Loading...
2010, 03-18 Permit App 10000728 Basement SheetrockProject Number: 10000728 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information:, Permit Use: BASEMENT REPLACE SHEETROCK Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 001182 Name: HENLINES ADD Date: 3/18/2010 Page 1 of 2 Contact: TERRY JONES Address: 5016 N VINCENT RD C - S - Z: NEWMAN LAKE, WA 99025 Phone: (509) 226-3351 Group Name: Project Name: District: Nort Parcel Number: 45074.0128 Block: SiteAddress: 2205 N HUTCHINSON RD Location:: CSV Lot: Owner: Name: CORNELIUS, TEENA Address: 2205 N HUTCHINSON RD SPOKANE VALLEY, WA 99212 Zoning: R-2 SF Res Suburban District Water District: 100 SPO CO WATER DIST#3A Area: 13,260 Sq Ft Width: 0 Depth: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Hold: ❑ Right Of Way (ft): 0 Review Building Plan Review Permits: Reles By Originally Released: Contractor: Address: INLAND NORTHWEST BUILDERS 5016 N VINCENT RD NEWMAN LAKE, WA 99025 Description 1 &2 FAMILY gm Type R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT 3/18/2010 By: tmelbourn Building Permit Finn: INLAND NORTHWEST BUILDERS Phone: (509) 226-3351 This Application: Notes Su Ft Valuation REMODEL 0 $16,621.27 Totals: 0 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT $16,621.27 Permit Total Fees: Total Project: Su Ft Valuation 0 $16,621.27 0 $16,621.27 Fee Amount $279.25 $4.50 $111.70 $395.45 Operator: jmm Printed By: JD Print Date: 3/18/2010 Project Number: 10000728 Inv: 1 Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Payment Summary: Permit Type Building Permit Date: 3/18/2010 Page 2 of 2 Fee Amount Invoice Amount Amount Paid Amount Owing $395.45 $395.45 $111.70 $283.75 $395.45 $395.45 $111.70 $283.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 3/18/2010 f.. *dime ne p .Valley Community Development Residential Constructions New Permit Application 1 • µpR Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 (-fl9)b88.0 7 PERMIT NUMBER: /U - 012 PERMIT FEE: nstruction Accessory Bldg ddition/Remodel n Deck Other: SITE ADDRESS: .�2�� , ALIO U` j ,� i vtAS cr. ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: i'j%R 207,AR r / a-L._ i ; Tr Address: r/ c 1i • id of i . i OS/-1, i`S d City:() (-rrya s�vk A,,./ f State: Zip: 1 A44E_.4 h/A 77.2; T Phone: Fax: 3X5—kY.9/6) Contact Person Name: Phone: Describe the scope of work in detail: Contractor: Name;,_,____, 7-1 / / .i� - s Address: ' / City:1,�.-i� ,LAka. State: 1411 Zip:502 Phone: - Contractor Lic No: n/LArJ,)L Exp Date: -3 I7/5 rJ.� _ { 3 _ or i ("."1' 4-' City Business Lic. No: Cost of Project: $ ) (Q �� i� J Ie_ 4iL�C_e! yJ` P to 4,7imuds.....„, -- �J7 ,%!� �ti�,'7vl.Y7f 4[Li7s �[•' )ilf} G - i rn Yt�,� —� �— - ^� i w� r tic% �y� r m d CITE �. Proposed Use: **************The following MUST be complete: (write N/A if not anelicablel********************** HEIGHT TO PEAK: /01' DIMENSIONS: Jai # OF STORIES: ) TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 7_36 2"" FLOOR S FTG: UNFIN BASEMENT SQ. FTG: ,%% IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: 9 83kQ GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: ,,,,pri- HEAT SOURCE: v, SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIG AWN T DATE: --` \ D3_r— Io Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 2/15/07 RESIDENTIAL�����~�� LIST ��U��������. �CHECK ��'�� . DIRECTIONS: .��"��~. Place acheck mark in box next toeach document required for complete submittal. OSITE PLAN OProperty lines and dimensions O Direction arrow pointing North and orientation tostreets QProposed/existing buildings (footprint and dim �noionm\ oUtilities, septic tank/drain field locations and distances ' , • Setbacks to property lines ODistance between buildings ORighd,ofway/easement location &sizes ODr iveway, approach size and location BUILDING PLANS (3 SETS) (minimum 10inch scale or,.dimensioned). .` O Elevations \ with roof peak and wall height including basement: OFoundation Plan (oravvepace.basement orslab ongrade): o Footing sizes and locations oPerimeter concrete foundation wall sizes OCravvlspaoeventilation o Supporting wood cripple walls orbeams OThickened concrete pads supporting beams or girder trusses O Floor Plan ofeach level or with dimensions: oFloor Joist direction, size and spacing OHeader beam orconcrete lintel sizes oBrace wall panel locations oWater heater and furnace locations OExhaust fan locations oDeck orconcrete patio sizes and locations 0 Roof Plan: • Engineered truss direction and spacing • Rafter and over frame direction, size and spacing O Wall Section Detail including: Roof OSlope/ roofing material/ un ice dam protection o Sheathing size and type Ceiling oJoist size and spacing VVa0 oHeighUtop plate/ stud size and sole plate oExterior sheathing size and type Floor OJoist size and spacing Foundation Wall oConcrete orMasonry unit width oEarth towood separation distance Footing oGize Radon oPassive system with Gnni|vapor barrier Miscellaneous Construction Details OQmck: OFloor plan/ side view/ dimensions OFloor Joist/ decking direction, size and spacing OStairway tread rise & run and nosing OVVindow and door location and sizes oWindow well locations ifapplicable oRoom usage labels OSmoke detector locations oAttic and crawl space access locations OFire Wall construction Ei Ridge, eaveand valley lines oBeam and girder size and location Ej Truss orrafter size, spacing 8nonneotion oAttic insulation/ air space baffle/ ventilation OSize ofceiling gypsum wall board oGidino exterior house wrap/ anchor bolts OInsulation, vapor barrier, gypsum wall board O Sheathing or concrete floor size/ insulation o b�om�i��h� ground '"""'u An�u '� OHorizontal & vertical reinforcement ifany o Reinforcement if any 0 Active system with Smil vapor barrier O post/ and beam size and locations OHandrail / Guard height & spacing Spokane jUalley Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Ei Previous pre-app meeting ❑ Plan revisions 111 Transmittal Date: Wednesday, March 17, 2010 Site Address: 2205 N HUTCHINSON RD Parcel Number: 45074.0128 Zoning: R-2 Fire District: FD 01 Project Number: 10000728 Water District: SPO CO WATER DIST#3A Applicant: e-mail: Contact: e-mail: Contractor: TERRY JONES 5016 N VINCENT RD NEWMAN LAKE, WA 99025 (509) 226-3351 TERRY JONES 5016 N VINCENT RD NEWMAN LAKE, WA 99025 (509) 226-3351 INLAND NORTHWEST BUILDERS 5016 N VINCENT RD NEWMAN LAKE, WA 99025 (509) 226-3351 Owner: CORNELIUS, TEENA 2205 N HUTCHINSON RD SPOKANE VALLEY, WA 99212 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Project Description: BASEMENT REPLACE SHEETROCK D D D MAR 1 7 :nnu n� Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN TD Please send all plan review and project comments via e-mail to the highlighted individuals. Si10ka11E 4Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 4 permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. 1 Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Ca11 staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE OC\/ O//17