost: 1,400
43. Mirabeau I Mansfield Intersection sizkane ''
,-.*Valley
Improvements
'`--.Ilt 44: . ,)
><000,
'E ,. ll1Ar+,
ru. ,
s tisso(Ni
ice.
;r
Project Type: Intersection Improvement
Project Description:
Intersection capacity improvements.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 120 2023
Right of Way (RW): 100 2024
Construction (CN): 685 2025
Total Cost: 905
44. Barker Rd. Improvements - Spokane
p .000 Valley
Appleway to 1-90
M ,Ir yam --r. . ' - S� i.ii i I'N •1 -t Y1 x'
" n �} 1
t i r ,r; ;
.# ; , , # rr.11!,Irij}.1t4,'il,'pl ' Il�t. Y .
i ..- iff -':-;11 lat It r .t.tr-r, . p ' l r
L. .� II
- k .' ,1, " iy 4 i t y ?.++A ,,i. _ f - tri ..-. S
r- r t,19 - 1•a 1 I a F t �.` " _ j {t y'� ,L -r--41'.i.:-
*r i L� �� t
1 IT " III ` , , ' i; I � ^g t d I
.
..' It iA11
' -1 ' it , .4 i n' .;I` _ 1.
I df FItt-. rte.- .a. .. _ '
,,,i'. .Y .r'
LI
Ma '
•
Jt 4!... 1 - YAC j �
. 44+. - - FI� -
Po„ _ .. 'k „
I.. _1=r _• �. __•
.. r4. . -
Project Type: Arterial Improvement
Project Description:
Reconstruct 5-lane urban section with alignment/channelization improvements at Appleway & Broadway.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 1,000 2023
Right of Way (RW): 2,000 2024
Construction (CN): 3,500 2025
Total Cost: 6,500
45. Flora Rd . Reconstruction - Euclid Spokane'
Valley
to Garland
I I. , 11;"7/11 ; ._..=-.- a r
. II r -
I _ t 19 'G' 1
r _ Ie
— _ -' .4-11 -7.-
_ e
�� Imo - -t _ ��� - + --- �Y�llI ` Y�
I
+ ,,, 1 ,
1 '.1; _
Project Type: Arterial Improvement
Project Description:
Reconstruct to an urban arterial section in partnership with Spokane County Sewer Extension
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2023
Right of Way (RW): 100 2024.
Construction (CN): 2,000 - _ 2025
Total Cost: 2,200
46. Park Rd . Preservation - Sprague Spokane
valley
to Trent
I i 1. �, I . _ __ - ,,, 4 - ,:
ifs"- -- 1 y. - _ ' I!
_
'Y
1.10. .• lit ;,,, µ J= ,' r."" ' . . _ :I, , T fr i.
1
_ `y
1 .- . , _ Y
•
�Ys X11, 1 1.. �+Ird� b Y _
rpm
x
r
F
C
r--�} U a __ r-_
i I A. L IlI °.: L' - A
'" 7[� [I J 1, ! • _''.ems ) 1,-,„. � i
j 1111.1
G_
I .
I ..I , 3'- ' ..-ff1 -!• • _ r, — -r . - _.
y`r° 1r . I. r. : .3•
, I
Project Type: Street Preservation
Project Description:
Pavement preservation project with potential sidewalks at select locations.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 70 2023
Right of Way (RW): 30 2024
Construction (CN): 1,200 2025
Total Cost: 1,300
e�`'47. Vera Crest + RockyRidge Street spokan
.000 Valley
Reconstruction
,. - ..... .„--, - „,,, ... ....„.... . ,, . , , , a - 1, . f:g,.• .._ ' ' ...i.
i i4 .31i
r'• fM , ■rr r M `Ifalinii rir. ...,k f� �—t' kt—Iiiiiiialtjii ffirl --' - — , :f. `- s�` it W
fi Y'�P, -�" If maw ■■ — """ 11,...,-...;
III
_ , , _. Tr"
. Agi _ ___ • __, _ ..i._ 1 i LE _
-� - *.L:0411-11- ` 0 I.LL. L_-, -' ..-.-
pyri
iff
,'. ' a L. �I a �` t i i=ar = - `in.-i r ■ \.flL7y;� , , ""14
1 . �,.,
il! I i
ll'ir 2 i ilf.1111-II.' -'.. . -' '11j'''
i 13
�i . 4V"' _ til�.�S � 2"rt s a i ail i.. / gig' f, _ 1'"
M1
ii,i- a'
r. '- p Iii
I l g� 1.'d A L 1111 I ,
bi
SSI, i 1 ) 1
M 1.�
..,
q, �: : -,
in
i� � r.
