Loading...
1971, 10-20 Permit App J1058 Addition• Moving Const_ Sewage System Total Sq. Ft. / 6 Valuatio Basement , Foundation Const Chimney Firer ace (Kind) % (Number) Heat. System p ng Ext Finish _ Int. Wall Finish i/G. Use of e o of Bldg. -emuCY-- - zs+--yj.��. No. of Units Bed 4ms Garage or Carp Attached Private Detatched Dimensions concrete, brick, etc.) Rooms Baths County of Spokane, Washington BUILDING CODES DEPARTMENT, COURTHOUSE. SPOKANE. WASHINGTON 99201 APPLICATION FOR LAND USE OR STRUCTURE PERMIT GENERAL REQUIREMENTS 1^ERMIT FEE PERMIT REQUIRED. A land use or structure permit 1s required by Ccunty Resolution to erect a building or structure of any kind or alter any building or structure already erected, or to change a land use. Construction mast conform with the Spokane County Building Code and Zoning Ordinance. Construction is su`:,ect to inspection. WATER. water supply must be approved by the County and State Health Departments. Where work on water connections disturbs the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office. SEWAGE SYSTEM. Permits are required in all cases by Ccunty Resolutions Nos. 45-133 and 47.235. SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at least 25' is required, a 5' side yard, 15' side yard from a flanking street. and a 25' rear yard are required. STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress and egress. COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be performed in accordance with stakes. Points of ingress and egress must he approved by the County Engineer. MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State Highway, clearance must be obtained from the County Engineer and/or State Highway Department. ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications. APPLICANT FILL IN BELOW THIS LINE /' Name of Owner ddress -s / 7 !-'e �- Y/ Phone /y Architect Phone Engineer Phone Contractor �/s�-- Address Phone Legal scription o Propert (Give complete description from deed, trxy�rec pt, .7 / 5} 7� -� � moo' - 3 DESCRIPTION OF WO K: New Addition � Remodel ' Size of Lot / TS• (Full, part(i e) fi Draw sketch with dimensions showing: (1) proposed buildings; (4) distance to property tem and water supply lines. NORTH PLOT PLAI! property lines; (2) street or road locations; (3) location of existing and lines and streets; (5) dimensions of buildings; (6) location of sewage sys- „d, SOUTH I hereby certify information submitte. 's corr and the are no other structures located on this property except as shown. State Lic nse No. Ind. Ins. Acct. No. REQUIRED Plumbing Permit Heating Permit6.4 Sewage Permit — l Plans Received Plans Checked Plans Returned Plans Picked Up Plans Mailed ~' Owner or Agent Date A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES. THIS IS NOT A PERMIT. Your street address will be Sewage Permit Number Remarks DO NOT WRITE BELOW THIS JH 57/ Issued Ruildipg PermitSI'/4)