1989, 05-17 Permit 89001060 InspectPROJECT NUMBER= 890 k60
DATE= 05/17/£39 PAGE= 03
. ISSUED PERMIT
ENI:=yI:Y:-#N ORMAT:I:Ot1
SITE STREET= 13714 E E::VERE::TT AVE. PARCEL..;":__ 3A6444 06
ADDRESS= .SPOKANE:: WA 99216
J
1' PERMIT USE= RESIDENCE
NEW=: X REMODEL== ADDITION= CHANGE OF USE== RES!COM=:: R
ENERGY CODE:= NWE:C E.JTIL-I:TY- WWI'
APPROACH= COMPONENT
COMPLEXITY;ag
DESCRIPTION GROUT' TYPE:: SG I
BASEMENT U R-3 VN iii 0
i GARAGE_ M i VN 484
RE::SIDE:NCE R-3 VN' 1146
######:#aE#..x.#..x..xao-x#aEx#####aEx ENERGY CODE PLAN REVIEW
CEILING,
FLAT:
R--38
DOORS MAX. U -VALUE:
0.19
CEILING, VAULTED:
R-38
GLAZING MAX U -VALUE..
0.45
WALL..:
R -19A
GLAZING MAX AREA:
6.4%
WALL-, BELOW
GRADE::
R--19
AIR LEAKAGE SYSTEM:
STD
,
FLOOR OVER UNC.
SPACE:::
R-30
SPACE: HEATING SYSTEM:
WAL..L.. MOUNT
SLAB FLOOR PERIMETER:
COMMENTS:
NHRV:I:NTE:GRATED SPOT t WHOLE: HOUSE:.
SYSTEM SIZE @ 150% DESIGN LOAD .... 10.5 KW
tt..x#•##•#ac##•#•�..x..x..x..x.#.#.x..x.#..x.#..x.#.#.#.#.#..x#.#.#..x.#.x.#.##.x.x..x#..x#####x########aE###x#x#########x#iE
I HAVE BEEN ADVISED OF THE FINANCIAL.. INCENTIVES AVAILABLE FOR THE STRUCTURE
DESCRIDEb ON THIS PERMIT, AND THAT TO ENERGY CONSTRUCTION MEASURES FOR
WHICH TETE: INCENTIVES WILL B, P' REQUIREMENT- OF THIS PERMIT. AND THAT
THE STRUCTURE MUST RE�EJEIVE: F a: + L. BY ,.JUNE 30, 1992 TO RECEIVE AN
INCENTIVE PAYMENT. �L_EO UN AT NEITHER THE BONNEVILLE POWER AD—
MINISTRATION NOR EF ANE COUN' n WARRANTIES AN TO ACTUAL.. ELECTRICAL.
SAVINGS" TO BE: REAL..:V)5E-D, OR ANY EIEC=: EXPRESSED OR IMPLIED WARRANTY CON--
CE:RNING THE: MATERIAL_A' APL.OYED ..W THE CONSTRUCTION OF THE: STRUCTURE:.
I: HAVE BEEN ADVISED OF AND INTEND TO COMPLY WITH THE NORTHWEST ENERGY CODE
REQUIREMENTS PERTAINING TO FORMALDEHYDE EMISSIONS STANDARDS FOR STRUCTURAL
COMPONENTS, AND HAWRECEIVED A COPY OF EXHIBIT 9(A) WHICH DESCRIBES THESE
REQUIREMENTS.
_...................."...................................._........ ......._.._.. _��"..7.'._A....._........
APPL..I:CANT DATE:::
R4::!1 ..............-......_... _...