Project Type: Street Reconstruction Project
Project Description:
Stormwater/road reconstruction in mulltiple areas: Kahuna Hills, Heather Park, Ridgemont Estates.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 150 2023-2025
Right of Way (RW): 0 -
Construction (CIA): 0 -
Total Cost: 150
48. Barker Rd . Intersection Spokane `
Improvements at 4th & 8th
.Valley
11 r r-4. 4 r, r a t ; Cf I: !17 I I "
Y 4
' i I.., ! r ... I' ! II
' ,. - „:. .. - , , ' T. :*%4 I 11
i
r' -i+ _ r !' r— �~— •
� 'r.:,1,-1 F` " - 4 - 1 ,. ..r r`- `` ' '� - '.I. i
- - :1 , — _
f r',r
• �• i� r-
s - @. K.t40 �_ {yam
t r (
L.
Iia ` I •r0• 1+
..•-• r d., 1 +xt iI . —_
I i, 1 F_ i- ! -
Project Type: Intersection Improvement
Project Description:
Provide new traffic signal or roundabout, per S. Barker Corridor Study.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2023-2024
Right of Way (RW): 100 2025
Construction (CN): 3.300 2026
Total Cost: 3,500
49. Cataldo Ave. Realignment at Spokane
`''
g Walley
Barker Rd.
9 �. + :r*-
{ ,► I
14, ..
t
''1 I .', 1 II I
rdtb �
r, r'r - ,♦. I t I�
I
I
+ I Ii
1 - =r _- ---
Project Type: Intersection Improvement
Project Description:
Realign Cataldo Ave east of Barker to Intersect Boone Ave., per adopted Planned Action Ordinance.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2023-2024
Right of Way (RW): 500 2024-2025
Construction (CN): - 1,400 2026
Total Cost: 2,000
ke `'50. WellesleyAve. Preservation - Spoan
Valley
Sullivan to Flora
,, ill FI. '!" • y ‘ , i! . , ' 1;7 - , I i t 11
I.
.. • ` AA, 1,r � ffi, ,y%4',,, -,1,..1I' ;1'+1 ,.1„> . t* r `, i ; .,
I
• 'II r 15i4 .. s .K w
3p' L , r
I •, r.. .
r, 1 4 p
...'-•-••••1.••. N
Project Type: Street Preservation
Project Description:
Pavement preservation project.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 60 2024
Right of Way (RW): 0 -
Construction (CN): 940 2025
Total Cost: 1,000
51 . 32nd Ave. Preservation - Pines to Sjoka e`
Valley
SR 27
-- k II Ir. i- - f ., 4!1 1-•i,v�• il— efi !� -a II t
\ Y
,: i" y R 4 yJ �,t l
r w 1 i; - CJI / if I `�It�r I L�7 l l i. -.
rr
a i
Project Type: Street Preservation
Project Description:
Pavement preservation project.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 60 2024
Right of Way (RW): 0 -
Construction (CN): 940 - 2025
Total Cost: 1,000
52. 8th Ave. Preservation - Havana to Spokane
Valley
Park
ii:
, , . ' If F . _ , ,,
. 7._ _
_ _ .1 �. +`;
1 11 , --`I A.. ---— 4.1 0••_,..Lir,, ." ••• . r.milL
yf 1« .wa a\.I I t1 i 1", _�I�,II} F a I _1 YjIn�Y .I tt y r
1 - I
- v - i—
- • . . , - - , ir-,-F, ,,,,, ,
_.
_ IFt,gP
'� .
