2013, 10-03 Permit SW-13001737 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001737 Permit Issued Date: 10/03/2013
Expiration Date: 10/03/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION - RESIDENTIAL
CENTENIAL PLACE
MARKHAM HOMES INC
Applicant: MARKHAM HOMES INC
Address: PO BOX 14130
SPOKANE VALLEY, WA 99214
Phone:
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1919 N FLORA RD
45124.0309
Owner: MARKHAM HOMES INC
Address: 521 N ARGONNE ST STE 101A
SPOKANE VALLEY, WA 99212
Phone:
Assessor's Description: SHP 08-12 PTN OF LT 4 LYG E OF FOL LN DAF: Email:
BEG AT NW COR OF LT 5 OF SHP 08-12 TH
N00°07'36"E 80.07FT TO N LN OF SHP 08-12 &
TERMINUS OF LN
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Zoning: Land Area: 0.2327 acres / 10138 sqft
CONTRACTOR INFORMATION:
MARKHHI971DK, Exp. 03/12/2015
MARKHAM HOMES INC
PO BOX 14130 SPOKANE VALLEY, WA 99214
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 10/03/2013 14:33:05 Project Coordinator: Laurie Carver
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001737 Permit Issued Date: 10/03/2013
Expiration Date: 10/03/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/03/2013 14:33:05 Project Coordinator: Laurie Carver