2012, 05-31 Permit SW-12001454 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12001454
r
Permit Issued Date:
05/31/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: WHITE BIRCH
Permit Type: SEWER
Primary Contact: WALLS, CARLA R
Applicant: WALLS, CARLA R
Address: 3607 E 28TH AVE
SPOKANE, WA 99223
Phone:
Email:
SITE INFORMATION;
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
516 N FLORA RD
55183.0334
CORBIN ADDITION
CORBIN ADD GREENACRES W1/2 OF THE
S135.5FT OF THE N270.5FT OF LT 8 BLK 17
Owner: WALLS, CARLA R
Address: 3607 E 28TH AVE
SPOKANE, WA 99223
Phone:
Email:
Water District: Fire District: Fire District 1
Consolidated Irrigation
District #19
Zoning: Land Area: 0.4959 acres / 21600 sqft
CONTRACTOR INFORMATION:
Owner Acting As Builder
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN, UK 00000
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
____________________________________________________
Date Printed: 05/31/2012 11:48:01
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001454 05/31/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/31/2012 11:48:01
Printed by: IIS APPPOOLIASP.NET v4.0