2012, 12-18 Permit SW-12002623 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12002623
Permit Issued Date:
12/18/2012
Expiration Date: 12/19/2012
Project Description: SEWER CONNECTION Primary Contact: GOBER'S LLC
Project Name: W PONDEROSA PH II Applicant: GOBER'S LLC
Permit Type: SEWER Address: 11215 E TRENT AVE
SPOKANE, WA 99206
Phone: 509-924-5372
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
10518 E FERRET DR
44051.1703
Subdivision: ILLER FIRST ADDITION
Assessor's Description: ILLER FIRST ADD L3 B3
Inspection Area:
Owner:
Address:
Phone:
Email:
KUNIN, STEPHEN D & SUSAN J
10518 E FERRETT DR
SPOKANE, WA 99206
Water District: Spokane Fire District: Fire District 8
County Water District #3
Zoning: Land Area: 43500 Square Feet
CONTRACTOR INFORMATION:
General Contractor
GOBERL*899L7
GOBER'S LLC
11215 E TRENT AVE
SPOKANE, WA 99206
509-924-5372
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 12/18/2012 07:19:22
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002623 12/18/2012
Expiration Date: 12/19/2012
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 12/18/2012 07:19:22
Printed by: IIS APPPOOLISmartGovProdApp