, , ,
__, 1
R 1 .,
rFe —
11,_
�tlI _ _A 411 _ - ! • r . J. 'y{I,6a
' • `■ _.-1- a .,iii.',` -1 � _ +►
Tit 1
jI -a�
E .frit ka_
,
L.rL 1 �r
Project Type: Arterial Improvement
Project Description:
Pavement preservation project with select locations of sidewalk and road widening.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 60 2024
Right of Way (RW): 100 2025
Construction (CN): 1,840 2026
Total Cost: 2,000
53. Barker Rd. Improvement - Sfi k1 e
Valley
Appleway to S. City Limit
1
1
, .1+' r.. i� - H ri' - 11.. II
.. .f.. IIS — *r F. I
I
I ., � .tib..._ `I. —_
�� ' I °
•
r `r` I
q �*. 1
0 ', I .g ..re
1 1 rp _
$m
° r v
1 1 ,
Project Type: Arterial Improvement
Project Description:
Reconstruct 3-lane urban section from Appleway to Sprague and 2-lane urban section south of Sprague.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 200 2024
Right of Way (RW): 100 2025
Construction (CN): 3,200 _ 2026
Total Cost: 3,500
54. Flora Rd . I SR 290 Intersection S o 'e'``
Valley
Improvement
_ I -Il ,,,
rot. -2
h
-7:4. - it
. , : &is:. te
it
J til
OS1
1V
Project Type: Intersection Improvement
Project Description:
Provide new signal or roundabout, per adopted Planned Action Ordinance. Assume ROW& CN after 2026.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2024-2025
Right of Way (RW): 100 2026-2027
Construction (CN): 3,800 2028
Total Cost: 4,000
�'55. AppNews Trail - Universityto Spkan
�s Valley
Dishman Mica
r _ i
. , ,. _ -;61
' ' 4 4) '--_1 ,
,),_..... . , ,.
, 'ma 1 ' ' - ,3 , i . .
� . �i, , R •
m
�' l I }Y _' R n y.
411111.11.111111111.1111.1 -. .
1 , . l'uou-AiiikWef 3
I,'
I
Project Type: Pedestrian/Bicycle Improvement
Project Description:
Extend Shared Use pathway to Dishman Mica with north connections to City Hall and Balfour Park.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2024-2025
Right of Way (RVV): 100 2026-2027
Construction (CN): 1,800 2028
Total Cost: 2,000
56. Argonne Rd . & 1-90 Interchange simane�`'
Argonne Valley
Bridge Widening
•
Project Type: Bridge
Project Description:
Widen Argonne Road bridge to 3 lanes southbound and improve sidewalks.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 500 2025-2026
Right of Way (RW): 0 -
Construction (CN): 14,500 2027-2028
Total Cost: 15,000
57. 8th Ave. I Park Rd. Intersection Spokane�`�
Valley
Improvement
I 1 ,- L 6 1.
'11 '1,N.H. .r :A,. ,
'""t Vt.'- • ..%.
4
...„ . ,,,....., . .
I „.-:„ ,.., „, .._.r.. • -
III p
I1 - - ,, ,,, 01,
t
Iiii, M
ili 4
- - -^ . ,,
14 i
k"t t Y
• r • it.f7. lip
lj II; V:-.
N
0
I 1V
•
Project Type: Intersection Improvement
Project Description:
Provide new traffic signal or roundabout.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2025
Right of Way (RW): 300 2026
Construction (CN): 2,600 2027
Total Cost: 3,000
58. Pines Rd (SR-27) / 16th spoka�ne�'
Valle
inImprovement
� �
I ntersect a
r r--° I,.
t
# _ fir, , I. F Tf_U'+` o. .. 7
4
},.3, f
_ y
3
I t c ; °I t F
S al
Project Type: Intersection Improvement
Project Description:
Add traffic control at five-leg intersecton.
Funding Status: Partial
Project Phase(s): Partial
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 200 2025-2026
Right of Way (RW): 100 2026-2027
Construction (CN): 4,700 2028
Total Cost: 5,000
59. Barker Rd . 1 Boone Ave. S1 o.000....--e\......
Valley
Intersection Improvement
} ,, _ .
, I! F1
1 1 I F 1 +. ,
f
1.. i, 1
ri. I- V .II
. , it' 1; 1 I 1 ,. . ,
I l'il -
1
r , , , ,
il q..
