2014, 04-09 Permit SW-14000358 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000358
Permit Issued Date: 04/09/2014
Expiration Date: 04/09/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
CORBIN U104
BOUCHER, RUSSELL J & SHELLEY S
509-953-3274
Applicant: BOUCHER, RUSSELL J & SHELLEY S
Address:
Phone:
Email:
10 N HARMONY RD
SPOKANE VALLEY, WA 99216
509-953-3274
SITE INFORMATION:
Site Address:
Parcel Number:
16 N HARMONY RD
55173.1813
Assessor's Description: GUTHRIES VLY VW 5TH L13 B8
Inspection Area: : (509)-477-3675
Zoning:
Owner:
SMITH, CR&ZM
Address: 16 N HARMONY RD
GREENACRES, WA 99016-9613
509-924-7927
Phone:
Email:
Water District: Consolidated Irrigation
District #19
Fire District: Spokane Valley Fire
Land Area: 9600 Square Feet
CONTRACTOR INFORMATION:
BOUCHC*954P5, Exp. 10/25/2015
BOUCHER CONSTRUCTION LLC
10 N HARMONY RD GREENACRES, WA 99016
509-953-3274
russboucher@comcast.net
DETAILS:
Class
SEWER
Type
Quantity
Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.64
$125.00
$151.64
1
$125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 04/09/2014 11:06:27 Project Coordinator: Julie Shatto
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000358 Permit Issued Date: 04/09/2014
Expiration Date: 04/09/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/09/2014 11:06:27 Project Coordinator. Julie Shatto