Loading...
2012, 12-18 Permit SW-12002623 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW-12002623 Permit Issued Date: 12/18/2012 Expiration Date: 12/19/2012 Project Description: SEWER CONNECTION Primary Contact: GOBER'S LLC Project Name: W PONDEROSA PH II Applicant: GOBER'S LLC Permit Type: SEWER Address: 11215 E TRENT AVE SPOKANE, WA 99206 Phone: 509-924-5372 Email: SITE INFORMATION: Site Address: Parcel Number: 10518 E FERRET DR 44051.1703 Subdivision: ILLER FIRST ADDITION Assessor's Description: ILLER FIRST ADD L3 B3 Inspection Area: Owner: Address: Phone: Email: KUNIN, STEPHEN D & SUSAN J 10518 E FERRETT DR SPOKANE, WA 99206 Water District: Spokane Fire District: Fire District 8 County Water District #3 Zoning: Land Area: 43500 Square Feet CONTRACTOR INFORMATION: General Contractor GOBERL*899L7 GOBER'S LLC 11215 E TRENT AVE SPOKANE, WA 99206 509-924-5372 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 12/18/2012 07:19:22 Printed by: IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002623 12/18/2012 Expiration Date: 12/19/2012 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 12/18/2012 07:19:22 Printed by: IIS APPPOOLISmartGovProdApp