Loading...
2013, 06-03 Permit SW-13000891 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000891 Permit Issued Date: 06/03/2013 Expiration Date: 06/03/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION WEST PONDEROSA PH 2 COMAN CONST & EXCAVATION INC 509-990-5053 Applicant: COMAN CONST & EXCAVATION INC Address: Phone: Email: 4820 S WOODRUFF DR SPOKANE, WA 99206 509-990-5053 SITE INFORMATION: Site Address: 4320 S FELTS CT Parcel Number: 45324.1118 Assessor's Description: Inspection Area: Zoning: PONDRA PINES ADD SE1/4 32-25-44 LT4 BLK1 TOG W/PTN LT5 BLK1 LYG S OF A LN THE W END IS 63' S OF N COR LT4 & E END IS 47' N OF NE COR LT4 EXC PTN LT4 LYG N SD LN :(509)-477-3675 Owner. Address: Phone: Email: Water District: Spokane County Water District #3 BERRY, BILLY A 4320 S FELTS CRT SPOKANE, WA 99206-9658 509-928-8452 Fire District: Spokane Valley Fire Land Area: 44600 Square Feet CONTRACTOR INFORMATION: COMANCE898RZ, Exp. 12/09/2013 COMAN CONST & EXCAVATION INC 4820 S WOODRUFF DR SPOKANE, WA 99206 509-990-5053 DETAILS' Class SEWER Type Quantity Unit Charge Value FEE DETAIL; Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS. Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 06/03/2013 15:24:38 Project Coordinator Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000891 Permit Issued Date: 06/03/2013 Expiration Date: 06/03/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/03/2013 15:24:38 Project Coordinator. Kathy Cummings