Loading...
2014, 03-18 Permit SW-14000184 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14000184 Permit Issued Date: 03/18/2014 Expiration Date: 03/18/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION S GREENACRES PH V LAUER EXCAVATION & CONST 509-981-7954 Applicant: LAUER EXCAVATION & CONST Address: Phone: Email: PO BOX 11581 SPOKANE VALLEY, WA 99211 509-981-7954 SITE INFORMATION: Site Address: Parcel Number: 1229 N FLORA RD 45131.0108 Assessor's Description: BACONS GREENACRES PTN OF BLK 36 DAF: BEG 336FT S OF NE COR TH NWLY 240FT ALG LN WHICH IF EXTD WOULD INTER PT 940.4FT W OF NE COR & 269FT S OF N LN TH N100FT TH SELY 240FT TH S100FT TO POB Inspection Area: : (509)-477-3675 Zoning: LDR Owner: Address: Phone: Email: Water District: Consolidated Irrigation District #19 SEVIGNEY, C T 1229 N FLORA RD GREENACRES, WA 99016-9395 Fire District: Spokane Valley Fire Land Area: 24067 Square Feet CONTRACTOR INFORMATION: LAUEREC931DA, Exp. 03/01/2015 LAUER EXCAVATION & CONST PO BOX 11581 SPOKANE VALLEY, WA 99211 509-981-7954 DETAILS: Class SEWER FEE DETAIL: Processing - Utilities Utilities Permit Type SEWER CONNECTION Total Fee: $26.64 $125.00 $151.64 Quantity Unit Charge Value 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 03/18/2014 09:17:20 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14000184 Permit Issued Date: 03/18/2014 Expiration Date: 03/18/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/18/2014 09:17:20 Project Coordinator: Kathy Cummings