2014, 03-25 Permit SW-14000233 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000233
Permit Issued Date: 03/25/2014
Expiration Date: 03/25/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
SOUTH GREENACRES PH IV
LAUER EXCAVATION & CONST
509-981-7954
Applicant: LAUER EXCAVATION & CONST
Address:
Phone:
Email:
PO BOX 11581
SPOKANE VALLEY, WA 99211
509-981-7954
SITE INFORMATION:
Site Address:
Parcel Number:
1215 N FLORA RD
45131.0107
Assessor's Description: BACONS GREENACRES PTN OF BLK 36 DAF:
BEG 226FT S OF NE COR TH NWLY TO PT 159FT
S OF N LN & 940.4FT W OF E LN TH S TO SW
COR TH SELY TO SE COR TH N TO POB EXC
SLY 100FT OF NLY 110FT OF E240FT
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
ABBOTT, RW&SJ
1215 N FLORA RD
GREENACRES, WA 99016-9395
Fire District: Spokane Valley Fire
Land Area: 219973 Square Feet
CONTRACTOR INFORMATION:
LAUEREC931DA, Exp. 03/01/2015
LAUER EXCAVATION & CONST
PO BOX 11581 SPOKANE VALLEY, WA 99211
509-981-7954
DETAILS:
Class
SEWER
FEE DETAIL:
Processing - Utilities
Utilities Permit
Type
SEWER CONNECTION
Total Fee:
$26.64
$125.00
$151.64
Quantity Unit Charge Value
1 $125.00 $125.00
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 03/25/2014 11:45:44 Project Coordinator: Julie Shatto
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000233 Permit Issued Date: 03/25/2014
Expiration Date: 03/25/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/25/2014 11:45:44 Project Coordinator: Julie Shatto