,. .
' „pi • ,4i,,, V .!,:AA In “ ,
.I .�k
i , _ .
,
p
t - '� S ' •
1 sem-
ft
"k 4
Project Type: Intersection Improvement
Project Description:
Provide new signal or roundabout, per adopted Planned Action Ordinance. Assume ROW & CN after 2025.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2025-2026
Right of Way (RW): 200 2026-2027
Construction (CN): 2,500 2028
Total Cost: 2,800
60. BroadwayAve. Improvements - spolian '1
.....00 Valley
Flora to Barker
,l,„-...-.7.. ` • a-.4 iit I
i - , . - • ir ate .. ! L ••—'
t o 1 ? Y t , , ill ,
- -w - I 1 l
1 —
a 4 II4'4 '4 ' ,r. I — . • tilivil 1-I. I'
s
91 1 —
. r ,
I 1 i.^LI .r - '� ,� `(I .,.;.1� ' r,,.l i ' 11. _ ��- 1 - '1�-
1. 1--....L It;_ .t w 't
4.':;,1•
'I -• t , .�do, ' #r- I _.F s� '1 .*. rr (..I. i..
I ir 1'{i "�1
. ' - -
. '�° 1 14 [1
yam,}� =� r — ..
i 'li --_ I l all .,! ♦-. *•�• +.. I 1 #''r', 't ..I ill. �+
.41 —
I r A. — r ,e �, r
M
I to r'
is 1Z ' y .�f!1 r -M
l _ J
1'
l'
I I ' i
: --
,i �,1t[J ,Suja�J1+7 SW.__:,-;51.-- E •._ � — lR T, � II
r: k
Project Type: Arterial Improvement
Project Description:
Extend 3-lane urban section to Barker Rd and realign connection east of Barker.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,400) Schedule
Preliminary Engineering (PE): 100 2025
Right of Way (RW): 500 2026
Construction (CN): 4,400 2027
Total Cost: 5,000
61 . Barker Rd . - Mission to Interstate spo ane
.*Valley
90
` AI r-«�+ , AL1:. " j,l.. _I � ice', I: p,l !.,,- ., I r - -
fit. , M^S_- W _"`�.� .,re• r. • 1 '_-,Y••'•' k��' • I • _ {a<.�.'.' '
_ _ , - ,i,
� .' r••+' r.'I .- +rte' 'ry : I ,4
-; I. ...
ow n . 1• , �'' 1.'
•._t ,, +S I lx-r,1, 1 ir• *k rc lc-
t I - - I,. I: l I_
4 I, `.- Yom. -'1,"
1y:. 1-.{ !I— ` 't - { it.n T'',--- « . 11 1'
.e + I'
I
'''iLl'i• At 1_ i*. 4.44 ,i-...,-- - . i
;Y ;, • .2 1. , .. It 4..1,, I 1: Al II i •,,I •
.rbc I' !. lr R , I l .�7 wry A in
0�> �!
a
t
'1Q: 1 �+A 6- ' `
6 • n t ; � i p ai 3
I' �1 I a
- .:'i
I, i 1 1
iiht', - 114111111 'z
Project Type: Arterial Improvement
Project Description:
Reconstruct to 5-lane urban section. Improvements at Boone intersection are identified separately.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1000) Schedule
Preliminary Engineering (PE): 200 2025
Right of Way (RW): 500 2026
Construction (CN): 2,300 2027
Total Cost: 3,000
62. 4th Ave. 1 Pines Rd . ISR 27) Spokane
Valle
Intersection Improv.
.....00y
a _ 4.. ''
{iii , i ' __ w Oda,
, y i
3
i
.- - f 3 i t
Ili r. I - I {--.
,_ _ -
•-- {{ ,it� 1p 7- I
1,liP
h i - Vii,, {,�• - k•' 1 ,-
A ".-..11 tor , :
LI. Nr4108011.114' i
11 _ I , p, „,....„i•rfri ir- 1 , . ., , T . i h
4. .,
.,
wt,...,
. .,4 t
"aw - i f slw
, . 1---- _
. , ,a.,
1
.t.
. , „
., . re•-- --
I: - 9.
