2013, 11-18 Permit SW-13002059 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13002059
Permit Issued Date: 11/18/2013
Expiration Date: 11/18/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
W PONDEROSA
NORM'S EXCAVATING INC
509-928-0580
Applicant: NORM'S EXCAVATING INC
Address:
Phone:
Email:
PO BOX 30873
SPOKANE, WA 99223
509-928-0580
tina@normsexcavating.com
SITE INFORMATION:
Site Address:
Parcel Number:
10407 E HOLMAN RD
44051.1502
Assessor's Description: ILLER FIRST ADD L2 B1
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Spokane County Water
District #3
BAKER, CHRISTINA A
10407 E HOLMAN RD
SPOKANE, WA 99206-9290
Fire District: Fire District 8
Land Area: 39312 Square Feet
CONTRACTOR INFORMATION:
NORMSEI972BM, Exp. 02/06/2015
NORM'S EXCAVATING INC
PO BOX 30873 SPOKANE, WA 99223
509-928-0580
tina@normsexcavating.com
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
Date Printed: 11/18/2013 12:22:34 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13002059 Permit Issued Date: 11/18/2013
Expiration Date: 11/18/2014
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 11/18/2013 12:22:34 Project Coordinator: Dawn Dompier