A�_rrHr.IREZED OFFICER
THANK YOU
INSP - ID
PLANS TRACKING / CERTIFICATES OF OCCUPANCY ONLY*
Date received for C/O processing:
Plans pulled for final processing:
Conditions to check:
Conditions resolved:
Tenporary C/O requested (y/n)
Certificate of Occupancy issued:
Received application:
DATE
6-,,Z
Approval granted:
By:
Ninety days after C/O issuance:
Owner/contractor called regarding the return of plans: Date:
Plans returned:
Received by:
No response from owner/contractor - plans
destroyed:
Notes:
r
B
U
I
L
D
1
N
G
P
L
U
U
M
B
I
N
G
M
E
C
H
A
N
I
C
A
L
0
T
H
E
R
* * * * * * * * * * THIS SPACE FOR COMMERCIAL
PLANS TRACKING / CERTIFICATES OF OCCUPANCY ONLY*
Date received for C/O processing:
Plans pulled for final processing:
Conditions to check:
Conditions resolved:
Tenporary C/O requested (y/n)
Certificate of Occupancy issued:
Received application:
By:
Approval granted:
By:
Ninety days after C/O issuance:
Owner/contractor called regarding the return of plans: Date:
Plans returned:
Received by:
No response from owner/contractor - plans
destroyed:
Notes:
TO..IEC T NUMBER= 89001060 Dt �!t- t� rPAGE= '91
IS'S lE:D PE
FI
#xaE####•xx##.;{.x..x#####dE#####;E## PEltr'4;CT-1JdF01"iMATTON
S
SITE STREET= 13714 Ei: E::vEE;E:rT AVE: E'ARCEL;=::3aE>44-1sra6
ADDRESS= SPOKANE WA 99216
PERMIT USE rRES'IDENCE:
PLATO=:: 004150 PLAT NAME=:: S'ANSON EAST
BLOQK== 6 LOT= 2 ZONE= SFR DI:STO=:: F
AREA= F/A-= F WIDTH= :54 DEPTH= 206 R/W== 50
0 OF BLDGS'= 1 ; DWELLINGS= 1
OWNER- C H D INC PHONE= 509 926 5229
STREET= 'f' 0 I3OX 13717
ADDRESS= SPOKANE WA 9921:.3
CONTACT NAME:=. WE:S CROSBY PHONE:: NUMBER- 509 926 5229
BUILDING SETBACKS: FRONT- 40 LEFT= 7 RIGHT_ 14 REAR- NA
BUILDING PEI'?MI7
CONTRACTOR= C H D INC
PHONE==
509 926 5229
STREET= P 0 BOX 13717
2
8.00
ADDRESS= SPOKANE WA 99213
2
8.00
NEW= X REMODEL=
ADDITION=
CHANGE. OF USE=
DWE:CL_I._ UNITS= 1 OCCUP,. LD==
BLDG HGT=
STORIES== 1
BLDG W X D ::= X SG E' T
1146
4,00
REG PARKING== HANDICAP=
SEWER=
N HYDRANT== N
ENERGY CODE= NWEC UTILITY= WWP
N,
4.00
ELECTRIC WATER HEATERS
~
DESCRIPTION GROUP TYPE:
SG F'T
VALUATION
BASEMENT U R-3 VN
1110
9990.00
CGARAGE M-1 VN
404
3388.00
RESIDENCE R--3 Vt!
1146
50424.00
ITEM DE::.SCRI:EifION ifoluANTITY
FEE AMOUNT
-------
_.-.__...--_..-....
RE 'IDENTI:iE VAL.UATION,i
Y
477.50
STATE' SUR4".fAAE. e/
Y
3.:50
EcNE:RGY' 511{ H RGE
Y
15.00
PLUMBING PERMIT#•�E•x:rc#ar.###x.#.x.#..x.x#####•x••x#•x•:x#####
CONTRAC'T'OR= 4:: H 'D INC PHONE== 509 926 5229
S'TREE'T= P 0 BOX 13717
ADDRESS= SPOKANE WA 99213
ITEM DESCRIPTION
QUANTITY
FE:E:. AMOUNT
TOILETS
2
8.00
.SINKS
2
8.00
SHOWERS
1
4.00
BATH TUBS
1
4.00
KITCHEN SINKS
1
4,00
DISH WASHERS
1
4.00
CLOTHES WASHER
1
4.00
ELECTRIC WATER HEATERS
1
'=.00
FLOOR DRAINS
1
4.00
INSP - 1D
�C{j
Date received for C/O processing:
Plans pulled for final processing:
DATE
)b 0- 7'.Zb -%
7-241 Y/
Temporary C/O requested (y/n)
Certificate of Occupancy issued:
Received application:
By:
Approval granted:
c�
o ia31674
IffA
Ninety days after C/O issuance:
e
�6Z
Plans returned:
Received by:
U
I
destroyed:
Notes:
L
D
I
N
G
0o 2
L
ib�7 ii
U
U
M
B
1
N
G
M
E
C
H
A
N
I
C
A
L
0
T
H
E
R
* * * * * * * * * * THIS SPACE FOR COMMERCIAL
PLANS TRACKING / CERTIFICATES OF OCCUPANCY ONLY*
Date received for C/O processing:
Plans pulled for final processing:
Conditions to check:
Conditions resolved:
Temporary C/O requested (y/n)
Certificate of Occupancy issued:
Received application:
By:
Approval granted:
By:
Ninety days after C/O issuance:
Owner/contractor called regarding the return of plans: Date:
Plans returned:
Received by:
No response from owner/contractor - plans
destroyed:
Notes:
® SLAB INSPECTION - PRIOR TO PLACING SLAB
Job Address
_ounty-3f Spokane
Northwest Energy Code
BUILDER/INSPECTOR CHECKLIST
GRAVEL BASE: A 4 inch thick coarse -grade gravel base shall be in place.
