2012, 05-31 Permit SW-12001454 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW-12001454 r Permit Issued Date: 05/31/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: WHITE BIRCH Permit Type: SEWER Primary Contact: WALLS, CARLA R Applicant: WALLS, CARLA R Address: 3607 E 28TH AVE SPOKANE, WA 99223 Phone: Email: SITE INFORMATION; Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: 516 N FLORA RD 55183.0334 CORBIN ADDITION CORBIN ADD GREENACRES W1/2 OF THE S135.5FT OF THE N270.5FT OF LT 8 BLK 17 Owner: WALLS, CARLA R Address: 3607 E 28TH AVE SPOKANE, WA 99223 Phone: Email: Water District: Fire District: Fire District 1 Consolidated Irrigation District #19 Zoning: Land Area: 0.4959 acres / 21600 sqft CONTRACTOR INFORMATION: Owner Acting As Builder OWNER OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. ____________________________________________________ Date Printed: 05/31/2012 11:48:01 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001454 05/31/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/31/2012 11:48:01 Printed by: IIS APPPOOLIASP.NET v4.0