2013, 12-18 Permit App BLD-2013-2563 Mechanical, PlumbingSpokane
.Valley9
Community Development
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
PHONE: (509) 720-5240
FAX: (509) 688-0037
Mechanical Permit Application El Commercial
Project - 20!3-2323
RECEIVE
DE 1 8 2013
Residential CSV 1°ERMIT C
SITE ADDRESS: 3 a o 3 V. G i (44 r l
PERMIT FEE:
Building Owner M at la. U ell f f `�
Name: J 7 T
Phone:
Fax:
,y r
h 1
Address: 3 o'Zi) !V 6 r /6t i/ ' (,
,/
City: ioQ nP l/ate ,
"�'
State: WA
Zip: q q z 1
.
Contractor S.
Name: D0. fit ��n^��
Qq
Phone: %DI) l/t�Q'%aq
Fax:
ff //
Address: 1 C� 20 5 r a .
City: . �c p_//__
"`� �'
State: !ii�
Li/
Zip: q q O 37
License No: EVC U / t' 9v,0 8 Z 0
City Business Lic:
Contact/Project Manager:
////
Name: Da/tie, CO!/i 7/
77 ,
Phone: (SDI) y69 7ft'o
1
# UNITS
HEATERS OR RELOCATION
Up to & including 100,000 BTU
1
FURNACES & SUSPENDED -INSTALLATION
HEATERS OR RELOCATION
Over 100,000 BTU
FURNACES & SUSPENDED -INSTALLATION
DUCT WORK SYSTEM
0-3 TON
HEAT PUMP/AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
AIR CONDITIONER
GAS WATER HEATER
GAS PIPING SYSTEM (each outlet)
1
Q
GAS LOG. FIREPLACE, & GAS INSERT
RELOCATION, REPLACEMENT
APPLIANCE VENTS INSTALLATION,
REPAIRS OR ADDITIONS
SYSTEM
0 to 3 hp-100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 -15 hp-100,001 to 500,000 BTU
SYSTEM
Over 15 — 30 hp - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS
SYSTEM
Over30 hp-1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS
SYSTEM
Over 50 hp — over 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS
AIR HANDLER (DOES NOT include ducting) •
Each unit up to 10,000 cfm, including ducts
ducting)
Each unit over 10,000 cfm
AIR HANDLER (DOES NOT include
than
EVAPORATIVE COOLERS(other portables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
Each ventilation system
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
VENTILATION AND EXHAUST
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
INCINERATORS
Range, Clothes Dryer
, ,
- 4
APPLIANCES
Under400,000 BTU
UNLISTED APPLIANCES
UNLISTED APPLIANCES
Over 400,000 BTU
Type I
1
HOOD
Type ll
HOOD
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
STANDING
WOOD STOVE SYSTEMyFT2EE f .. o I ,
Signature
CURRENT FEES AVAILABLE AT: htto://www.spokanevalleY•orq Quick link to forms, then Master Fee Schedule
Per mu Development 2
'.,A Permit 1. _er i ,J
Sokane 11703 E Sprague Ave, SuiteB3jeCt ^, (`ma
P Spokane Valley, WA 99206 RECEIVE,
,•••Valleym PHONE: (509) 720-5240
FAX: (509) 688-0037 •
tEC E 8 2013
Plumbing Permit Application ❑ Commercial ['Resideintial,
SITE ADDRESS: 3,26 3 /f /. C rad
nrnrtv, -
S e 1v4
PERMIT FEE:
Building Ownern""-__--_._ -
Phone: Fax:
Name: /1
.la 8e� /P.4
Gar
n I
Address: 3 c (3 3 /U.`j I�i /2i^�X X of . City: „044., K e i/ 4 State: k� Zip: 7 q,2 / o' .
. .
Contractor
Name: 0 v� e •/l Phone: 5-op g�G�, 7(/o f Fax:
City joci,G ssP 1/•/'' State: /, 4 Zip: Gr Gj 37
Address: f j� DAv` r� off- C7t u!/ /
.
License No: � ,vo UDC q6O p 31 ' I� City Business Lic: /
Contact/Project Manager:
/p
Name: 1)�-e Co /r, Phone: (5-0 q) 0,' 9� 7go 7 p
ti/ l
# UNITS
PLUMBING FIXTURE ON ATRAP
TOILETS
URINALS
TUBS
SHOWERS (per trap)
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Meat
SINKS
I
DISHWASHER
WASHER
i
CLOTHES
GARBAGE DISPOSAL
WATER SOFTNER
DRAIN
Area, Case. Coil. Trench, Condensate
FLOOR
ROOF DRAIN/OVERFLOW DRAINS
DRINKING
FOUNTAIN,
PIPING/DRAIN-IN WASTE
Installation, Alterations, Repair, Reversals
WATER
Ice Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
WATER USING DEVICE
and/or
PRIVATE SEWAGE DISPOSAL SYSTEM
HEATER
If Gas, See Mechanical
WATER
INDUSTRIAL WASTE PRETREATEMENT
Including traps. vents except kitchen type grease interceptors functioning as fixture traps
INCEPTORS
Water piping, drainage or vent piping
REPAIR OR ALTERATION
TYPE VACUUM BREAKER
ATMOSPHERIC
FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
BACK
GAS
MEDICAL
INCEPTORS ..
Signature
i
a-/7 8/73
CURRENT FEES AVAILABLE AT: http://www.spokanevallev.oral under the quick links for Forms, Master Fee Schedule.
Target Date sheet
Stiokane ) ^ c
Valle )
For City Use Only
PLUS Project — i
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD-003 V-7/ 06-21-11 Page 1 of 1