• 1.4.;-.4 P i ' 4
` ti
Project Type: Intersection Improvement
Project Description:
Install new intersection control. Price assumes new signal and channelization.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2025
Right of Way (RW): 200 2026
Construction (CN): 700 2027
Total Cost: 1,000
63. Sullivan Rd . I Kiernan Ave, S1okanne
.000 Valley
Intersection improv.
1 ' ik:
TI�'`; 1
" + , Y� I
. l' , ti r .-I ,
i.--, -• ,(
i
_ t- 'fit
,'- 1 _ q
R,
4
. la 6 er r .
, , , ,
, I 4 P. teitilli 't ,,1 -
, i 1
Project Type: Intersection Improvement
Project Description:
Improve channelization and signal operations and reconstruct intersection with concrete.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2026
Right of Way (RW): 100 2027
Construction (CN): 1,800 2028
Total Cost: 2,000
64. Sullivan Rd . 1 Marietta Ave. mane
Intersection Improv.
alas..s Valley
M^'
.t
I
f_ _ i �r f.'. ' ..
'
t.
it ! ]0 '
se
g
im._. t.:,- ' .
. , ,,,__..i .t
Project Type: Intersection Improvement
Project Description:
Improve channelization and signal operations and reconstruct intersection with concrete.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 100 2026
Right of Way (RW): 100 2027
Construction (CN): 1,800 2028
Total Cost: 2,000
65. Boone Ave. Reconstruction - SjOU
Valley
Flora to Barker
_is
run}
,
s --. _ _ .� i 1 •f. - r-
y
, 110PW,
%
i R , ,
I
I'
II
i
1.
1tT
it
14.4 - r.
Project Type: Street Reconstruction Project
Project Description:
Reconstruct corridor to city standards.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 150 2026-2027
Right of Way (RW): 350 2028-2029
Construction (CN): 3,500 2030
Total Cost: 4,000
66. Flora Rd . Reconstruction - Sol
.....0 Valley
Sprague toIndiana
ii1l ' y j
-y'-
I .- r E Jfy
• i,+ • • .*I I I I —'•f, ' te•-��-
•
10 I
'1' -711 - _ - -- ,---7- r .,,, j_r___I. , - +4 1,�,I I I
I
ii
I
i }_� , ` .,,,,..:•__
lir-
•
< �
_ .
• i
�9
IIIA i� I a .; ,
ice` :' LJ [ -
i
Project Type: Arterial Improvement
Project Description:
Reconstruct to city standards, including a shared-use path connecting Appleway & Centennial Trails,
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 150 2026-2027
Right of Way (RW): 250 2028-2029
Construction (CN): 3,600 2030
Total Cost: 4,000
67. Euclid Ave. Preservation Barker s okan
„so Valley
to E. City Limit
1
l w _--t1
•
Pa. .alr•SlifiFY}Vt
y s:
I t.
•
Project Type: Street Preservation
Project Description:
Pavement preservation project. City may elect to improve road section to meet City standards.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1000) Schedule
Preliminary Engineering (PE): 50 2026
Right of Way (RW): 0 -
Construction (CN): 450 2027
Total Cost: 500
68. Sullivan Rd. Improvements - Sp l'ne
Valley
Trent- n to Wellesley
W ll l
ey
si
Ot
• -_...i., .....
�
" y( _, t wwF „._... _. ,? '�'
`s4 � . tig �."4
IJ.
,' rRl • � —to I. . bil •
.iK , ard �no
06 r c i i .s. •• z 11I ,1� 'L 7
_- ® ^i .� ` 1:111%q U 0.10 *Li, _s,
iink
k '--�
o, 4--t„ war. 1 I -11 • w i I "
. •
- 1 _1; _ ..mom
I
a 1V
Project Type: Arterial Improvement
Project Description:
Widen for center turn lane, improved access management, lighting, and addition of shared-use path.
Funding Status: Planned
Project Phase(s): Planned
Cost Estimate Estimated Project
(in $1,000) Schedule
Preliminary Engineering (PE): 200 2026-2027
Right of Way (RVV): 300 2027-2028
Construction (_CN): 2,500 2029
Total Cost: 3,000