Energy
Inspections
456-3675
PERIMETER INSULATION: Alt slab perimeters within 24 inches of the final exterior grade shall be insulated to at least
R-10. Insulation shall be 24 inches in length overall and instatled in an approved Ma r.
® INSULATION AND SEALING INSPECTION
APPROVED PLANS are available on the jab site.
WINDOWS AND DOORS: All windows and doors shalt be as specified on the approved plans. The rough opening around jambs,
sills and headers shall be seated to prevent air infiltration. .These areas may be either caulked or foamed, but must be
seated airtight- -
SOLEPLATE CAULKED: Soleplates of walls shalt be caulked or glued to the floor.
C -
PLUMBING AND ELECTRICAL PENETRATIONS: All holes in the buiding envelope shalt be sealed to prevent air infiltration.
Where electrical wiring passes horizontally through a wall stud, no sealing is required u(ess that stud penetrates the
building --envelope.- Electric boxes throughout the building shall either have the holes and edges sealed or be provided
with plate gaskets. Rim joists, mdsills and plumbing stacks shall be sealed.
WALL INSULATION: All wall cavities shall be filled completely to the required insulation value. Batts shall not be
compressed- Batts must be cut to fit around wires, pipes and outlet loxes. Kraft or foil vapor retarders mist be
face -stapled.
FLOOR INSULATION: Floor insulation shall be installed to the required R -value, and shall be supported in an approved
manner with twine, wire, "Tyvek," netting, etc. Avoid compressing the insulation.
CEILING INSULATION: If eave vents are used, approved baffles shall be in place to permit adequate ventilation through
eave vents. Blown insulation may not be used if the ceiling slopes more than 2-1/2 in 12.
DUCTS: Ducts shall be sealed at joints and corners with duct tape or sealant. Ducts outside of the conditioned space,
except exhaust air ducts, shall be insulated to R-11. Exhaust air ducts shall extend to the exterior of the building.
VAPOR RETARDERS: A vapor retarder is required on the warm side of insulation in walls, floors, and ceilings. Approved
materials include: 6 mil. polyethylene, Kraft or foil paper face -stapled, exterior grade plywood and certain flooring
materials.
CRAWL SPACE: Screened ventilation openings shall be provided at a rate of not less than one square foot for each 300
square feet of under -floor area.
• FINAL INSPECTION (ENERGY)
APPROVED PLANS are available on the job site.
MECHANICAL SYSTEMS: All mechanical systems will be checked for correct operation and labeling of controls.
Heaters shall be sized as shown on the approved plans -
Exhaust fans shall be properly located and shall be properly rated for size and noise.
Exhaust ducts shall be provided with a tightfitting backdraft damper.
The whole house exhaust fan shall be controlled to operate automatically as well as manually.
Make-up air intakes shall be properly located and sized.
'1
WEATHERSTRIPPING:
Weatherstripping shall be aligned for proper seal on .exterior doors, including doors into unheated spaces. Door
threshold or sweep shall be properly adjusted.
Attic hatches and interior crawlspace access hatches shall be weatherstripped and insulated.
Windows shall be weatherstripped and locking mechanism checked for proper function.
_ Electrical switch and outlet plates throughout the building shall be fitted with gaskets, unless the boxes were sealed
prior to the insulation inspection 101)
-
ATTICS:
Insulation shall be of thickness specified by the manufacturer to comply with required R -values. \,
PLUMBING:
Hot water heaters shall meet the ASHRAE 9GA-80 specifications.
Showers shall be equipped with flow restrictors allming amaximm flow of 2.75 gal tors per minute per shower head.
4
FIREPLACES / WOOD STOVES:
Fireplaces and wood stoves shall be equipped with "tight -fitting" metal or glass doors.
A combustion air intake shall be ducted directly into the firebox. The intake duct shall be at least six square inches
in area and shall be equipped with a readily accessible, operable tightfitting damper.
CRAWL SPACES:
_A grovel cover of 6 mil. black polyethylene or equal shall be installed on all crawl space floors. Joints shalt be
lapped at least 12 inches.
INDOOR AIR DUALITY:
_During the final inspection of occ, ncies which are eligible for incentive payments, the energy code inspector will
Leave a pro -paid postcard, which offers a free radon monitor, and a backgraunder booklet from BPA about indoor air
quality.