2010, 03-18 Permit App 10000728 Basement SheetrockProject Number: 10000728 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:,
Permit Use: BASEMENT REPLACE SHEETROCK
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 001182 Name: HENLINES ADD
Date: 3/18/2010 Page 1 of 2
Contact: TERRY JONES
Address: 5016 N VINCENT RD
C - S - Z: NEWMAN LAKE, WA 99025
Phone: (509) 226-3351
Group Name:
Project Name:
District: Nort
Parcel Number: 45074.0128 Block:
SiteAddress: 2205 N HUTCHINSON RD
Location:: CSV
Lot:
Owner: Name: CORNELIUS, TEENA
Address: 2205 N HUTCHINSON RD
SPOKANE VALLEY, WA 99212
Zoning: R-2 SF Res Suburban District
Water District: 100 SPO CO WATER DIST#3A
Area: 13,260 Sq Ft Width: 0 Depth: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Hold: ❑
Right Of Way (ft): 0
Review
Building Plan Review
Permits:
Reles
By
Originally Released:
Contractor:
Address:
INLAND NORTHWEST BUILDERS
5016 N VINCENT RD
NEWMAN LAKE, WA 99025
Description
1 &2 FAMILY
gm Type
R-3 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
3/18/2010 By: tmelbourn
Building Permit
Finn: INLAND NORTHWEST BUILDERS
Phone: (509) 226-3351
This Application:
Notes Su Ft Valuation
REMODEL 0 $16,621.27
Totals: 0
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
$16,621.27
Permit Total Fees:
Total Project:
Su Ft Valuation
0 $16,621.27
0 $16,621.27
Fee Amount
$279.25
$4.50
$111.70
$395.45
Operator: jmm
Printed By: JD Print Date:
3/18/2010
Project Number: 10000728 Inv: 1
Notes:
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Payment Summary:
Permit Type
Building Permit
Date: 3/18/2010 Page 2 of 2
Fee Amount Invoice Amount Amount Paid Amount Owing
$395.45 $395.45 $111.70 $283.75
$395.45 $395.45 $111.70 $283.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 3/18/2010
f..
*dime
ne
p
.Valley
Community Development
Residential Constructions New
Permit Application 1 •
µpR
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 (-fl9)b88.0 7
PERMIT NUMBER: /U - 012
PERMIT FEE:
nstruction Accessory Bldg
ddition/Remodel n Deck
Other:
SITE ADDRESS: .�2�� , ALIO U` j ,� i vtAS cr.
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name:
i'j%R 207,AR r
/ a-L._ i ; Tr
Address:
r/ c
1i • id of i . i OS/-1, i`S d
City:()
(-rrya s�vk A,,./
f State: Zip:
1 A44E_.4 h/A 77.2; T
Phone: Fax:
3X5—kY.9/6)
Contact Person
Name:
Phone:
Describe the scope of work in detail:
Contractor:
Name;,_,____, 7-1
/ / .i�
- s
Address: ' /
City:1,�.-i� ,LAka.
State: 1411
Zip:502
Phone:
-
Contractor Lic No:
n/LArJ,)L
Exp Date: -3
I7/5 rJ.�
_ {
3
_ or i ("."1' 4-'
City Business Lic. No:
Cost of Project: $ ) (Q �� i� J Ie_
4iL�C_e! yJ` P to 4,7imuds.....„, -- �J7 ,%!� �ti�,'7vl.Y7f 4[Li7s �[•'
)ilf} G - i rn Yt�,� —� �— - ^�
i w� r tic% �y� r m d CITE
�.
Proposed Use:
**************The following MUST be complete: (write N/A if not anelicablel**********************
HEIGHT TO PEAK:
/01'
DIMENSIONS:
Jai
# OF STORIES:
)
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
7_36
2"" FLOOR S FTG:
UNFIN BASEMENT SQ. FTG:
,%%
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: 9 83kQ
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
,,,,pri-
HEAT SOURCE:
v,
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIG AWN T DATE: --` \ D3_r— Io
Method of Payment:
❑ Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
RESIDENTIAL�����~�� LIST ��U��������.
