2013, 04-11 Permit SW-13000434 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000434
Permit Issued Date: 04/11/2013
Expiration Date: 04/11/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
W PONDEROSA II
TONER'S EXCAVATING
509-292-2360
Applicant: TONER'S EXCAVATING
Address:
Phone:
Email:
4321 E ELOIKA
CHATTAROY, WA 99003
509-292-2360
SITE INFORMATION:
Site Address:
Parcel Number:
10618 E FERRET DR
44051.1706
Assessor's Description: ILLER FIRST ADD L6 B3
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Spokane County Water
District #3
DAVISSON, MICHAEL K/SANDS, MARCIA
S
10618 E FERRET DR
SPOKANE, WA 99206
509-924-7357
Fire District: Fire District 8
Land Area: 43500 Square Feet
CONTRACTOR INFORMATION:
TONERE*025NP, Exp. 05/01/2014
TONER'S EXCAVATING
4321 E ELOIKA CHATTAROY, WA 99003
509-292-2360
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 04/11/2013 12:03:46 Project Coordinator: Julie Shatto
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000434 Permit Issued Date: 04/11/2013
Expiration Date: 04/11/2014
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/11/2013 12:03:46 Project Coordinator: Julie Shatto