2014, 04-24 Permit SW-14000498 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000498
Permit Issued Date: 04/24/2014
Expiration Date: 04/24/2015
Project Description: SEWER CONNECTION
Primary Contact: FOLSOM EXCAVATING INC
Phone: 509-891-1232
Applicant: FOLSOM EXCAVATING INC
Address:
Phone:
Email:
16701 E VALLEYWAY AVE
VERADALE, WA 99037
509-891-1232
SITE INFORMATION:
Site Address:
Parcel Number:
2207 N FLORA RD
45124.0136
Assessors Description: GRN ACRS IRR DIST A PT OF TR 12-14 BEG SE
COR TR 12 TH N A LG E LN 396.9FT TH S71DEG
56MIN W552.63FT TH N18DEG 04MIN WSFT T H
ON CUR TO LEFT WITH RAD 945.37FT & TAN TO
S71DEG 56MIN W 109.7FT TO PT ON
Inspection Area: :(509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
BOORMAN, JAMES
2207 N FLORA RD
GREENACRES, WA 99016-9397
Fire District: Spokane Valley Fire
Land Area: 160766 Square Feet
CONTRACTOR INFORMATION:
FOLSOEI994DO, Exp. 04/20/2016
FOLSOM EXCAVATING INC
16701 E VALLEYWAY AVE VERADALE, WA 99037
509-891-1232
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 04/24/2014 12:41:33 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000498 Permit Issued Date: 04/24/2014
Expiration Date: 04/24/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/24/2014 12:41:33 Project Coordinator: Dawn Dompier