�CHECK ��'�� . DIRECTIONS:
.��"��~.
Place acheck mark in box next toeach document required for complete submittal.
OSITE PLAN
OProperty lines and dimensions
O Direction arrow pointing North and orientation tostreets
QProposed/existing buildings (footprint and dim �noionm\
oUtilities, septic tank/drain field locations and distances
'
,
• Setbacks to property lines
ODistance between buildings
ORighd,ofway/easement location &sizes
ODr
iveway, approach size and location
BUILDING PLANS (3 SETS) (minimum 10inch scale or,.dimensioned). .`
O Elevations \ with roof peak and wall height including basement:
OFoundation Plan (oravvepace.basement orslab ongrade):
o Footing sizes and locations
oPerimeter concrete foundation wall sizes
OCravvlspaoeventilation
o Supporting wood cripple walls orbeams
OThickened concrete pads supporting
beams or girder trusses
O Floor Plan ofeach level or with dimensions:
oFloor Joist direction, size and spacing
OHeader beam orconcrete lintel sizes
oBrace wall panel locations
oWater heater and furnace locations
OExhaust fan locations
oDeck orconcrete patio sizes and locations
0 Roof Plan:
• Engineered truss direction and spacing
• Rafter and over frame direction, size and spacing
O Wall Section Detail including:
Roof
OSlope/ roofing material/ un ice dam protection
o Sheathing size and type
Ceiling
oJoist size and spacing
VVa0
oHeighUtop plate/ stud size and sole plate
oExterior sheathing size and type
Floor
OJoist size and spacing
Foundation Wall
oConcrete orMasonry unit width
oEarth towood separation distance
Footing
oGize
Radon
oPassive system with Gnni|vapor barrier
Miscellaneous Construction Details
OQmck:
OFloor plan/ side view/ dimensions
OFloor Joist/ decking direction, size and spacing
OStairway tread rise & run and nosing
OVVindow and door location and sizes
oWindow well locations ifapplicable
oRoom usage labels
OSmoke detector locations
oAttic and crawl space access locations
OFire Wall construction
Ei Ridge, eaveand valley lines
oBeam and girder size and location
Ej Truss orrafter size, spacing 8nonneotion
oAttic insulation/ air space baffle/ ventilation
OSize ofceiling gypsum wall board
oGidino exterior house wrap/ anchor bolts
OInsulation, vapor barrier, gypsum wall board
O Sheathing or concrete floor size/ insulation
o b�om�i��h� ground '"""'u An�u '�
OHorizontal & vertical reinforcement ifany
o Reinforcement if any
0 Active system with Smil vapor barrier
O post/ and beam size and locations
OHandrail / Guard height & spacing
Spokane
jUalley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project Ei
Previous pre-app meeting ❑
Plan revisions 111
Transmittal Date:
Wednesday, March 17, 2010
Site Address: 2205 N HUTCHINSON RD
Parcel Number: 45074.0128
Zoning: R-2
Fire District: FD 01
Project Number: 10000728
Water District: SPO CO WATER DIST#3A
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
TERRY JONES
5016 N VINCENT RD
NEWMAN LAKE, WA 99025
(509) 226-3351
TERRY JONES
5016 N VINCENT RD
NEWMAN LAKE, WA 99025
(509) 226-3351
INLAND NORTHWEST BUILDERS
5016 N VINCENT RD
NEWMAN LAKE, WA 99025
(509) 226-3351
Owner: CORNELIUS, TEENA
2205 N HUTCHINSON RD
SPOKANE VALLEY, WA 99212
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project Description: BASEMENT REPLACE SHEETROCK
D
D
D
MAR 1 7 :nnu
n�
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
CONSTRUCTION PLAN
TD
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Si10ka11E
4Valley®
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 4 permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
1
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Ca11 staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
OC\/ O//17